New Bramhapuri City-1

Lapsed

Kharbi Makta, Chandrapur 441206 |Promoter: Meena Diwakar Makode

19 Aug 2022Registered with MahaRERA
31 Jul 2024Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Lapsed
Land area for this project
7,579 sq m (81,582 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,114 sq m (11,996 sq ft)
Address
70/1, Brahmapuri - Nagbhid Road, Near Toll PlazaPIN 441206
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
New Bramhapuri City-1 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jul 2024

The latest completion date on record passed 2 years and 3 months ago.

Registered
19 Aug 2022
Promised
31 Jul 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090004658519 Aug 202231 Jul 2024—Meena Diwakar MakodeProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsWBM ROAD0%
  • Water SupplyBORE WELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsCement Concrete Drain0%
  • Landscaping & Tree PlantingTree Plantation0%
  • Street LightingAs per sanction0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per sanction0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs per sanction0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 22 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • a Details of encumbrances concerned to Finance5 A-FINANCIAL ENCUMBRANCE CERTI.pdf · uploaded 3 Aug 2022View
  • b Details of encumbrances concerned to Legal5 B-LEGAL ENCUMBRANCE CERTI.pdf · uploaded 3 Aug 2022View
  • Copy of Layout Approval (in case of layout)10_Map.pdf · uploaded 3 Aug 2022View
  • Building Plan Approval / NA Order for plotted development7_NA Order 70-1.pdf · uploaded 3 Aug 2022View
  • Commencement Certificates / NA Order for plotted development7_NA Order 70-1.pdf · uploaded 3 Aug 2022View
  • Declaration in FORM B6 FORM B AFFIDAVIT CUM DECLARATION CUM NOTERY.pdf · uploaded 3 Aug 2022View
  • Proforma of Allotment letter8 ALLOTMENT LETTER (2).pdf · uploaded 3 Aug 2022View
  • Deviation Report with respect to Allotment letter15 DEVIATION REPORT FOR ALLOTMENT LETTER.pdf · uploaded 4 Aug 2022View
  • Deviation Report with respect to model copy of Agreement13 DEVIATION FOR MODAL FORM OF AGREEMENT.pdf · uploaded 4 Aug 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1.pdf · uploaded 4 Aug 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form 2.pdf · uploaded 4 Aug 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same14 FORMAT A BANK AC.pdf · uploaded 5 Aug 2022View
  • Declaration about Commencement Certificate12 FORMAT D DECLARATION ABOUT COMMNCEMENT.pdf · uploaded 5 Aug 2022View
  • Disclosure of sold/ booked inventory11Annexure 29 Mina Divakar makode.pdf · uploaded 5 Aug 2022View
  • CERSAI detailsCERSAI_Search_Report_200244068859_For_Asset_Based_Search_05_08_2022_15_31_38_251.pdf · uploaded 5 Aug 2022View
  • Proforma of Allotment letter9 Agreement to sale Meena Makode.pdf · uploaded 6 Aug 2022View
  • Copy of the legal title report4 Search meena.pdf · uploaded 6 Aug 2022View

Promoter documents

  • Declaration Form B6 FORM B AFFIDAVIT CUM DECLARATION CUM NOTERY.pdf · uploaded 3 Aug 2022View
  • Legal Title report4 Search meena.pdf · uploaded 6 Aug 2022View

Technical documents

  • NA Order for Plotted Development7_NA Order 70-1.pdfView
  • Layout Approval10_Map.pdfView

Proforma allotment letter

  • Proforma allotment letter9 Agreement to sale Meena Makode.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kharbi Makta, Brahmapuri taluka

Survey, CTS, gat or plot numbers

70/1

As published on MahaRERA's project page

70/1

Boundaries

North
Road
South
Survey No 92
East
Survey No 94 and 100
West
Survey No 67 and 69

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRoshan Naktode—
Chartered accountantCA Abhinav Welekar—
EngineerRoshan Naktode—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology