Madhuprabha Heights

Completed

Jalgaon (M Corp.), Jalgaon 425001 |Promoter: Prime Developers

18 Aug 2017Registered with MahaRERA
28 Jan 2019Promised completion
1Building
1Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1 NO FLAT 2 BHK1 unit in all
Land area for this project
504 sq m (5,425 sq ft)
Permissible built-up area
706 sq m (7,595 sq ft)
Sanctioned built-up area
706 sq m (7,595 sq ft)
Address
S No 145, PIN 425001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.85050, 75.35210
Madhuprabha Heights is at latitude 19.85050, longitude 75.35210.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Jan 2019

The latest completion date on record passed 7 years and 9 months ago.

Registered
18 Aug 2017
Promised
28 Jan 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990000833618 Aug 201728 Jan 2019—Prime DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Madhuprabha Heigths61

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1 unit registered

1 NO FLAT 2 BHK · 1 unit
TypeCarpet areaUnits
1 NO FLAT 2 BHK50.56 sq m · 544 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00007

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Madhuprabha Heigths

  • Excavation100%
  • Basement (if any)1%
  • Podiums (if any)0%
  • Plinth1%
  • Stilt Floor1%
  • Slabs of Super Structure5%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingCOMPLETED100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAVAILABLE100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

27 documents held by Deedo, 29 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Allotment letters

Registration certificate

Form 5s

Completions

Others

Layout plan

Building plan

Document library

  • Declaration in FORM B1 FORM B.pdf · uploaded 30 Jul 2017View
  • Details of encumbrances3 ENCUMB423.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)4 CERT OF ARCHI424.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5 CERT OF ENGI425.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title report8 TITLE REPORT.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted development7 COMM CERT426.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)11 BUILDING PLAN APPROVAL.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letter9 AGREE TO SALE RAKESH.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letter9 LETTER OF ALLOTMENT.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)15 LAYOUT.pdf · uploaded 31 Jul 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Admission Form for Spacial Round_20211108114428.pdf · uploaded 17 Nov 2021View
  • Declaration about Commencement CertificateCERT.pdf · uploaded 22 Apr 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)PRIME DEVELOPERS FY 2017-18.pdf · uploaded 11 Jun 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)PRIME DEVELOPERS FY 2018-19.pdf · uploaded 11 Jun 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)PRIME DEVELOPERS FY 2019-20.pdf · uploaded 11 Jun 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)PRIME DEVELOPERS FY 2020-21.pdf · uploaded 11 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentLALIT S RANE.pdf · uploaded 11 Jun 2022View
  • Architect’s Certificate on Completion of Project (Form 4)LALIT S RANE.pdf · uploaded 11 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCertificate_Basement_Ground Floor_Stilt_First Floor.pdf · uploaded 11 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCertificate_First_Second_Third Floor.pdf · uploaded 11 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCertificate_Third_Fourth Floor.pdf · uploaded 11 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCertificate_Change of use in Basement Commercial_compressed.pdf · uploaded 11 Jun 2022View
  • OtherCONDONATION.pdf · uploaded 11 Jun 2022View

Promoter documents

  • Declaration Form B1 FORM B.pdf · uploaded 30 Jul 2017View
  • Legal Title report8 TITLE REPORT.pdf · uploaded 30 Jul 2017View

Technical documents

  • Building Plan Approval11 BUILDING PLAN APPROVAL.pdfView
  • Layout Approval15 LAYOUT.pdfView

Other legal documents

  • OtherCONDONATION.pdfView

Proforma allotment letter

  • Proforma allotment letter9 LETTER OF ALLOTMENT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon (M Corp.), Jalgaon taluka

Survey, CTS, gat or plot numbers

145S NO 145

As published on MahaRERA's project page

S NO 145,

Boundaries

North
Plot No 9 10 1
South
Remaining Portion Of The Said Plot
East
Plot No 1 And 2
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLalit Rane—
EngineerUjwal Ravindra Chaudhary—

Source: MahaRERA project page. Contact details are not shown.