Siddhesh Residency

Lapsed

Chandrapur (M Cl), Chandrapur 442401 |Promoter: Pritima Deepak Nilawar

12 Oct 2019Registered with MahaRERA
30 Dec 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
325 sq m (3,496 sq ft)
Permissible built-up area
422 sq m (4,539 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Address
SURVEY NO 12 AUB 1 PLOT NO 25, Patelnagar Behind Busstop, CHANDRAPURPIN 442401
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Siddhesh Residency is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
12 Oct 2019
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090002271012 Oct 201930 Dec 2021—Pritima Deepak NilawarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Siddhesh Residency4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00004

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Siddhesh Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK COMPLETED100%
  • Energy managemcntWORK COMPLETED100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWORK COMPLETED0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 14 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 7 Oct 2019View
  • Details of encumbrancesEncumbrances Letter.pdf · uploaded 7 Oct 2019View
  • Copy of Layout Approval (in case of layout)N A Order.pdf · uploaded 7 Oct 2019View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan.pdf · uploaded 7 Oct 2019View
  • Commencement Certificates / NA Order for plotted developmentSanction Letter.pdf · uploaded 7 Oct 2019View
  • Declaration in FORM BForm B.pdf · uploaded 7 Oct 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 7 Oct 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 7 Oct 2019View
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 7 Oct 2019View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 7 Oct 2019View
  • Declaration Form BForm B.pdf · uploaded 7 Oct 2019View

Technical documents

  • Layout ApprovalN A Order.pdfView
  • Building Plan ApprovalSanction Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chandrapur (M Cl), Chandrapur taluka

Survey, CTS, gat or plot numbers

25SURVEY NO 12 AUB 1 PLOT NO 25

As published on MahaRERA's project page

SURVEY NO 12 AUB 1 PLOT NO 25

Boundaries

North
Layout Plot No 24 And 26
South
15 Mtr Road
East
6 Mtr Layout Road
West
Layout Plot No 23

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParinita Meshram—
Chartered accountantS G Kamde—
EngineerParinita Meshram—
OtherMansaram Shende—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology