Jalgaon 425001 |Promoter: Jalgaon Projects Pvt Ltd

25 Aug 2022Registered with MahaRERA
31 Mar 2025Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Land area for this project
364 sq m (3,921 sq ft)
Permissible built-up area
1,259 sq m (13,552 sq ft)
Sanctioned built-up area
1,259 sq m (13,552 sq ft)
Address
Plot No 2, Gat No 28, Plot No 2, Gat No 28, Pimprala Shivar, Near Smit CollegePIN 425001
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.01793, 75.54352
Omkara Residency is at latitude 21.01793, longitude 75.54352.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
25 Aug 2022
Promised
31 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990004661725 Aug 202231 Mar 2025—Jalgaon Projects Pvt LtdProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P49900046617)——
Omkara Residency8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Omkara Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingDone100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingDone100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

49 documents held by Deedo, 59 filings listed on MahaRERA's project page

Title report

Commencement certificate (3)

Form B

Form 2 (8)

Show all 108 documentsShow fewer documents

Form 2 (8)

Other (14)

Encumbrance details (5)

Allotment letter (3)

Form 1 (4)

Form 2A (2)

Form 5 (2)

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate12 Mar 2024ViewSource

Form 4

Layout plan

Building plan (2)

Document library

  • Declaration about Commencement CertificateDeclaration_compressed (1).pdf · uploaded 17 Jul 2022View
  • CERSAI detailsCERSAI_Search_Report_200241618561_For_Asset_Based_Search_07_07_2022_11_32_53_017.pdf · uploaded 17 Jul 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)mukund associates engineers cert.pdf · uploaded 17 Jul 2022View
  • Copy of Layout Approval (in case of layout)Copy of Layout.pdf · uploaded 17 Jul 2022View
  • Building Plan Approval / NA Order for plotted developmentOld Plan_compressed (1).pdf · uploaded 17 Jul 2022View
  • Building Plan Approval / NA Order for plotted developmentsanction plan_compressed.pdf · uploaded 17 Jul 2022View
  • Commencement Certificates / NA Order for plotted developmentsanction Permit_compressed.pdf · uploaded 17 Jul 2022View
  • Commencement Certificates / NA Order for plotted developmentOLD Approval_compressed.pdf · uploaded 17 Jul 2022View
  • Copy of the legal title reportLSR.pdf · uploaded 17 Jul 2022View
  • Declaration in FORM BFORM B.pdf · uploaded 17 Jul 2022View
  • a Details of encumbrances concerned to FinanceEncumbrance Finance.pdf · uploaded 3 Aug 2022View
  • Deviation Report with respect to model copy of AgreementDev wrt Model copy of Agreement.pdf · uploaded 3 Aug 2022View
  • Deviation Report with respect to Allotment letterDev wrt Allotment letter.pdf · uploaded 3 Aug 2022View
  • Proforma of Allotment letterAgreement for sale_compressed (1).pdf · uploaded 3 Aug 2022View
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 3 Aug 2022View
  • b Details of encumbrances concerned to LegalLEGAL.pdf · uploaded 3 Aug 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameJalgaon project 34.pdf · uploaded 16 Aug 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Cert.pdf · uploaded 8 Dec 2022View
  • Disclosure of sold/ booked inventoryinventory.pdf · uploaded 8 Dec 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank details.pdf · uploaded 12 Dec 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 4 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate (UT) (2).pdf · uploaded 4 Feb 2023View
  • CERSAI detailsCERSAI_Search_Report_200259527058_For_Asset_Based_Search_04_02_2023_16_32_11_865.pdf · uploaded 4 Feb 2023View
  • a Details of encumbrances concerned to FinanceDetails of Encumbrance.pdf · uploaded 8 Feb 2023View
  • b Details of encumbrances concerned to LegalDetails of Encumbrance.pdf · uploaded 8 Feb 2023View
  • Disclosure of sold/ booked inventoryBooking status december.pdf · uploaded 10 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's .pdf · uploaded 20 Apr 2023View
  • Disclosure of sold/ booked inventoryInventory-5.pdf · uploaded 20 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)jp archi.pdf · uploaded 21 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1JALGAONPROJECTSFY2324Q1.pdf · uploaded 4 Aug 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2JALGAONPROJECTSFY2324Q1.pdf · uploaded 4 Aug 2023View
  • Disclosure of sold/ booked inventoryBOOKINGSTATUSJALGAONPROJECTSFY2324Q1.pdf · uploaded 4 Aug 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)JALGAON PROJECT ENGINEERS CIRTIFICATE (1).pdf · uploaded 23 Sep 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - JPPL.pdf · uploaded 23 Sep 2023View
  • Disclosure of sold/ booked inventoryINVENTORY CERTIFICATE.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 20 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGEINEERS CERTIFICATE.pdf · uploaded 20 Oct 2023View
  • Disclosure of sold/ booked inventoryInventory status Dec 23 Jalgaon projects.pdf · uploaded 6 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Jp dec en.pdf · uploaded 12 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Mohit A Patil Engineers Certificate .pdf · uploaded 21 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mukund Architect Cerificate jalgaon projects.pdf · uploaded 21 Feb 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCert_FO_347219_372iuuTOSign jalgaon project.pdf · uploaded 12 Mar 2024View
  • Architect’s Certificate on Completion of Project (Form 4)jalgaon Project Mukund 09-03-2024 (2).pdf · uploaded 12 Mar 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A JJPL.pdf · uploaded 20 Jul 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)DOD PART 1.pdf · uploaded 24 Dec 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)DOD PART 2.pdf · uploaded 24 Dec 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)DOD PART 3.pdf · uploaded 24 Dec 2024View
  • Status of ConveyanceDOD PART 1.pdf · uploaded 24 Dec 2024View
  • Status of ConveyanceDOD PART 2.pdf · uploaded 24 Dec 2024View
  • Status of ConveyanceDOD PART 3.pdf · uploaded 24 Dec 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)oMKARA.pdf · uploaded 25 Dec 2024View
  • Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 10 May 2025View
  • Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 10 May 2025View

Promoter documents

  • Legal Title reportLSR.pdf · uploaded 17 Jul 2022View
  • Declaration Form BFORM B.pdf · uploaded 17 Jul 2022View

Technical documents

  • Layout ApprovalCopy of Layout.pdfView
  • Building Plan ApprovalOld Plan_compressed (1).pdfView
  • Building Plan Approvalsanction plan_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon, Jalgaon taluka

Survey, CTS, gat or plot numbers

228GAT NO 28PLOT NO 2

As published on MahaRERA's project page

PLOT NO 2, GAT NO 28

Boundaries

North
Plot No 3
South
15 Meter Road
East
9 Meter Road
West
Plot No 1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Amukund—
Chartered accountantRahulbhikamchandjain—
EngineerMohit A Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology