Skip to content

Mrunalini

Lapsed

Chandrapur (M Cl), Chandrapur 442401 |Promoter: Deshak

Residential / Group HousingRERAP50900006276
14 Aug 2017Registered with MahaRERA
16 Feb 2019Promised completion
30 Oct 2020Revised completionPushed back 1 year and 8 months
1Building
1Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Residential1 unit in all
Land area for this project
681 sq m (7,331 sq ft)
Permissible built-up area
681 sq m (7,331 sq ft)
Sanctioned built-up area
681 sq m (7,331 sq ft)
Recreational open space
681 sq m (7,331 sq ft)
Address
2817PIN 442401
Designated bank account
Punjab National Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.96749, 79.29383
Mrunalini is at latitude 19.96749, longitude 79.29383.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year and 8 months

The latest completion date on record passed 6 years ago.

Registered
14 Aug 2017
Promised
16 Feb 2019
Revised
30 Oct 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000627614 Aug 201716 Feb 201930 Oct 2020DeshakProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Mrunalini81

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1 unit registered

Residential · 1 unit
TypeCarpet areaUnits
Residential1,117.89 sq m · 12,033 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Mrunalini

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supplywell20%
  • Sewerage (Chamber, Lines, Septic Tank , STP)concret10%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationApply20%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingDone60%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 1

Form 2

Registration certificate

Extension certificate

Other (3)

Show all 29 documentsShow fewer documents

Other (3)

Layout plan

Building plan (2)

Allotment letter

Document library

  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Certificate of Engineer.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect copy.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportAakhiv Patrika.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanction Map.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesSearch Report.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)scan531 (3).pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)scan532 (4).pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BNotary.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAgr to sell.pdf · uploaded 31 Jul 2017View

Promoter documents

  • Legal Title reportAakhiv Patrika.pdf · uploaded 31 Jul 2017View
  • Declaration Form BNotary.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan Approvalscan531 (3).pdfView
  • Building Plan Approvalscan532 (4).pdfView
  • Layout ApprovalSanction Map.pdfView

Proforma allotment letter

  • Proforma allotment letterAgr to sell.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chandrapur (M Cl), Chandrapur taluka

Survey, CTS, gat or plot numbers

2817

As published on MahaRERA's project page

2817

Boundaries

North
Residential
South
Road
East
Government Hospital
West
Residential

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManish Sudhakar Kamble—
EngineerAnand Kukde—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology