Completed

Jalgaon (M Corp.), Jalgaon 425001 |Promoter: Maya Rajesh Doshi

Residential / Group HousingRERAP49900018105
10 Oct 2018Registered with MahaRERA
30 Apr 2022Promised completion
1Building
28Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential28 units in all
Land area for this project
960 sq m (10,333 sq ft)
Permissible built-up area
2,448 sq m (26,353 sq ft)
Sanctioned built-up area
2,301 sq m (24,771 sq ft)
Address
Plot No.6 Plus 7, Sr No. 288 Plus 289 A Plus B, Near- Smit College, Old Dhule RoadPIN 425001
Designated bank account
Union Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Apr 2022

The latest completion date on record passed 4 years and 6 months ago.

Registered
10 Oct 2018
Promised
30 Apr 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001810510 Oct 201830 Apr 2022—Maya Rajesh DoshiProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Navkar Residency1128

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

28 units registered

Residential · 28 units
TypeCarpet areaUnits
Residential1,759.54 sq m · 18,940 sq ft28

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Navkar Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 20 filings listed on MahaRERA's project page

Encumbrance

Commencement certificate

Form b

Title

Form 1

Form 2a

Form 5

Form 4

Completion

Registration certificate

Others

Layout plan

Building plans

Allotment letter

Document library

  • Declaration in FORM BAffidavit.pdf · uploaded 29 Sep 2018View
  • Details of encumbrancesEncumbrance Certificate.pdf · uploaded 29 Sep 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement-1-compressed.pdf · uploaded 29 Sep 2018View
  • Copy of the legal title reportSearch Report--compressed.pdf · uploaded 29 Sep 2018View
  • Building Plan Approval (IOD)Final Plan Sheet No 1 Compressed.pdf · uploaded 29 Sep 2018View
  • Building Plan Approval (IOD)Final Plan Sheet 2 Compressed.pdf · uploaded 29 Sep 2018View
  • Copy of Layout Approval (in case of layout)Layout-1.pdf · uploaded 29 Sep 2018View
  • Proforma of Allotment letterKHAREDIKHAT_RERA_.pdf · uploaded 29 Sep 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Part Architect Completion.pdf · uploaded 23 Jan 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Navkar Form 2A.pdf · uploaded 1 Jan 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Navkar Form 4.pdf · uploaded 1 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Navkar Form 5.pdf · uploaded 1 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion-compressed.pdf · uploaded 2 Oct 2020View
  • Disclosure of sold/ booked inventoryNavkar_Residency_Sold_details.pdf · uploaded 1 Feb 2022View

Promoter documents

  • Declaration Form BAffidavit.pdf · uploaded 29 Sep 2018View
  • Legal Title reportSearch Report--compressed.pdf · uploaded 29 Sep 2018View

Technical documents

  • Building Plan ApprovalFinal Plan Sheet No 1 Compressed.pdfView
  • Building Plan ApprovalFinal Plan Sheet 2 Compressed.pdfView
  • Layout ApprovalLayout-1.pdfView

Proforma allotment letter

  • Proforma allotment letterKHAREDIKHAT_RERA_.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon (M Corp.), Jalgaon taluka

Survey, CTS, gat or plot numbers

PLOT NO.6 PLUS 7SR NO. 288 PLUS 289 A PLUS B

As published on MahaRERA's project page

PLOT NO.6 PLUS 7, SR NO. 288 PLUS 289 A PLUS B

Boundaries

North
Old Dhule Road
South
Plot No-18 And 19
East
Plot No-5
West
Plot No-8

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLalit S Rane—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology