Aditya Enclave

Lapsed

Chandrapur (M Cl), Chandrapur 442401 |Promoter: Aditya Infraventures

Residential / Group HousingRERAP50900006450
14 Aug 2017Registered with MahaRERA
15 Jan 2021Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Residential10 units in all
Land area for this project
429 sq m (4,619 sq ft)
Permissible built-up area
430 sq m (4,632 sq ft)
Sanctioned built-up area
429 sq m (4,619 sq ft)
Address
Plot No 11/Survey No 102PIN 442401
Designated bank account
Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.96749, 79.29383
Aditya Enclave is at latitude 19.96749, longitude 79.29383.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Jan 2021

The latest completion date on record passed 5 years and 9 months ago.

Registered
14 Aug 2017
Promised
15 Jan 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090000645014 Aug 201715 Jan 2021—Aditya InfraventuresProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aditya Enclave610

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

Residential · 10 units
TypeCarpet areaUnits
Residential679.47 sq m · 7,314 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aditya Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFROM BOREWELL25%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AT THE TIME OF COMPLETION0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION ONLY0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAT THE TIME OF COMPLETION0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAT THE TIME OF COMPLETION0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 15 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesEncumbraces.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout map.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Building Map.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted development3.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title report7:12.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAgreement to sale.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAllotment letter1.pdf · uploaded 31 Jul 2017View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 31 Jul 2017View
  • Legal Title report7:12.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalLayout map.pdfView
  • Building Plan ApprovalBuilding Map.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chandrapur (M Cl), Chandrapur taluka

Survey, CTS, gat or plot numbers

102Plot No 11/Survey No 102

As published on MahaRERA's project page

Plot No 11/Survey No 102

Boundaries

North
Plot No 13
South
Survey No 101
East
Survey No 107
West
9 MTR wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVikrant Bhute—
EngineerAshish Soni—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology