BLD_006448Completed8 floors
Estate 1 · Prakash Estates
Jalgaon (M Corp.) · RERA P49900002142
8Sanctioned habitable floorsregistration certificate
14 Dec 2018Promised completion
Floors
8 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 8
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 40.6 m² (437 sq.ft) | 2 | not published |
| 2BHK | 46.9 m² (505 sq.ft) | 2 | not published |
| 2BHK | 46.9 m² (505 sq.ft) | 1 | not published |
| 2BHK | 47.3 m² (509 sq.ft) | 2 | not published |
| BASEMENT | 53.4 m² (575 sq.ft) | 1 | not published |
| SHOP | 13.2 m² (142 sq.ft) | 1 | not published |
| SHOP | 19.3 m² (208 sq.ft) | 1 | not published |
| SHOP | 20.5 m² (221 sq.ft) | 1 | not published |
| Total | 11 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)100%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology