Orange City

Completed

Chopda (M Cl), Jalgaon 425107 |Promoter: M/S Dbp Developers

Residential / Group HousingRERAP49900020492
18 Apr 2019Registered with MahaRERA
30 Aug 2019Promised completion
1Building
18Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK18 units in all
Land area for this project
1,249 sq m (13,449 sq ft)
Permissible built-up area
1,461 sq m (15,728 sq ft)
Sanctioned built-up area
1,461 sq m (15,728 sq ft)
Address
Plot No 1 Plus 2 Of Gut No 1061/2, Chopda, ChopdaPIN 425107
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Orange City is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Aug 2019

The latest completion date on record passed 7 years and 2 months ago.

Registered
18 Apr 2019
Promised
30 Aug 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990002049218 Apr 201930 Aug 2019—M/S Dbp DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Orange City518

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

18 units registered

2BHK · 18 units
TypeCarpet areaUnits
2BHK59.02 sq m · 635 sq ft1
2BHK60.2 sq m · 648 sq ft3
2BHK65.95 sq m · 710 sq ft4
2BHK66.95 sq m · 721 sq ft1
2BHK67.87 sq m · 731 sq ft3
2BHK68.15 sq m · 734 sq ft3
2BHK68.19 sq m · 734 sq ft3

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Orange City

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOAWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingONLY TREE PLANTING80%
  • Street LightingSTREET LAMPS TO BE PROVIDED0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingONLY RAIN WATER HARVESTING50%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Protection50%
  • Electrical meter room, sub-station, receiving stationELECTRIC METER ROOM ONLY50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 39 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Registration certificate

Form 5

Occupancy / completion certificate (2)

  • Occupancy / completion certificate12 Aug 2021ViewSource
  • Occupancy / completion certificate12 Aug 2021ViewSource

Other (12)

Show all 62 documentsShow fewer documents

Other (12)

Form 2

Layout plan (2)

Allotment letter

Document library

  • Declaration in FORM B1 Form B.pdf · uploaded 22 Mar 2019View
  • Details of encumbrances3 No Encumbrance Certificate.pdf · uploaded 22 Mar 2019View
  • Commencement Certificates / NA Order for plotted development5 Commencement.pdf · uploaded 22 Mar 2019Source
  • Copy of the legal title report6 Legal Title Report.pdf · uploaded 22 Mar 2019View
  • Proforma of Allotment letter8 agreement for sale.pdf · uploaded 29 Mar 2019View
  • OtherClarification Letter.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 1-1-5.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 1-6-10.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 1-11-15.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 2-1-5.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 2-6-9.pdf · uploaded 2 Apr 2019View
  • OtherSale Deed 2-10-13.pdf · uploaded 2 Apr 2019View
  • OtherPartnership Deed.pdf · uploaded 2 Apr 2019View
  • Building Plan Approval (IOD)Plan Orange City_.pdf · uploaded 13 Apr 2019View
  • Copy of Layout Approval (in case of layout)Plan Orange City_.pdf · uploaded 13 Apr 2019View
  • Building Plan Approval (IOD)Plan_.pdf · uploaded 13 Apr 2019View
  • Copy of Layout Approval (in case of layout)Plan_.pdf · uploaded 13 Apr 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)DBP-RERA Audit Report.pdf · uploaded 13 May 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 12 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy.pdf · uploaded 12 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration-1-21.pdf · uploaded 12 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration-22-43-1-11.pdf · uploaded 12 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration-22-43-12-22.pdf · uploaded 12 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Details.pdf · uploaded 19 Dec 2023View

Promoter documents

  • Declaration Form B1 Form B.pdf · uploaded 22 Mar 2019View
  • Legal Title report6 Legal Title Report.pdf · uploaded 22 Mar 2019View

Technical documents

  • Building Plan ApprovalPlan Orange City_.pdfView
  • Building Plan ApprovalPlan_.pdfView
  • Layout ApprovalPlan Orange City_.pdfView
  • Layout ApprovalPlan_.pdfView

Other legal documents

  • OtherClarification Letter.pdfView
  • OtherSale Deed 1-1-5.pdfView
  • OtherSale Deed 1-6-10.pdfView
  • OtherSale Deed 1-11-15.pdfView
  • OtherSale Deed 2-1-5.pdfView
  • OtherSale Deed 2-6-9.pdfView
  • OtherSale Deed 2-10-13.pdfView
  • OtherPartnership Deed.pdfView

Proforma allotment letter

  • Proforma allotment letter8 agreement for sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

PLOT NO 1 PLUS 2 OF GUT NO 1061/2PLOT NO 1 PLUS 2 OF GUT NO 1061/2 at Chopda

As published on MahaRERA's project page

PLOT NO 1 PLUS 2 OF GUT NO 1061/2

Boundaries

North
Chopda Gorganvale Road
South
Plot No 13 14
East
Plot No 3
West
S No 1061

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHemant B Isai—
EngineerHemant B Isai—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology