Skip to content
Deedo home
Menu

Rama Apartment

Active

Sundar Khed (Ct), Buldana 443001 |Promoter: M/S Digvijay Construction

7 Aug 2020Registered with MahaRERA
30 Jun 2026Promised completion
1Building
21Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
1
Unit types
2BHK, Shop21 units in all
Land area for this project
492 sq m (5,296 sq ft)
Permissible built-up area
889 sq m (9,567 sq ft)
Sanctioned built-up area
689 sq m (7,414 sq ft)
Address
Survey No 24, Gut No 73 And 75 Part, Plot No 01, Chikhli Road, SunderkhedPIN 443001
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Rama Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2026

The latest completion date on record passed 4 months ago.

Registered
7 Aug 2020
Promised
30 Jun 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P500000260037 Aug 202030 Jun 2026—M/S Digvijay ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rama Apartment421

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

21 units registered

2BHK · 12 unitsShop · 9 units
TypeCarpet areaUnits
2BHK43.1 sq m · 464 sq ft9
2BHK46.5 sq m · 501 sq ft3
Shop8.24 sq m · 89 sq ft1
Shop9.74 sq m · 105 sq ft2
Shop10.05 sq m · 108 sq ft1
Shop10.36 sq m · 112 sq ft1
Shop12.36 sq m · 133 sq ft1
Shop13.2 sq m · 142 sq ft2
Shop16.16 sq m · 174 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000021

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rama Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOAR WELL AND MUNICIPAL COUNCIL WATER SUPPLY0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)LINES SEPTIC TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingPROVIDED0%
  • Street LightingPROVIDED0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPROVIDED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationPROVIDED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER RULE0%
  • LIFTPROVIDED0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 16 filings listed on MahaRERA's project page

Commencement certificate

Encumbrance

Form b

Form 1s

Registration certificate

Others

Title

Building plan

Allotment letter

Document library

  • Copy of the legal title reportDIGVIJAY CONST TITLE SEARCH 4.pdf · uploaded 22 Jul 2020View
  • Copy of Layout Approval (in case of layout)DIGVIJAY CONST TITLE SEARCH 4.pdf · uploaded 22 Jul 2020View
  • Building Plan Approval / NA Order for plotted developmentDIGVIJAY CONST- BUILDING PERMISSION plan.pdf · uploaded 22 Jul 2020View
  • Commencement Certificates / NA Order for plotted developmentDIGVIJAY CONST- BUILDING PERMISSION.pdf · uploaded 22 Jul 2020View
  • Proforma of Allotment letterAgreement to Sale of rama appartment.pdf · uploaded 22 Jul 2020View
  • Details of encumbrancesDIGVIJAY CONST- DETAILS OF ENCUMBRANCES.pdf · uploaded 23 Jul 2020View
  • Declaration in FORM BDIGVIJAY CONST- FORM B- PROMOTORS.pdf · uploaded 23 Jul 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DIGVIJAY CONST- ARCHI CERTIFICATE.pdf · uploaded 23 Jul 2020View
  • OtherCREDAI REGISTRATION DIGVIJAY CONSTRUCTION.pdf · uploaded 6 Aug 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERTIFICATE 2 RAMA APPARTMENT.pdf · uploaded 27 Aug 2021View

Promoter documents

  • Legal Title reportDIGVIJAY CONST TITLE SEARCH 4.pdf · uploaded 22 Jul 2020View
  • Declaration Form BDIGVIJAY CONST- FORM B- PROMOTORS.pdf · uploaded 23 Jul 2020View

Technical documents

  • Layout ApprovalDIGVIJAY CONST TITLE SEARCH 4.pdfView
  • Building Plan ApprovalDIGVIJAY CONST- BUILDING PERMISSION plan.pdfView

Other legal documents

  • OtherCREDAI REGISTRATION DIGVIJAY CONSTRUCTION.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement to Sale of rama appartment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sundar khed (CT), Buldana taluka

Survey, CTS, gat or plot numbers

0175 PARTGUT NO 73PLOT NO 01SURVEY NO 24

As published on MahaRERA's project page

SURVEY NO 24, GUT NO 73 AND 75 PART,PLOT NO 01

Boundaries

North
Plot No 13 And 14
South
Government Road
East
Government Road
West
Plot No 02

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmrish Joshi—
Chartered accountantShreyas Prakash Chordiya—
EngineerRaka Sunil Mulchand—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology