Shree Swami Samarth Sankul

Completed

Chopda (M Cl), Jalgaon 425107 |Promoter: Kadam And Patil Developers

5 Oct 2021Registered with MahaRERA
31 Mar 2023Promised completion
1Building
34Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK, Shop34 units in all
Land area for this project
1,040 sq m (11,194 sq ft)
Permissible built-up area
1,389 sq m (14,950 sq ft)
Sanctioned built-up area
1,389 sq m (14,950 sq ft)
Address
Plot No 05 Part Plus 07 Plus 08 Plus 09 Plus 10 S No/Gat No 1105 Plus 1106, Yawal Road, ChopdaPIN 425107
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shree Swami Samarth Sankul is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
5 Oct 2021
Promised
31 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000311245 Oct 202131 Mar 2023—Kadam And Patil DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shree Swami Samarth Sankul534

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

34 units registered

1BHK · 2 units2BHK · 6 unitsShop · 26 units
TypeCarpet areaUnits
1BHK45.96 sq m · 495 sq ft2
2BHK55.99 sq m · 603 sq ft2
2BHK59.71 sq m · 643 sq ft4
Shop23.1 sq m · 249 sq ft1
Shop24.4 sq m · 263 sq ft1
Shop24.48 sq m · 264 sq ft1
Shop24.7 sq m · 266 sq ft1
Shop25.1 sq m · 270 sq ft5
Shop25.51 sq m · 275 sq ft2
Shop25.77 sq m · 277 sq ft1
Shop25.83 sq m · 278 sq ft1
Shop26.06 sq m · 281 sq ft2
Shop26.2 sq m · 282 sq ft1
Shop26.63 sq m · 287 sq ft1
Shop26.65 sq m · 287 sq ft4
Shop27.06 sq m · 291 sq ft2
Shop27.4 sq m · 295 sq ft1
Shop27.51 sq m · 296 sq ft1
Shop27.57 sq m · 297 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Swami Samarth Sankul

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL AND NMC WATER CONNECTION AFTER COMPLATION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingONLY RAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY ELECTRICAL METER BOX0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 18 filings listed on MahaRERA's project page

Allotment letters

Commencement certificates

Form b

Encumbrance

Title

Registration certificate

Form 2a

Completion

Form 4

Form 5

Others

Layout plan

Document library

  • Copy of Layout Approval (in case of layout)Building Plan.pdf · uploaded 12 Aug 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 12 Aug 2021View
  • Commencement Certificates / NA Order for plotted developmentNew Commencement Cerificate.pdf · uploaded 12 Aug 2021View
  • Proforma of Allotment letterAgreement Draft.pdf · uploaded 12 Aug 2021View
  • Declaration in FORM BForm B_Developers_compressed.pdf · uploaded 12 Aug 2021View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 20 Aug 2021View
  • Details of encumbrancesNC.pdf · uploaded 20 Aug 2021View
  • Declaration about Commencement CertificateForm D.pdf · uploaded 20 Aug 2021View
  • Copy of the legal title reportNew Title Report.pdf · uploaded 29 Sep 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENGINEERS CERTIFICATE.pdf · uploaded 4 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentcomplition certificate.pdf · uploaded 6 Jan 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 (1).pdf · uploaded 6 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA Audit Report FY21-22.pdf · uploaded 7 Jan 2023View

Promoter documents

  • Declaration Form BForm B_Developers_compressed.pdf · uploaded 12 Aug 2021View
  • Legal Title reportNew Title Report.pdf · uploaded 29 Sep 2021View

Technical documents

  • Layout ApprovalBuilding Plan.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chopda (M Cl), Chopda taluka

Survey, CTS, gat or plot numbers

PLOT NO 05 PART PLUS 07 PLUS 08 PLUS 09 PLUS 10 S NO/GAT NO 1105 PLUS 1106

As published on MahaRERA's project page

PLOT NO 05 PART PLUS 07 PLUS 08 PLUS 09 PLUS 10 S NO/GAT NO 1105 PLUS 1106

Boundaries

North
Road
South
Chopda - Yawal Road
East
Municipal Corporation Aliasgar Bohri
West
Gat No 1107 Plot No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh C Bhaviskar—
Chartered accountantVardhaman S Bhandari—
EngineerSagar Bhavsar—
OtherNafiz Patel—
OtherRushab Badgujar—

Source: MahaRERA project page. Contact details are not shown.