Manas Aradhana Apartment

Completed

Jalgaon (M Corp.), Jalgaon 425001 |Promoter: Manas Developers

Residential / Group HousingRERAP49900002506
1 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
20Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK20 units in all
Land area for this project
987 sq m (10,629 sq ft)
Permissible built-up area
1,234 sq m (13,286 sq ft)
Sanctioned built-up area
1,234 sq m (13,286 sq ft)
Address
15 And 16 Of S. No. 77 Of Nimkhedi KhurdPIN 425001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.01197, 75.54514
Manas Aradhana Apartment is at latitude 21.01197, longitude 75.54514.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
1 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000025061 Aug 201731 Dec 2017—Manas DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Manas Aradhana Apartment520

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

20 units registered

2BHK · 18 units3BHK · 2 units
TypeCarpet areaUnits
2BHK34.83 sq m · 375 sq ft2
2BHK53.85 sq m · 580 sq ft6
2BHK54.15 sq m · 583 sq ft6
2BHK59.59 sq m · 641 sq ft4
3BHK70.74 sq m · 761 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000016
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Manas Aradhana Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form 1

Form 2

Form b

Registration certificate

Form 5

Form 4

Layout plan

Building plans

Allotment letter

Other

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 26 Jul 2017View
  • Details of encumbrancesEncumbrances.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architech Certificate.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterAGREEMENT TO SALE.pdf · uploaded 26 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 26 Jul 2017View
  • Building Plan Approval (IOD)IOD 1.pdf · uploaded 26 Jul 2017View
  • Building Plan Approval (IOD)IOD 2.pdf · uploaded 26 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Manas.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BNEW FORM B.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 4)Architect Cert Oct 2017.pdf · uploaded 25 Oct 2017View
  • Certificates of CA (Form 5)form 5.pdf · uploaded 25 Oct 2017View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 26 Jul 2017View
  • Declaration Form BNEW FORM B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalLayout Manas.pdfView
  • Building Plan ApprovalIOD 1.pdfView
  • Building Plan ApprovalIOD 2.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon (M Corp.), Jalgaon taluka

Survey, CTS, gat or plot numbers

1516 OF S. NO. 77 OF NIMKHEDI KHURD

As published on MahaRERA's project page

15 AND 16 OF S. NO. 77 OF NIMKHEDI KHURD

Boundaries

North
24 M Dp Road
South
Plot No 26 And 27 And 28
East
9 M Road
West
Plot No 17a

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin Pargaonkar—
ArchitectNitin Pargaonkar—
ArchitectNitin Pargaonkar—
ArchitectNitin Pargaonkar—
EngineerUjval Chaudhari—
EngineerUjval Chaudhari—
EngineerUjval Chaudhari—
EngineerUjval Chaudhari—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology