BLD_006461Promised date passed10 floors

Building No 5 - Type A Wing B · Shree N T Mundada Park - Blg No 5

Amalner (M Cl) · RERA P49900007176

10Sanctioned habitable floorsregistration certificate
30 Jun 2026Promised completion

Floors

10 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900007176 · registered 17 Aug 2017
Promised completion
30 Jun 2026
Sanctioned habitable floors
10

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK47.3 m² (509 sq.ft)12not published
1BHK68.6 m² (739 sq.ft)2not published
2BHK74.6 m² (803 sq.ft)4not published
2BHK74.9 m² (806 sq.ft)6not published
2BHK76.6 m² (824 sq.ft)7not published
2BHK77.6 m² (835 sq.ft)4not published
2BHK77.6 m² (836 sq.ft)2not published
2BHK93.6 m² (1,007 sq.ft)1not published
2BHK94.6 m² (1,019 sq.ft)1not published
3BHK93.4 m² (1,006 sq.ft)1not published
3BHK94.6 m² (1,019 sq.ft)3not published
3BHK94.9 m² (1,021 sq.ft)2not published
3BHK94.9 m² (1,021 sq.ft)1not published
3BHK123.3 m² (1,327 sq.ft)1not published
3BHK125.5 m² (1,351 sq.ft)1not published
3BHK128.6 m² (1,384 sq.ft)1not published
SHOP18.1 m² (195 sq.ft)1not published
SHOP18.4 m² (198 sq.ft)2not published
SHOP18.7 m² (201 sq.ft)9not published
SHOP18.7 m² (201 sq.ft)2not published
SHOP33.7 m² (363 sq.ft)1not published
SHOP33.7 m² (363 sq.ft)1not published
SHOP39.7 m² (427 sq.ft)1not published
Total66

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space00036

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology