Skip to content
Deedo home
Menu

Shiv Maan Heights

Lapsed

Jalgaon 425001 |Promoter: Jain Infra

8 Jun 2023Registered with MahaRERA
31 Mar 2026Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
672 sq m (7,238 sq ft)
Permissible built-up area
3,168 sq m (34,095 sq ft)
Sanctioned built-up area
2,868 sq m (30,866 sq ft)
Planning authority
Jalgaon Municipal Corporation
Address
Plot No 16 + 17, Survey No 77, 100 Ft Road, Julalsing WadiPIN 425001
Designated bank account
Icici Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.00432, 75.54077
Shiv Maan Heights is at latitude 21.00432, longitude 75.54077.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2026

The latest completion date on record passed 7 months ago.

Registered
8 Jun 2023
Promised
31 Mar 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000513608 Jun 202331 Mar 2026—Jain InfraProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shiv Maan Heights9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered43140057
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shiv Maan Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)UNDERGROUND SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER JMC GUIDELINES100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER JMC GUIDELINES100%
  • Electrical meter room, sub-station, receiving stationCOMMON ELCTRICAL METER ROOM IN PARKING100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER JMC GUIDELINES100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

64 documents held by Deedo, 98 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificates

Form b

Others

Allotment letters

Registration certificate

Form 1s

Form 2s

Form 2as

Form 5s

Layout plan

Building plans

Document library

  • Copy of the legal title reportSearch Report 2 upload.pdf · uploaded 5 Apr 2023View
  • CERSAI detailsCERSAI 77-16.pdf · uploaded 5 Apr 2023View
  • a Details of encumbrances concerned to FinanceNon Encumbrance signed.pdf · uploaded 5 Apr 2023View
  • b Details of encumbrances concerned to LegalNon Encumbrance signed.pdf · uploaded 5 Apr 2023View
  • Copy of Layout Approval (in case of layout)Layout 2 upload.pdf · uploaded 5 Apr 2023View
  • Building Plan Approval / NA Order for plotted developmentApproved Plan 2 upload.pdf · uploaded 5 Apr 2023View
  • Commencement Certificates / NA Order for plotted developmentNA Order 2 upload.pdf · uploaded 5 Apr 2023View
  • Commencement Certificates / NA Order for plotted developmentCommencement permission 2 upload.pdf · uploaded 5 Apr 2023View
  • Declaration in FORM BForm B 2 Upload.pdf · uploaded 5 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 5 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 5 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 5 Apr 2023View
  • Proforma of Allotment letterAllottment Signed 2 upload.pdf · uploaded 5 Apr 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 5 Apr 2023View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 5 Apr 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDOI shiv Maan_compressed.pdf · uploaded 6 Apr 2023View
  • Deviation Report with respect to Allotment letterDL AL.pdf · uploaded 6 Apr 2023View
  • Proforma of Agreement for saleAFS Final_compressed-1-15.pdf · uploaded 18 Apr 2023View
  • Proforma of Agreement for saleAFS Final_compressed-16-30.pdf · uploaded 18 Apr 2023View
  • Proforma of Agreement for saleAFS Final_compressed-31-38.pdf · uploaded 18 Apr 2023View
  • Deviation Report with respect to model copy of AgreementNo deviation in AFS of Shiv Maan to upload.pdf · uploaded 3 May 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form130june2023uploaded.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form130sept2023uploaded.pdf · uploaded 27 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form230june2023.pdf · uploaded 27 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form230sept2023.pdf · uploaded 27 Nov 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 1 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 31122023.pdf · uploaded 1 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31122023.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)3Form2A30062023.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)3Form2A30092023.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 31122023.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 31032024.pdf · uploaded 1 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)3Form2A30092023.pdf · uploaded 6 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 31032024.pdf · uploaded 6 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31032024.pdf · uploaded 6 Jun 2024View
  • Disclosure of sold/ booked inventoryQ1.pdf · uploaded 6 Jun 2024View
  • Disclosure of sold/ booked inventoryQ2.pdf · uploaded 6 Jun 2024View
  • Disclosure of sold/ booked inventoryQ3.pdf · uploaded 6 Jun 2024View
  • Disclosure of sold/ booked inventoryQ4.pdf · uploaded 6 Jun 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsQ3.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 10 Aug 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 10 Aug 2024View
  • Disclosure of sold/ booked inventoryQ1.pdf · uploaded 10 Aug 2024View
  • Building Plan Approval / NA Order for plotted developmentUpdated Plan.pdf · uploaded 10 Aug 2024View
  • Commencement Certificates / NA Order for plotted developmentUpdated CC.pdf · uploaded 10 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 30092024.pdf · uploaded 17 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 30092024.pdf · uploaded 17 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form2A 30092024.pdf · uploaded 17 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form5 30092024.pdf · uploaded 17 Jan 2025View
  • Disclosure of sold/ booked inventoryQ2FY2425.pdf · uploaded 17 Jan 2025View
  • Disclosure of sold/ booked inventoryQ3FY2425.pdf · uploaded 17 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1Q3FY2425.pdf · uploaded 29 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2Q3FY2425.pdf · uploaded 29 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2AQ3FY2425.pdf · uploaded 29 Jan 2025View
  • Form 2A (FY 2024-2025)FORM2AQ4FY2425.pdf · uploaded 4 Jul 2025View
  • Form 1FORM1Q3FY2425.pdf · uploaded 4 Jul 2025View
  • Form 2FORM2Q3FY2425.pdf · uploaded 4 Jul 2025View
  • Disclosure of Sold and Booked InventoryQ3FY2425.pdf · uploaded 4 Jul 2025View
  • OthersFORM2AQ3FY2425.pdf · uploaded 4 Jul 2025View
  • Form 1Form1 30092024.pdf · uploaded 4 Jul 2025View
  • Form 2Form2 30092024.pdf · uploaded 4 Jul 2025View
  • Disclosure of Sold and Booked InventoryQ2FY2425.pdf · uploaded 4 Jul 2025View
  • OthersForm5 30092024.pdf · uploaded 4 Jul 2025View
  • Form 1Form 1.pdf · uploaded 4 Jul 2025View
  • Form 2Form 2.pdf · uploaded 4 Jul 2025View
  • OthersForm 2A.pdf · uploaded 4 Jul 2025View
  • Disclosure of Sold and Booked InventoryQ1.pdf · uploaded 4 Jul 2025View
  • Form 11Form130062023.pdf · uploaded 8 Aug 2025View
  • Form 22Form230062023.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryQ1.pdf · uploaded 8 Aug 2025View
  • Form 11Form130092023.pdf · uploaded 8 Aug 2025View
  • Form 22Form230092023.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryQ2.pdf · uploaded 8 Aug 2025View
  • Form 1Form1 31122023.pdf · uploaded 8 Aug 2025View
  • Form 2Form 2 31122023.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryQ3.pdf · uploaded 8 Aug 2025View
  • Form 1Form1 31032024.pdf · uploaded 8 Aug 2025View
  • Form 2Form 2 31032024.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryQ4.pdf · uploaded 8 Aug 2025View
  • Form 1FORM1Q4FY2425.pdf · uploaded 8 Aug 2025View
  • Form 2FORM2Q4FY2425.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryUIQ4FY2425.pdf · uploaded 8 Aug 2025View
  • Form 11Form1Q1FY2526ShivMaan.pdf · uploaded 8 Aug 2025View
  • Form 22Form2Q1FY2526ShivNaman.pdf · uploaded 8 Aug 2025View
  • Disclosure of Sold and Booked InventoryUIQ1FY2526.pdf · uploaded 8 Aug 2025View
  • Form 2A (FY 2023-2024)Form 2A 31032024.pdf · uploaded 8 Aug 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 12 Dec 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 12 Dec 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 20 Feb 2026View

Promoter documents

  • Legal Title reportSearch Report 2 upload.pdf · uploaded 5 Apr 2023View
  • Declaration Form BForm B 2 Upload.pdf · uploaded 5 Apr 2023View

Technical documents

  • Layout ApprovalLayout 2 upload.pdfView
  • Building Plan ApprovalApproved Plan 2 upload.pdfView
  • Building Plan ApprovalUpdated Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAllottment Signed 2 upload.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon, Jalgaon taluka

Survey, CTS, gat or plot numbers

77PLOT NO 16 + 17SURVEY NO 77

As published on MahaRERA's project page

PLOT NO 16 + 17, SURVEY NO 77

Boundaries

North
Survey No 78
South
Road
East
Road
West
Plot No 15 Of Survey No 77

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Mukund—
Chartered accountantNachiket Jakhetiya—
EngineerHemant S Chavan—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology