Skip to content

Radha Krushna Villa

Certificate Signed

Sundarwadi, Aurangabad 431001 |Promoter: Sainaath Builders And Developers

14 Jun 2019Registered with MahaRERAFirst of 2 registrations
31 Dec 2027Promised completionLatest across registrations
30 Apr 2028Revised completion1 of 2 registrations pushed back, by up to 4 months
6Buildings2 phases
96Units registered18 booked (19%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
RERA registrations
2
Phases
2
Buildings
6
Unit types
2 BHK FLAT, 2BHK, 2 BHK Row House96 units in all
Address
GUT NO 21, Opposite to Cambridge School Road, SundarwadiPIN 431001
Designated bank account
229
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.66940, 76.04270
Radha Krushna Villa is at latitude 20.66940, longitude 76.04270.

Also registered as

Radha Krushna Villa Phase 1Radha Krushna Villa Phase 2

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

P51500021253
Registered
14 Jun 2019
Promised
31 Dec 2027
Revised
30 Apr 2028

Completion promised for 31 Dec 2026

P51500033700
Registered
2 Mar 2022
Promised
31 Dec 2026

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002125314 Jun 201931 Dec 202730 Apr 2028Sainaath Builders And DevelopersProject page
P515000337002 Mar 202231 Dec 2026—Sainaath Builders And DevelopersProject page

6 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

18 of 96 units booked (19%), as the promoter reported to MahaRERA

2 BHK FLAT · 48 units2BHK · 40 units2 BHK Row House · 8 units
RERABuildingTypeCarpet areaUnitsBooked
P51500021253Ashtvinayak Garden2 BHK FLAT41.79 sq m · 450 sq ft160
P51500021253Ashtvinayak Garden2 BHK FLAT44.84 sq m · 483 sq ft166
P51500021253Gurumauli Garden2 BHK FLAT49.7 sq m · 535 sq ft166
P51500033700Ram Krushna Garden2BHK49.7 sq m · 535 sq ft16—
P51500021253Row Houses Type C1 Part2 BHK Row House62.56 sq m · 673 sq ft86
P51500033700Row Houses Type C 1 - Part2BHK62.56 sq m · 673 sq ft8—
P51500033700Row Houses Type C22BHK62.56 sq m · 673 sq ft16—

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Ram Krushna GardenClosed/Covered00008
Ram Krushna GardenOpen Space00000
Row Houses Type C 1 - PartClosed/Covered00000
Row Houses Type C 1 - PartOpen Space00008
Row Houses Type C2Closed/Covered00000
Row Houses Type C2Open Space000016

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ram Krushna Garden

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row Houses Type C 1 - Part

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Row Houses Type C2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Common areas and amenities

  • Internal Roads & FootpathsInternal Road of Trimix and Footpath of paver bloc80%
  • Water SupplyWell80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Chamber90%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Planting80%
  • Street LightingLED90%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting60%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS REQUIRED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingOpen Parking100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

31 documents held by Deedo, 106 filings listed on MahaRERA's project page

Title report

Encumbrance details

  • Encumbrance detailsP51500033700 · 3 Feb 2022ViewSource

Commencement certificate (2)

  • Commencement certificateP51500033700 · 3 Feb 2022ViewSource
  • Commencement certificateP51500033700 · 3 Feb 2022ViewSource

Form B

Form 1 (2)

Form 2 (2)

Show all 137 documentsShow fewer documents

Form 2 (2)

Other (10)

Allotment letter (2)

  • Allotment letterP51500033700 · 3 Feb 2022ViewSource
  • Allotment letterP51500033700 · Date not statedViewSource

Registration certificate (2)

  • Registration certificateP51500033700 · 2 Mar 2022ViewSource
  • Registration certificateP51500021253 · 12 Aug 2026ViewSource

Form 2A

Form 5 (3)

Layout plan

Building plan (3)

  • Building planP51500033700 · Date not statedViewSource
  • Building planP51500033700 · Date not statedViewSource
  • Building planP51500033700 · Date not statedViewSource

Document library

  • Copy of the legal title reportP51500033700 · 5 Legal Title Report.pdf · uploaded 3 Feb 2022View
  • Details of encumbrancesP51500033700 · 6 Details of Encumbrances.pdf · uploaded 3 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentP51500033700 · 8a Sanctioned Drawing page 1.pdf · uploaded 3 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentP51500033700 · 8b Sanctioned Drawing page 2.pdf · uploaded 3 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentP51500033700 · 8c Sanctioned Drawing page 3.pdf · uploaded 3 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentP51500033700 · 8d Sanctioned Drawing page 4.pdf · uploaded 3 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentP51500033700 · 9 Commencement Certificate and Layout approval.pdf · uploaded 3 Feb 2022View
  • Declaration about Commencement CertificateP51500033700 · 10 Declaration about Commencement Certificate.pdf · uploaded 3 Feb 2022View
  • Declaration in FORM BP51500033700 · 11 Form B of Sainaath Builders (Developer).pdf · uploaded 3 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51500033700 · 12 Form 1 Architect's Certificate_compressed.pdf · uploaded 3 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51500033700 · 13 Form 2 Engineer's Certificate_compressed.pdf · uploaded 3 Feb 2022View
  • CERSAI detailsP51500033700 · 15 CERSAI_Search_Report_200229483987_For_Asset_Based_Search_03_02_2022_20_56_24_001.pdf · uploaded 3 Feb 2022View
  • Proforma of Allotment letterP51500033700 · 16a Allotment Letter.pdf · uploaded 3 Feb 2022View
  • Proforma of Allotment letterP51500033700 · 16b agreement to sale of Phase 2.pdf · uploaded 3 Feb 2022View
  • OtherP51500033700 · 17 Letter of Authority.pdf · uploaded 3 Feb 2022View
  • Copy of Layout Approval (in case of layout)P51500033700 · 7 Sanctioned Drawing page 1.pdf · uploaded 4 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51500033700 · Architect's Certificate Phase 2.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51500033700 · Engineer's Certificate From -2 Phase 2.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51500033700 · FORM-2A-PHASE-2.pdf · uploaded 22 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51500033700 · FORM 5- Phase 2- 2-2-22 TO 31-3-22.pdf · uploaded 23 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51500033700 · FORM 5- Phase 2- 1-4-22 TO 31-3-23.pdf · uploaded 23 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51500033700 · FORM 5- Phase 2- 1-4-23 TO 31-3-24.pdf · uploaded 23 Feb 2025View
  • Form 2A (FY 2021-2022)P51500033700 · uploaded 16 Jun 2025Source

Promoter documents

  • Legal Title reportP51500033700 · 5 Legal Title Report.pdf · uploaded 3 Feb 2022View
  • Declaration Form BP51500033700 · 11 Form B of Sainaath Builders (Developer).pdf · uploaded 3 Feb 2022View

Technical documents

  • Building Plan ApprovalP51500033700 · 8a Sanctioned Drawing page 1.pdfView
  • Building Plan ApprovalP51500033700 · 8b Sanctioned Drawing page 2.pdfView
  • Building Plan ApprovalP51500033700 · 8c Sanctioned Drawing page 3.pdfView
  • Building Plan ApprovalP51500033700 · 8d Sanctioned Drawing page 4.pdfView
  • Layout ApprovalP51500033700 · 7 Sanctioned Drawing page 1.pdfView

Other legal documents

  • OtherP51500033700 · 17 Letter of Authority.pdfView

Proforma allotment letter

  • Proforma allotment letterP51500033700 · 16b agreement to sale of Phase 2.pdfView

Finance

  • PAN CardP51500021253 · PAN Sainaath Builders and Developers.pdf · uploaded 30 May 2019Source

Legal

  • Legal Title reportP51500021253 · Legal Title Search Report page 1 to 6.pdf · uploaded 30 May 2019Source
  • Legal Title reportP51500021253 · Legal Title Search Report page 7.pdf · uploaded 30 May 2019Source
  • Declaration Form BP51500021253 · 5 Form B of Sainaath Builders and Developers.pdf · uploaded 8 Jun 2019Source
  • OtherP51500021253 · 17 Letter of Authority to Partner.pdf · uploaded 9 Jun 2019Source

Migrated

  • 1 PAN CardP51500021253 · PAN Sainaath Builders and Developers.pdf · uploaded 30 May 2019Source
  • 1 Copy of the legal title reportP51500021253 · Legal Title Search Report page 1 to 6.pdf · uploaded 30 May 2019Source
  • 2 Copy of the legal title reportP51500021253 · Legal Title Search Report page 7.pdf · uploaded 30 May 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51500021253 · Commencement Certificate Cidco Permission.pdf · uploaded 30 May 2019Source
  • 1 Details of encumbrancesP51500021253 · 4 Unencumbrance Certificate.pdf · uploaded 8 Jun 2019Source
  • 1 Declaration in FORM BP51500021253 · 5 Form B of Sainaath Builders and Developers.pdf · uploaded 8 Jun 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51500021253 · 1 Form 1 Architect Certificate.pdf · uploaded 8 Jun 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51500021253 · 2 Form 2 Engineers Certificate.pdf · uploaded 8 Jun 2019Source
  • 1 Copy of Layout Approval (in case of layout)P51500021253 · 8 Commencement Certificate and Layout approval.pdf · uploaded 9 Jun 2019Source
  • 1 Building Plan Approval (IOD)P51500021253 · 15a Sanctioned Drawing page 1.pdf · uploaded 9 Jun 2019Source
  • 2 Building Plan Approval (IOD)P51500021253 · 15b Sanctioned Drawing page 2.pdf · uploaded 9 Jun 2019Source
  • 3 Building Plan Approval (IOD)P51500021253 · 15c Sanctioned Drawing page 3.pdf · uploaded 9 Jun 2019Source
  • 4 Building Plan Approval (IOD)P51500021253 · 15d Sanctioned Drawing page 4.pdf · uploaded 9 Jun 2019Source
  • 1 Proforma of Allotment letterP51500021253 · 7 Allotment Letter proforma.pdf · uploaded 9 Jun 2019Source
  • 2 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 1 to 6.pdf · uploaded 9 Jun 2019Source
  • 3 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 7 to 10.pdf · uploaded 9 Jun 2019Source
  • 4 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 11 to 14.pdf · uploaded 9 Jun 2019Source
  • 5 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 15 to 18.pdf · uploaded 9 Jun 2019Source
  • 6 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 19 to 22.pdf · uploaded 9 Jun 2019Source
  • 7 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 23 to 26.pdf · uploaded 9 Jun 2019Source
  • 8 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 27 to 30.pdf · uploaded 9 Jun 2019Source
  • 9 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 31 to 34.pdf · uploaded 9 Jun 2019Source
  • 10 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 35 to 38.pdf · uploaded 9 Jun 2019Source
  • 11 Proforma of Allotment letterP51500021253 · 6 Agreement to Sale page 39 to 42.pdf · uploaded 9 Jun 2019Source
  • 1 OtherP51500021253 · 17 Letter of Authority to Partner.pdf · uploaded 9 Jun 2019Source
  • 1 Certificates of CA (Form 3)P51500021253 · 3 Form 3 CA Certificate.pdf · uploaded 10 Jun 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51500021253 · Form 1 ARCHITECT CERTIFICATE Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51500021253 · Form 2 ENGINNER CERTIFICATE Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • 1 Disclosure of sold/ booked inventoryP51500021253 · SOLD UNSOLD Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • 2 Certificates of CA (Form 3)P51500021253 · Form 3 CA Certificate Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51500021253 · Architect's Certificate Phase 1.pdf · uploaded 22 Feb 2025Source
  • 1 Certificates of CA (Form 3)P51500021253 · PHASE -1 C A CERTIFICATE FORM-3-.pdf · uploaded 22 Feb 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51500021253 · Engineer's Certificate Form 2 Phase -1.pdf · uploaded 22 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51500021253 · Form 2 A- PHASE-1.pdf · uploaded 22 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51500021253 · FORM 5- Phase 1- 1-4-21 TO 31-3-2022.pdf · uploaded 23 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51500021253 · FORM 5- Phase 1- 1-4-22 TO 31-3-2023.pdf · uploaded 23 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51500021253 · FORM 5- Phase 1- 1-4-23 TO 31-3-2024.pdf · uploaded 23 Feb 2025Source
  • Form 1P51500021253 · FORM 1 UPTO MARCH 2023.pdf · uploaded 16 Jun 2025Source
  • Form 2P51500021253 · form 2 apr to june 24.pdf · uploaded 16 Jun 2025Source
  • Form 3P51500021253 · FORM 3- apr to jun-24.pdf · uploaded 16 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP51500021253 · New Disclosure of sold_ booked inventory.pdf · uploaded 16 Jun 2025Source
  • Self-declaration of Quarterly ProgressP51500021253 · qtr progress report.pdf · uploaded 16 Jun 2025Source
  • Form 1P51500021253 · FORM 1 UPTO MARCH 2025.pdf · uploaded 16 Jun 2025Source
  • Form 2P51500021253 · form 2 jul to sep 24.pdf · uploaded 16 Jun 2025Source
  • Form 3P51500021253 · FORM 3- jul to sept 24.pdf · uploaded 16 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP51500021253 · New Disclosure of sold_ booked inventory.pdf · uploaded 16 Jun 2025Source
  • Self-declaration of Quarterly ProgressP51500021253 · qtr progress report.pdf · uploaded 16 Jun 2025Source
  • Form 1P51500021253 · FORM 1 UPTO MARCH 2025.pdf · uploaded 16 Jun 2025Source
  • Form 2P51500021253 · form 2 oct to dec 24.pdf · uploaded 16 Jun 2025Source
  • Form 3P51500021253 · 3 Certificates of CA (Form 3).pdf · uploaded 16 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP51500021253 · New Disclosure of sold_ booked inventory.pdf · uploaded 16 Jun 2025Source
  • Self-declaration of Quarterly ProgressP51500021253 · qtr progress report.pdf · uploaded 16 Jun 2025Source
  • Form 1P51500021253 · FORM 1 UPTO MARCH 2025.pdf · uploaded 16 Jun 2025Source
  • Form 2P51500021253 · form 2 jan 25 to march 25.pdf · uploaded 16 Jun 2025Source
  • Form 3P51500021253 · FORM 3- jan 25 to march 25.pdf · uploaded 16 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP51500021253 · New Disclosure of sold_ booked inventory.pdf · uploaded 16 Jun 2025Source
  • Self-declaration of Quarterly ProgressP51500021253 · qtr progress report.pdf · uploaded 16 Jun 2025Source
  • Form 2A (FY 2022-2023)P51500021253 · form 2-a-23.pdf · uploaded 16 Jun 2025Source
  • Form 2A (FY 2023-2024)P51500021253 · form 2-a-24.pdf · uploaded 16 Jun 2025Source
  • Form 2A (FY 2024-2025)P51500021253 · form 2-a-25.pdf · uploaded 16 Jun 2025Source

Technical

  • DocumentP51500021253 · 15a Sanctioned Drawing page 1.pdf · uploaded 9 Jun 2019Source
  • DocumentP51500021253 · 15b Sanctioned Drawing page 2.pdf · uploaded 9 Jun 2019Source
  • DocumentP51500021253 · 15c Sanctioned Drawing page 3.pdf · uploaded 9 Jun 2019Source
  • DocumentP51500021253 · 15d Sanctioned Drawing page 4.pdf · uploaded 9 Jun 2019Source
  • DocumentP51500021253 · 8 Commencement Certificate and Layout approval.pdf · uploaded 9 Jun 2019Source

Technical (Architect)

  • DocumentP51500021253 · Form 1 ARCHITECT CERTIFICATE Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • DocumentP51500021253 · Architect's Certificate Phase 1.pdf · uploaded 22 Feb 2025Source

Technical (Engineer)

  • DocumentP51500021253 · Form 2 ENGINNER CERTIFICATE Ph 1 Dec 2021.pdf · uploaded 4 Mar 2022Source
  • DocumentP51500021253 · Engineer's Certificate Form 2 Phase -1.pdf · uploaded 22 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sundarwadi, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 21

Boundaries

North
Part of Gut No 21
South
Part of Gut No 21
East
15 Meter DP Road
West
Part of Gut No 21

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectM/s. Sarthak Associates Prop. Mr.Santosh Sakhare—P51500021253
ArchitectSarthak Associates—P51500033700
Chartered accountantPankaj Bangad & Company—P51500033700
Chartered accountantPankaj Bangad & Company—P51500021253
Chartered accountantS D Agrawal and Associates—P51500021253
Chartered accountantShrenik Sancheti—P51500021253
EngineerPradeep V Mote—P51500033700
EngineerYashwant Patil—P51500021253
OtherShaikh Saleem Shaikh Majeed—P51500021253

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology