Skip to content
Deedo home
Menu

Yaduveer Residency

Lapsed

Buldana (Mcl), Buldana 443001 |Promoter: Aadhar Builders & Land Developers

Residential / Group HousingRERAP50000014666
20 Dec 2017Registered with MahaRERA
30 Oct 2021Promised completion
1Building
13Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Residential13 units in all
Land area for this project
217 sq m (2,338 sq ft)
Permissible built-up area
261 sq m (2,806 sq ft)
Sanctioned built-up area
217 sq m (2,338 sq ft)
Address
Old Survey No 33/2 33/3 New Survey No 230 Plot No 36, Krida Sankul Road, BuldanaPIN 443001
Designated bank account
Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.20724, 72.83482
Yaduveer Residency is at latitude 19.20724, longitude 72.83482.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Oct 2021

The latest completion date on record passed 5 years ago.

Registered
20 Dec 2017
Promised
30 Oct 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5000001466620 Dec 201730 Oct 2021—Aadhar Builders & Land DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Yaduveer Residency613

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 units registered

Residential · 13 units
TypeCarpet areaUnits
Residential180.8 sq m · 1,946 sq ft13

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Yaduveer Residency

  • Excavation80%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor38%
  • Slabs of Super Structure20%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWORK YET TO BE STARTED.0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK YET TO BE STARTED.0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWORK YET TO BE STARTED.0%
  • Electrical meter room, sub-station, receiving stationWORK YET TO BE STARTED.0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 13 filings listed on MahaRERA's project page

Title

Encumbrances

Form b

Commencement certificate

Registration certificate

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)04.pdf · uploaded 3 Dec 2017View
  • Building Plan Approval (IOD)Aproval Plan.pdf · uploaded 3 Dec 2017View
  • Copy of the legal title reportLetal Title Report00.pdf · uploaded 3 Dec 2017View
  • Details of encumbrancesEC.pdf · uploaded 3 Dec 2017View
  • Details of encumbrancesEC Builder.pdf · uploaded 7 Dec 2017View
  • Declaration in FORM BForm B.pdf · uploaded 7 Dec 2017View
  • Proforma of Allotment letterAgreement to Sale Final.pdf · uploaded 12 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentConstruction Permission.pdf · uploaded 5 Jun 2018View

Promoter documents

  • Legal Title reportLetal Title Report00.pdf · uploaded 3 Dec 2017View
  • Declaration Form BForm B.pdf · uploaded 7 Dec 2017View

Technical documents

  • Layout Approval04.pdfView
  • Building Plan ApprovalAproval Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement to Sale Final.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In buldana (MCL), Buldana taluka

Survey, CTS, gat or plot numbers

23036OLD SURVEY NO 33/2 33/3 NEW SURVEY NO 230 PLOT NO 36

As published on MahaRERA's project page

OLD SURVEY NO 33/2 33/3 NEW SURVEY NO 230 PLOT NO 36

Boundaries

North
9 M Road
South
Sanctioned Layout
East
6 M Road
West
Plot No 37

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAniket Ashruba Shewale—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology