Sunshine Tower

Completed

Amalner (M Cl), Jalgaon 425401 |Promoter: Sachin Suryakant Bhamre

12 May 2022Registered with MahaRERA
31 Dec 2025Promised completion
1Building
27Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK, Shop27 units in all
Land area for this project
860 sq m (9,262 sq ft)
Permissible built-up area
1,071 sq m (11,529 sq ft)
Sanctioned built-up area
1,071 sq m (11,529 sq ft)
Address
T P No 169/C, Tp No 169c, AmalnerPIN 425401
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Sunshine Tower is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2025

The latest completion date on record passed 10 months ago.

Registered
12 May 2022
Promised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990004533112 May 202231 Dec 2025—Sachin Suryakant BhamreProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sunshine Apartment527

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

27 units registered

1BHK · 6 units2BHK · 18 unitsShop · 3 units
TypeCarpet areaUnits
1BHK33.3 sq m · 358 sq ft6
2BHK41.12 sq m · 443 sq ft18
Shop11.9 sq m · 128 sq ft3

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000010
Open Space00005

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sunshine Apartment

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & Footpaths426.72 SqmT100%
  • Water SupplyPROCESS50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)PROCESS50%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPROCESS100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationPROCESS50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 15 filings listed on MahaRERA's project page

Commencement certificate (2)

Form B

Title report

Encumbrance details

Other (2)

Registration certificate

Show all 27 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate20 May 2025ViewSource

Layout plan

Building plan

Allotment letter

Document library

  • Commencement Certificates / NA Order for plotted developmentCommensement Certificate.pdf · uploaded 2 Mar 2021View
  • Declaration in FORM BAffidavit cum Declaration1.pdf · uploaded 9 Nov 2021View
  • Copy of Layout Approval (in case of layout)Layout Plan.PDF · uploaded 9 Nov 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan2.pdf · uploaded 3 Jan 2022View
  • Copy of the legal title report02 legal title report1.pdf · uploaded 3 Jan 2022View
  • Proforma of Allotment letter19 Proforma allotment.pdf · uploaded 3 Jan 2022View
  • Details of encumbrances03 Details of Encrumances.pdf · uploaded 14 Jan 2022View
  • Declaration about Commencement Certificate07 Delacaration about Commnecement.pdf · uploaded 14 Jan 2022View
  • CERSAI details12 Declaration about CERSAI.pdf · uploaded 14 Jan 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSSK COSTRUCTION.pdf · uploaded 20 May 2025View

Promoter documents

  • Declaration Form BAffidavit cum Declaration1.pdf · uploaded 9 Nov 2021View
  • Legal Title report02 legal title report1.pdf · uploaded 3 Jan 2022View

Technical documents

  • Layout ApprovalLayout Plan.PDFView
  • Building Plan ApprovalBuilding Plan2.pdfView

Proforma allotment letter

  • Proforma allotment letter19 Proforma allotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Quarterly progress report not filedMatched by RERA number

    Quarterly progress report not filed: SUNSHINE TOWER

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amalner (M Cl), Amalner taluka

Survey, CTS, gat or plot numbers

T P NO 169/C

As published on MahaRERA's project page

T P NO 169/C

Boundaries

North
Tp No 169b
South
Tp No 162
East
Tp No 139
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectN. J. Bhandarkr—
Chartered accountantAmit Ganar—
EngineerSanjay Patil—

Source: MahaRERA project page. Contact details are not shown.