Skip to content
Deedo home
Menu

Raghav Sankul

Completed

Khamgaon (M Cl), Buldana 444303 |Promoter: Nandkishor Shivnarayan Dube

16 Aug 2017Registered with MahaRERA
1 Oct 2019Promised completion
1Building
38Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
1
Unit types
Commercial, Residential38 units in all
Land area for this project
1,045 sq m (11,248 sq ft)
Permissible built-up area
1 sq m (14 sq ft)
Sanctioned built-up area
1 sq m (14 sq ft)
Address
1, Khamgaon, KhamgaonPIN 444303
Designated bank account
Central Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.71398, 76.56108
Raghav Sankul is at latitude 20.71398, longitude 76.56108.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Oct 2019

The latest completion date on record passed 7 years ago.

Registered
16 Aug 2017
Promised
1 Oct 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5000000663416 Aug 20171 Oct 2019—Nandkishor Shivnarayan DubeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Raghav Sankul538

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

38 units registered

Commercial · 20 unitsResidential · 18 units
TypeCarpet areaUnits
Commercial400 sq m · 4,306 sq ft20
Residential695.05 sq m · 7,481 sq ft18

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Raghav Sankul

  • Excavation100%
  • Basement (if any)1%
  • Podiums (if any)0%
  • Plinth1%
  • Stilt Floor0%
  • Slabs of Super Structure30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOAR AND WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation10%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Waterreatment And Disposal Of Sewage And Sullage WateR50%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting30%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking1001%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 36 filings listed on MahaRERA's project page

Allotment letters

Title

Form b

Registration certificate

Encumbrance

Commencement certificate

Form 1s

Form 2s

Form 4

Other

Layout plan

Building plan

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesIn Progress.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)NA.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BForm B.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterNot Sale.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)In Progress.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)In Progress.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Map IOD.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesjpg2pdf.pdf · uploaded 10 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)311.pdf · uploaded 10 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)312.pdf · uploaded 10 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)313.pdf · uploaded 10 Apr 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)411.pdf · uploaded 10 Apr 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)412.pdf · uploaded 10 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)314.pdf · uploaded 10 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)315.pdf · uploaded 10 Apr 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)413.pdf · uploaded 10 Apr 2018Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)414.pdf · uploaded 10 Apr 2018Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)415.pdf · uploaded 10 Apr 2018Source
  • Certificates of CA (Form 5)411.pdf · uploaded 10 Apr 2018View
  • Certificates of CA (Form 5)412.pdf · uploaded 10 Apr 2018View
  • Certificates of CA (Form 5)413.pdf · uploaded 10 Apr 2018Source
  • Certificates of CA (Form 5)414.pdf · uploaded 10 Apr 2018Source
  • Certificates of CA (Form 5)415.pdf · uploaded 10 Apr 2018Source
  • Proforma of Allotment letter121.pdf · uploaded 10 Apr 2018View
  • Proforma of Allotment letter122.pdf · uploaded 10 Apr 2018View
  • Proforma of Allotment letter123.pdf · uploaded 10 Apr 2018View
  • Proforma of Allotment letter124.pdf · uploaded 10 Apr 2018View
  • Proforma of Allotment letter125.pdf · uploaded 10 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentPermission.pdf · uploaded 10 Apr 2018View
  • Architect’s Certificate on Completion of Project (Form 4)NAND_KISHOR__DUBE.pdf · uploaded 27 Dec 2019View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 31 Jul 2017View
  • Declaration Form BForm B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalMap IOD.pdfView
  • Layout ApprovalNA.pdfView

Proforma allotment letter

  • Proforma allotment letterNot Sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khamgaon (M Cl), Khamgaon taluka

Survey, CTS, gat or plot numbers

1

As published on MahaRERA's project page

1

Boundaries

North
Field Of Jaiswal
South
Govt Road
East
Houses From Old Layout
West
12 Mtr Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSachin K Kothari—
ArchitectSachin K Kothari—
ArchitectSachin K Kothari—
ArchitectSachin K Kothari—
EngineerShekhar S Kulkarni—
EngineerShekhar S Kulkarni—
EngineerShekhar S Kulkarni—
EngineerShekhar S Kulkarni—
OtherShashank P Deshpande—
OtherShashank P Deshpande—
OtherShashank P Deshpande—
OtherShashank P Deshpande—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology