14 Aug 2017Registered with MahaRERA
30 Dec 2018Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residencei10 units in all
Land area for this project
453 sq m (4,880 sq ft)
Permissible built-up area
544 sq m (5,851 sq ft)
Sanctioned built-up area
544 sq m (5,851 sq ft)
Address
Ploy No 7 Survey No 97PIN 442401
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.62391, 73.81250
Saivilla Appartment is at latitude 18.62391, longitude 73.81250.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
14 Aug 2017
Promised
30 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000577514 Aug 201730 Dec 2018—Niraj Pralhadrao PadgilwarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Saivilla Appartment410

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

Residencei · 10 units
TypeCarpet areaUnits
Residencei499.51 sq m · 5,377 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Saivilla Appartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBY BORWELL50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAFTER COMPLITAION OF BUILDING WORK0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY METER PANAL0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Allotment letters

Registration certificate

Commencement certificate

Form 5

Form 4

Others

Layout plan

Building plan

Document library

  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT MAP.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterAGRIMENT TO SALE FORMAT2.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCITAKE CERTIFICAT FORM 1.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGEENIAR CERTIFICATE FORM 2.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)MAP1.pdf · uploaded 30 Jul 2017View
  • Other7 12.pdf · uploaded 30 Jul 2017View
  • OtherSAIVILLA OC.pdf · uploaded 23 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentSANCTION LETTER.pdf · uploaded 10 Apr 2018View
  • Certificates of CA (Form 5)form no 5 sai villa.pdf · uploaded 27 Jul 2019View
  • Certificates of Architect (Form 4)FORM 4 SAIVILLA.pdf · uploaded 27 Jul 2019View

Promoter documents

  • Legal Title reportTITLE REPORT.pdf · uploaded 30 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 30 Jul 2017View

Technical documents

  • Layout ApprovalLAYOUT MAP.pdfView
  • Building Plan ApprovalMAP1.pdfView

Other legal documents

  • OtherSAIVILLA OC.pdfView
  • Other7 12.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chandrapur (M Cl), Chandrapur taluka

Survey, CTS, gat or plot numbers

97PLOY NO 7 SURVEY NO 97

As published on MahaRERA's project page

PLOY NO 7 SURVEY NO 97

Boundaries

North
Hanuman Mandir
South
Layout Road
East
Survey No 98
West
Layout Plot No 6

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDharmendra Kumar Pandit—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology