BLD_008043Promised date passed6 floors
Shiv Naman · Shiv Naman
Jalgaon · RERA P49900051276
6Sanctioned habitable floorsregistration certificate
31 Mar 2025Promised completion
Floors
6 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 6
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 55.7 m² (599 sq.ft) | 4 | not published |
| 2BHK | 56.3 m² (606 sq.ft) | 4 | not published |
| 2BHK | 57.8 m² (622 sq.ft) | 4 | not published |
| 2BHK | 68 m² (731 sq.ft) | 1 | not published |
| Office space | 13.1 m² (141 sq.ft) | 1 | not published |
| Office space | 14.6 m² (157 sq.ft) | 1 | not published |
| Office space | 14.7 m² (158 sq.ft) | 1 | not published |
| Office space | 15.4 m² (166 sq.ft) | 1 | not published |
| Office space | 17.8 m² (191 sq.ft) | 1 | not published |
| Office space | 18.3 m² (197 sq.ft) | 1 | not published |
| Shop | 12.1 m² (131 sq.ft) | 1 | not published |
| Shop | 15.3 m² (164 sq.ft) | 2 | not published |
| Shop | 16 m² (172 sq.ft) | 1 | not published |
| Shop | 70.9 m² (763 sq.ft) | 1 | not published |
| Total | 24 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises95%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology