Sinhgad · Sinhagad
Amalner (M Cl) · RERA P49900009736
IDBLD_0065342 floorsCompleted
2Sanctioned habitable floorsregistration certificate
8 Jan 2020Revised completionpromised 1 Dec 2019
Floors
2 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P49900009736 · registered 22 Aug 2017
- Promised completion
- 1 Dec 2019
- Revised completion
- 8 Jan 2020
- Sanctioned habitable floors
- 2
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 70.2 m² (756 sq.ft) | 8 | not published |
| Shop | 16.2 m² (174 sq.ft) | 5 | not published |
| Shop | 17 m² (183 sq.ft) | 3 | not published |
| Shop | 34 m² (366 sq.ft) | 1 | not published |
| Total | 17 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 8 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation0%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth0%
- Stilt Floor0%
- Slabs of Super Structure0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
- Sanitary Fittings within the flats / premises0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology
