BLD_006459Completed10 floors

Building No 1 - Wing A Type A · Shree N T Mundada Park - Blg No 1

Amalner (M Cl) · RERA P49900006767

10Sanctioned habitable floorsregistration certificate
31 Dec 2019Promised completion

Floors

10 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900006767 · registered 16 Aug 2017
Promised completion
31 Dec 2019
Sanctioned habitable floors
10

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK47.3 m² (509 sq.ft)12not published
1BHK68.6 m² (739 sq.ft)2not published
2BHK74.6 m² (803 sq.ft)5not published
2BHK74.9 m² (806 sq.ft)6not published
2BHK76.6 m² (824 sq.ft)8not published
2BHK77.6 m² (835 sq.ft)4not published
2BHK77.6 m² (836 sq.ft)2not published
2BHK84.5 m² (909 sq.ft)1not published
2BHK93.4 m² (1,006 sq.ft)1not published
3BHK94.6 m² (1,019 sq.ft)4not published
3BHK94.9 m² (1,021 sq.ft)2not published
3BHK94.9 m² (1,021 sq.ft)1not published
3BHK128.6 m² (1,384 sq.ft)1not published
SHOP17.1 m² (184 sq.ft)2not published
SHOP18.4 m² (198 sq.ft)2not published
SHOP18.7 m² (201 sq.ft)8not published
SHOP18.7 m² (201 sq.ft)2not published
Total63

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space00036

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)1%
  • Podiums (if any)1%
  • Plinth1%
  • Stilt Floor100%
  • Slabs of Super Structure3%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology