Venugopal Park

Active

Shioor, Aurangabad 431116 |Promoter: Yashwant Mukund Kharote

Residential / Group HousingRERAP51500080797
10 Jul 2025Registered with MahaRERA
31 Mar 2030Promised completion
13Buildings
112Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
13
Unit types
Rowhouse112 units in all
Land area for this project
12,134 sq m (1,30,606 sq ft)
Permissible built-up area
6,300 sq m (67,810 sq ft)
Sanctioned built-up area
5,300 sq m (57,046 sq ft)
Recreational open space
1,522 sq m (16,384 sq ft)
Planning authority
District Collector Office Aurangabad
Address
Gut No 708 of Mouje-Shivoor, Vaijapur, Shivoor, ShivoorPIN 431116
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.08230, 74.90453
Venugopal Park is at latitude 20.08230, longitude 74.90453.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2030

Registered
10 Jul 2025
Promised
31 Mar 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150008079710 Jul 202531 Mar 2030—Yashwant Mukund KharoteProject page

13 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A29
Building B29
Building C29
Building D29
Building E212
Building F212
Building G212
Building H29
Building I28
Building J26
Building k26
Building L26
Building M25

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

112 units registered

Rowhouse · 112 units
BuildingTypeCarpet areaUnits
Building ARowhouse51.19 sq m · 551 sq ft9
Building BRowhouse51.19 sq m · 551 sq ft9
Building CRowhouse51.19 sq m · 551 sq ft9
Building DRowhouse51.19 sq m · 551 sq ft9
Building ERowhouse34.36 sq m · 370 sq ft11
Building ERowhouse51.19 sq m · 551 sq ft1
Building FRowhouse34.36 sq m · 370 sq ft11
Building FRowhouse51.19 sq m · 551 sq ft1
Building GRowhouse34.36 sq m · 370 sq ft11
Building GRowhouse51.19 sq m · 551 sq ft1
Building HRowhouse34.36 sq m · 370 sq ft8
Building HRowhouse51.19 sq m · 551 sq ft1
Building IRowhouse34.36 sq m · 370 sq ft6
Building IRowhouse51.19 sq m · 551 sq ft2
Building JRowhouse51.19 sq m · 551 sq ft6
Building kRowhouse51.19 sq m · 551 sq ft6
Building LRowhouse51.19 sq m · 551 sq ft6
Building MRowhouse51.19 sq m · 551 sq ft5

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building AClosed/Covered00003
Building AOpen Space00000
Building BClosed/Covered00003
Building BOpen Space00000
Building CClosed/Covered00003
Building COpen Space00000
Building DClosed/Covered00003
Building DOpen Space00000
Building EClosed/Covered00000
Building EOpen Space00000
Building FClosed/Covered00000
Building FOpen Space00000
Building GClosed/Covered00000
Building GOpen Space00000
Building HClosed/Covered00000
Building HOpen Space00000
Building IClosed/Covered00000
Building IOpen Space00000
Building JClosed/Covered00002
Building JOpen Space00000
Building kClosed/Covered00002
Building kOpen Space00000
Building LClosed/Covered00002
Building LOpen Space00000
Building MClosed/Covered00002
Building MOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building A

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building B

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building D

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building F

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building G

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building H

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building I

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building J

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building k

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building L

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building M

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWBM Done70%
  • Water Supplywell50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not Yet Started0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingWork in progress70%
  • Street LightingCompleted100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalWork in progress80%
  • Water conservation /Rain water harvestingNot Yet Started0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot Yet Started0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 72 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSEARCH.pdf · uploaded 10 Apr 2025View
  • Copy of the legal title reportSEARCH.pdf · uploaded 10 Apr 2025View
  • Copy of Layout Approval (in case of layout)plan -1.pdf · uploaded 10 Apr 2025View
  • Building Plan Approval / NA Order for plotted developmentplan.pdf · uploaded 10 Apr 2025View
  • Copy of Layout Approval (in case of layout)plan -1.pdf · uploaded 10 Apr 2025View
  • Building Plan Approval / NA Order for plotted developmentplan.pdf · uploaded 10 Apr 2025View
  • Commencement Certificates / NA Order for plotted developmentCert_BP_Padmabhushan Saindane_224471_420.pdf · uploaded 10 Apr 2025View
  • Commencement Certificates / NA Order for plotted developmentCert_BP_Padmabhushan Saindane_224471_420.pdf · uploaded 10 Apr 2025View
  • a Details of encumbrances concerned to FinanceDeclaration of No encumbernce_0001.pdf · uploaded 10 Apr 2025View
  • b Details of encumbrances concerned to LegalDeclaration of No encumbernce_0001.pdf · uploaded 10 Apr 2025View
  • a Details of encumbrances concerned to FinanceDeclaration of No encumbernce_0001.pdf · uploaded 10 Apr 2025View
  • b Details of encumbrances concerned to LegalDeclaration of No encumbernce_0001.pdf · uploaded 10 Apr 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)Format -A_0001.pdf · uploaded 10 Apr 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A_0001.pdf · uploaded 10 Apr 2025View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure for secured -unsecured_0001.pdf · uploaded 10 Apr 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)Format -A_0001.pdf · uploaded 10 Apr 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A_0001.pdf · uploaded 10 Apr 2025View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure for secured -unsecured_0001.pdf · uploaded 10 Apr 2025View
  • Deviation Report with respect to Allotment letterTo whow so ever it may concern_0001_0001.pdf · uploaded 10 Apr 2025View
  • Deviation Report with respect to model copy of AgreementTo whow so ever it may concern_0001.pdf · uploaded 10 Apr 2025View
  • Deviation Report with respect to Allotment letterTo whow so ever it may concern_0001_0001.pdf · uploaded 10 Apr 2025View
  • Deviation Report with respect to model copy of AgreementTo whow so ever it may concern_0001.pdf · uploaded 10 Apr 2025View
  • Declaration in FORM BForm B affidavit.pdf · uploaded 12 Apr 2025View
  • Declaration in FORM BForm B affidavit.pdf · uploaded 12 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Er Sudarshan.pdf · uploaded 12 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Er Sudarshan.pdf · uploaded 12 Apr 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARSunil Chawda - converted.pdf · uploaded 12 Apr 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARSunil Chawda - converted.pdf · uploaded 12 Apr 2025View
  • Proforma of Agreement for saleASF.pdf · uploaded 12 Apr 2025View
  • Proforma of Agreement for saleASF.pdf · uploaded 12 Apr 2025View
  • Proforma of Allotment letterallotment letter.pdf · uploaded 12 Apr 2025View
  • Proforma of Allotment letterallotment letter.pdf · uploaded 12 Apr 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format -B_0001.pdf · uploaded 12 Apr 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format -B_0001.pdf · uploaded 12 Apr 2025View
  • Declaration about Commencement CertificateFormat-D_0001.pdf · uploaded 6 May 2025View
  • Declaration about Commencement CertificateFormat-D_0001.pdf · uploaded 6 May 2025View
  • CERSAI detailsDecleration_0001.pdf · uploaded 6 May 2025View
  • CERSAI detailsDecleration_0001.pdf · uploaded 6 May 2025View
  • Other – TechnicalAnnexure A_0001.pdf · uploaded 6 May 2025View
  • Other – TechnicalAnnexure A_0001.pdf · uploaded 6 May 2025View
  • Other – Technical708and710 (Yashwant pur).pdf · uploaded 7 May 2025View
  • Other – Technical708and710 (Yashwant pur).pdf · uploaded 7 May 2025View
  • a Details of encumbrances concerned to FinanceEncumbrancr Declration_0001.pdf · uploaded 7 May 2025View
  • b Details of encumbrances concerned to LegalEncumbrancr Declration_0001.pdf · uploaded 7 May 2025View
  • a Details of encumbrances concerned to FinanceEncumbrancr Declration_0001.pdf · uploaded 7 May 2025View
  • b Details of encumbrances concerned to LegalEncumbrancr Declration_0001.pdf · uploaded 7 May 2025View
  • a Details of encumbrances concerned to FinanceDecleration of No-Encumbrance_0001.pdf · uploaded 7 May 2025View
  • b Details of encumbrances concerned to LegalDecleration of No-Encumbrance_0001.pdf · uploaded 7 May 2025View
  • a Details of encumbrances concerned to FinanceDecleration of No-Encumbrance_0001.pdf · uploaded 7 May 2025View
  • b Details of encumbrances concerned to LegalDecleration of No-Encumbrance_0001.pdf · uploaded 7 May 2025View
  • Other – Legal708and710 (Yashwant pur).pdf · uploaded 19 May 2025View
  • Other – Legal708and710 (Yashwant pur).pdf · uploaded 19 May 2025View
  • Commencement Certificates / NA Order for plotted developmentGmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf · uploaded 5 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentGmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf · uploaded 5 Jul 2025View
  • Other – TechnicalGmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf · uploaded 5 Jul 2025View
  • Other – TechnicalGmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf · uploaded 5 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentपत्र.pdf · uploaded 5 Jul 2025View
  • Other – Technicalपत्र.pdf · uploaded 5 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentपत्र.pdf · uploaded 5 Jul 2025View
  • Other – Technicalपत्र.pdf · uploaded 5 Jul 2025View

Promoter documents

  • Legal Title reportSEARCH.pdf · uploaded 10 Apr 2025View
  • Legal Title reportSEARCH.pdf · uploaded 10 Apr 2025View
  • Declaration Form BForm B affidavit.pdf · uploaded 12 Apr 2025View
  • Declaration Form BForm B affidavit.pdf · uploaded 12 Apr 2025View

Technical documents

  • Layout Approvalplan -1.pdfView
  • Building Plan Approvalplan.pdfView
  • Layout Approvalplan -1.pdfView
  • Building Plan Approvalplan.pdfView

Other legal documents

  • Other – Legal708and710 (Yashwant pur).pdfView
  • Other – Legal708and710 (Yashwant pur).pdfView

Proforma allotment letter

  • Proforma allotment letterallotment letter.pdfView
  • Proforma allotment letterallotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shioor, Vaijapur taluka

Survey, CTS, gat or plot numbers

Gut No 708 of MoujeShivoor

As published on MahaRERA's project page

Gut No 708 of Mouje-Shivoor, Vaijapur

Boundaries

North
Gut No 708 Part
South
Gut No 708 Part
East
Gut No 706
West
Gut No 710

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Sunil Chawda—
Chartered accountantCA Sachin Lathi—
EngineerSudarshan Anawade—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology