Skip to content
Deedo home
Menu

Vandan Heights

Lapsed

Jalgaon 425001 |Promoter: Govinda Ghanshyam Nagori

Residential / Group HousingRERAP49900025302
5 Apr 2020Registered with MahaRERA
16 Mar 2022Promised completion
1Building
20Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
1BHK, 2BHK, Shop20 units in all
Land area for this project
470 sq m (5,063 sq ft)
Permissible built-up area
782 sq m (8,415 sq ft)
Sanctioned built-up area
782 sq m (8,415 sq ft)
Address
2702/A Plot No 4 Jalgaon, Shivaji Nagar, JalgaonPIN 425001
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 16 Mar 2022

The latest completion date on record passed 4 years and 7 months ago.

Registered
5 Apr 2020
Promised
16 Mar 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000253025 Apr 202016 Mar 2022—Govinda Ghanshyam NagoriProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vandan Heights1520

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

20 units registered

1BHK · 8 units2BHK · 8 unitsShop · 4 units
TypeCarpet areaUnits
1BHK31.5 sq m · 339 sq ft8
2BHK44.05 sq m · 474 sq ft8
Shop10.03 sq m · 108 sq ft2
Shop10.56 sq m · 114 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000016

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vandan Heights1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTUBEWELL 1 NO.100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)READY100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingUNDERGOING20%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingUNDERGOING20%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingREADY100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Registration certificate

Form 2as

Others

Layout plan

Building plan

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 19 Mar 2020View
  • Details of encumbrancescertificate of encumbrances.pdf · uploaded 19 Mar 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 19 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 19 Mar 2020View
  • Declaration in FORM BFORM B.pdf · uploaded 19 Mar 2020View
  • Proforma of Allotment letterCOMPRESS AGREE TO SALE AND ALLOT LETTER.pdf · uploaded 19 Mar 2020Source
  • Building Plan Approval / NA Order for plotted developmentSANCTIONED BUILDING.pdf · uploaded 19 Mar 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)19-20.pdf · uploaded 3 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)20-21.pdf · uploaded 3 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)21-22.pdf · uploaded 3 Jun 2023View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 19 Mar 2020View
  • Declaration Form BFORM B.pdf · uploaded 19 Mar 2020View

Technical documents

  • Layout ApprovalLAYOUT.pdfView
  • Building Plan ApprovalSANCTIONED BUILDING.pdfView

Proforma allotment letter

  • Proforma allotment letterCOMPRESS AGREE TO SALE AND ALLOT LETTER.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon, Jalgaon taluka

Survey, CTS, gat or plot numbers

2702/A PLOT NO 4 JALGAON

As published on MahaRERA's project page

2702/A PLOT NO 4 JALGAON

Boundaries

North
Open Space A And Plot No 19
South
Road
East
Plot No 03
West
Plot No 05

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVijaykumar Narayanrao Patil—
Chartered accountantRahul Prakash Patil—
EngineerMohit Arun Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology