Gokuldas Housing

Lapsed

Bhadli Bk, Jalgaon 425107 |Promoter: Gokuldas Housing

Residential / Group HousingRERAP49900049845
6 Mar 2023Registered with MahaRERA
31 Dec 2025Promised completion
8Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
8
Land area for this project
790 sq m (8,507 sq ft)
Permissible built-up area
869 sq m (9,356 sq ft)
Sanctioned built-up area
869 sq m (9,356 sq ft)
Planning authority
Chopada Municipal Council
Address
Plot No 26, Revenue G No. 1586, Mouje Chopda, Old Shirpur Road Indiratai Nagar 425102, Old Shirpur Road, Indiratai NagarPIN 425107
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.24553, 75.27788
Gokuldas Housing is at latitude 21.24553, longitude 75.27788.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2025

The latest completion date on record passed 10 months ago.

Registered
6 Mar 2023
Promised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000498456 Mar 202331 Dec 2025—Gokuldas HousingProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Block A1—
Block B1—
Block C1—
Block D1—
Block E1—
Block F1—
Block G1—
Block H1—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block AClosed/Covered00000
Block AOpen Space10001
Block BClosed/Covered00000
Block BOpen Space10001
Block CClosed/Covered00000
Block COpen Space10001
Block DClosed/Covered00000
Block DOpen Space10001
Block EClosed/Covered00000
Block EOpen Space10001
Block FClosed/Covered00000
Block FOpen Space10001
Block GClosed/Covered00000
Block GOpen Space10001
Block HClosed/Covered00000
Block HOpen Space10001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Block A

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block B

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block C

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block D

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block E

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block F

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block G

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block H

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAs Per Building Plan0%
  • Water SupplyBorewell and CMC Water Connection After Completion60%
  • Sewerage (Chamber, Lines, Septic Tank , STP)No STP60%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingOnly Tree Planting100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingOnly Rain Water Harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationOnly Electric Meter Box0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

39 documents held by Deedo, 68 filings listed on MahaRERA's project page

Titles

Encumbrances

Commencement certificates

Form b

Allotment letters

Others

Registration certificate

Form 1s

Form 2s

Form 5

Form 2as

Layout plan

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 7 Feb 2023View
  • a Details of encumbrances concerned to FinanceFinance.pdf · uploaded 7 Feb 2023View
  • b Details of encumbrances concerned to LegalFinance.pdf · uploaded 7 Feb 2023View
  • Copy of Layout Approval (in case of layout)Building Plan.pdf · uploaded 7 Feb 2023View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 7 Feb 2023View
  • Commencement Certificates / NA Order for plotted developmentCommecment Certificate.pdf · uploaded 7 Feb 2023View
  • Declaration about Commencement CertificateForm D.pdf · uploaded 7 Feb 2023View
  • Declaration in FORM BForm B (1).pdf · uploaded 7 Feb 2023View
  • Proforma of Allotment letterAllotment (1).pdf · uploaded 7 Feb 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameForm A.pdf · uploaded 7 Feb 2023View
  • Deviation Report with respect to Allotment letterdeviation of allotment.pdf · uploaded 7 Feb 2023View
  • a Details of encumbrances concerned to FinanceLegal.pdf · uploaded 23 Feb 2023View
  • b Details of encumbrances concerned to LegalLegal.pdf · uploaded 23 Feb 2023View
  • Copy of the legal title reportTitle Report 2 compressed.pdf · uploaded 23 Feb 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure Merged.pdf · uploaded 2 Mar 2023View
  • CERSAI detailsCERSAI details.pdf · uploaded 2 Mar 2023View
  • Proforma of Agreement for saleGokuldas Housing _Agreement for Sale.pdf · uploaded 3 Mar 2023View
  • Deviation Report with respect to model copy of AgreementDevi of AFS_Edited.pdf · uploaded 3 Mar 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 8 May 2024View
  • Disclosure of sold/ booked inventoryDisclosure Sold unsold.pdf · uploaded 8 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginner -Sept-23.pdf · uploaded 23 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginner -Dec-23.pdf · uploaded 23 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginner -March-24.pdf · uploaded 23 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Certificate-Sept 23 - converted.pdf · uploaded 23 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR Cer- Dec23 - converted.pdf · uploaded 23 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect-March-24 - converted.pdf · uploaded 23 May 2024View
  • Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 28 May 2024View
  • Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 1 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR Certificate - sign final.pdf · uploaded 16 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ER Certificate - sign Final.pdf · uploaded 16 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 29 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)DBP -Form 5 sign copy.pdf · uploaded 16 Nov 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)DBP -Form 5 sign copy.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)DBP - CA Final.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ER Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)DBP - CA Final.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ER Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ER Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ER Certi sep 24.pdf · uploaded 16 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ER DEC 24.pdf · uploaded 20 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR dec24_compressed.pdf · uploaded 20 Jan 2025View
  • Disclosure of sold/ booked inventoryDisclosure Dec24.pdf · uploaded 20 Jan 2025View
  • Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 5 May 2025View
  • Other – TechnicalForm 2A.pdf · uploaded 5 May 2025View
  • Form 1AR - March 25.pdf · uploaded 25 Aug 2025View
  • Form 2ER - March 25.pdf · uploaded 25 Aug 2025View
  • Disclosure of Sold and Booked InventoryDisclosure.pdf · uploaded 25 Aug 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 13 Oct 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 15 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 15 Oct 2025View
  • Withdrawal Update Form 1AR - March 25.pdf · uploaded 15 Oct 2025View
  • Withdrawal Update Form 2ER - March 25.pdf · uploaded 15 Oct 2025View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 7 Feb 2023View
  • Declaration Form BForm B (1).pdf · uploaded 7 Feb 2023View
  • Legal Title reportTitle Report 2 compressed.pdf · uploaded 23 Feb 2023View

Technical documents

  • Layout ApprovalBuilding Plan.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letterAllotment (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhadli Bk, Jalgaon taluka

Survey, CTS, gat or plot numbers

Plot No 26Revenue G No. 1586

As published on MahaRERA's project page

Plot No 26, Revenue G No. 1586, Mouje Chopda, Old Shirpur Road Indiratai Nagar 425102

Boundaries

North
Open Space
South
24 Meter Wide Road
East
15 Meter Wide Road
West
Aminity Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh C Baaviskar—
ArchitectSantosh C Baviskar—
Chartered accountantCA Paresh Sabadra—
Chartered accountantP N Sabadra and Associates—
Chartered accountantRSPH & Associates—
EngineerSantosh C Baaviskar—
EngineerSantosh C Baaviskar—
EngineerSantosh C Baviskar—
OtherDipak Bhanudas Patil—
OtherSantosh C Baviskar—

Source: MahaRERA project page. Contact details are not shown.