Skip to content

Parivartan Plaza

Completed

Khutala, Chandrapur 442406 |Promoter: Ankit Builders And Developer

17 Aug 2017Registered with MahaRERA
30 Nov 2018Promised completion
1Building
27Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential commerci27 units in all
Land area for this project
850 sq m (9,145 sq ft)
Permissible built-up area
1,019 sq m (10,973 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Address
17PIN 442406
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.01194, 79.22573
Parivartan Plaza is at latitude 20.01194, longitude 79.22573.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Nov 2018

The latest completion date on record passed 7 years and 11 months ago.

Registered
17 Aug 2017
Promised
30 Nov 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000704017 Aug 201730 Nov 2018—Ankit Builders And DeveloperProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Parivartan Plaza427

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

27 units registered

Residential commerci · 27 units
TypeCarpet areaUnits
Residential commerci923 sq m · 9,935 sq ft27

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Parivartan Plaza

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 16 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • staircase passage terracestaircase passage terrace:100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Registration certificate

Form 4

Show all 31 documentsShow fewer documents

Other (3)

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM B6affidavite cum declaration.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title report2title report moon.pdf · uploaded 31 Jul 2017View
  • Details of encumbrances3mtg letter moon.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)4layout plan moon.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letter5allotment letter.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)11sanction plan moon.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentsanction letter moon.pdf · uploaded 31 Jul 2017View
  • Other12saat baara moon.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)7ARCHITECT CERTIFICATE MOOON.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)10 ENGG CERTIFICATE MOON.pdf · uploaded 31 Jul 2017View
  • Architect’s Certificate on Completion of Project (Form 4)FORM2.pdf · uploaded 7 Feb 2020View

Promoter documents

  • Declaration Form B6affidavite cum declaration.pdf · uploaded 31 Jul 2017View
  • Legal Title report2title report moon.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout Approval4layout plan moon.pdfView
  • Building Plan Approval11sanction plan moon.pdfView

Other legal documents

  • Other12saat baara moon.pdfView

Proforma allotment letter

  • Proforma allotment letter5allotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khutala, Chandrapur taluka

Survey, CTS, gat or plot numbers

17

As published on MahaRERA's project page

17

Boundaries

North
9 M Road
South
Survey No 27
East
6 M Road
West
Plot No 78

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParinita Meshram—
OtherKalim Abdul Kadar Sheikh—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology