Vasant Villa

Completed

Chandrapur (M Cl), Chandrapur 442401 |Promoter: Smita Gajanan Nilawar

Residential / Group HousingRERAP50900008319
18 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
1Building
9Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential9 units in all
Land area for this project
400 sq m (4,306 sq ft)
Permissible built-up area
572 sq m (6,157 sq ft)
Sanctioned built-up area
572 sq m (6,157 sq ft)
Address
Survey No. 107/56 B, Plot No. 11PIN 442401
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.96749, 79.29383
Vasant Villa is at latitude 19.96749, longitude 79.29383.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
18 Aug 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000831918 Aug 201731 Dec 2018—Smita Gajanan NilawarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vasant Villa59

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

9 units registered

Residential · 9 units
TypeCarpet areaUnits
Residential425.34 sq m · 4,578 sq ft9

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vasant Villa

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFROM BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WILL BE DONE AT THE TIME OF COMLETION100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION ONLY100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING WILL BE DONE AT THE TIME OF100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAT THE TIME OF COMPLETION100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 19 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)Order.pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)2044.pdf · uploaded 27 Jul 2017View
  • Copy of the legal title reportSearch Report.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAgreement to sale.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterFLAT Allotment,.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesEncumbrances.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BDeclaration.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Certificate.pdf · uploaded 29 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentSanction 1 (2 files merged).pdf · uploaded 23 Apr 2018View
  • Engineers Certificate on Quality Assurance (Form 2A)Form 2 A, Vasant Villa.pdf · uploaded 4 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Vasant Villa.pdf · uploaded 4 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Letter.pdf · uploaded 4 Sep 2019View
  • Annual Audit Report of Statutory CA (Form 5)Vasant Villa.pdf · uploaded 19 Oct 2019View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 28 Jul 2017View
  • Declaration Form BDeclaration.pdf · uploaded 29 Jul 2017View

Technical documents

  • Layout ApprovalOrder.pdfView
  • Building Plan Approval2044.pdfView

Proforma allotment letter

  • Proforma allotment letterFLAT Allotment,.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chandrapur (M Cl), Chandrapur taluka

Survey, CTS, gat or plot numbers

11PLOT NO. 11SURVEY NO. 107/56 B

As published on MahaRERA's project page

SURVEY NO. 107/56 B, PLOT NO. 11

Boundaries

North
Plot No 12
South
Plot No 10
East
Plot No 20
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVikrant Bhute—
EngineerVirendra Dehadrai—
OtherTulshiram Nishad—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology