Sawangi City

Active

Sawangi, Aurangabad 431001 |Promoter: Jayesh Infra

Residential / Group HousingRERAP51500050204
21 Mar 2023Registered with MahaRERA
31 Dec 2027Promised completion
6Buildings
302Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
6
Unit types
2BHK, 1BHK302 units in all
Land area for this project
21,647 sq m (2,33,010 sq ft)
Permissible built-up area
20,347 sq m (2,19,011 sq ft)
Sanctioned built-up area
13,665 sq m (1,47,090 sq ft)
Recreational open space
2,165 sq m (23,304 sq ft)
Address
259 Gut No 31 Sawangi Aurangabad, Jalgaon Road, Plot No 259 Gut No 31 Village Sawangi AurangabadPIN 431001
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
21 Mar 2023
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005020421 Mar 202331 Dec 2027—Jayesh InfraProject page

6 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

302 units registered

2BHK · 158 units1BHK · 144 units
BuildingTypeCarpet areaUnits
A Type Row House2BHK57.52 sq m · 619 sq ft158
B Type Row House1BHK29.95 sq m · 322 sq ft0
C Type Flat1BHK29.7 sq m · 320 sq ft48
D Type Flat1BHK29.7 sq m · 320 sq ft48
E Type Flat1BHK29.7 sq m · 320 sq ft48

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A Type Row HouseClosed/Covered00000
A Type Row HouseOpen Space0000344
B Type Row HouseClosed/Covered00000
B Type Row HouseOpen Space000013
C Type FlatClosed/Covered00000
C Type FlatOpen Space000047
D Type FlatClosed/Covered00000
D Type FlatOpen Space000047
E Type FlatClosed/Covered00000
E Type FlatOpen Space000047

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Type Row House

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B Type Row House

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C Type Flat

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 6 buildings and common areasShow fewer buildings and common areas

D Type Flat

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

E Type Flat

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWILL BE DONE0%
  • Water SupplyWELL WILL BE DONE0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIK TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingIN OPEN SPACE0%
  • Street LightingWILL BE DONE0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWILL BE DONE0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingUP TO BORE WELL100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWILL BE DONE0%
  • Aggregate area of recreational Open SpaceWILL BE DONE0%
  • Open ParkingWILL BE DONE0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

63 documents held by Deedo, 74 filings listed on MahaRERA's project page

Title report

Commencement certificate (2)

Form B

Form 1 (8)

Show all 137 documentsShow fewer documents

Form 1 (8)

Form 2 (8)

Other (29)

Encumbrance details (2)

Allotment letter (2)

Registration certificate

Layout plan

Building plan (8)

Document library

  • Copy of the legal title reportSEARCH REPORT PDF.pdf · uploaded 6 Mar 2023View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMISSION.pdf · uploaded 6 Mar 2023View
  • Declaration about Commencement Certificatedeclaration abour commence certificate.pdf · uploaded 6 Mar 2023View
  • Declaration in FORM BForm B.pdf · uploaded 6 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate.pdf · uploaded 6 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 6 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDiscloser interest 1.pdf · uploaded 6 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizationsdiscloser interest.pdf · uploaded 6 Mar 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A bank account.pdf · uploaded 6 Mar 2023View
  • Deviation Report with respect to Allotment letterno deviation alotment.pdf · uploaded 6 Mar 2023View
  • Deviation Report with respect to model copy of Agreementno dveation ats.pdf · uploaded 6 Mar 2023View
  • Copy of Layout Approval (in case of layout)LAY OUT.pdf · uploaded 6 Mar 2023View
  • Building Plan Approval / NA Order for plotted development01-04.pdf · uploaded 6 Mar 2023View
  • Building Plan Approval / NA Order for plotted development02-04.pdf · uploaded 6 Mar 2023View
  • Building Plan Approval / NA Order for plotted development03-04.pdf · uploaded 6 Mar 2023View
  • Building Plan Approval / NA Order for plotted development04-04.pdf · uploaded 6 Mar 2023View
  • a Details of encumbrances concerned to Financeself declaration encumbrnc.pdf · uploaded 11 Mar 2023View
  • b Details of encumbrances concerned to Legalself declaration encumbrnc.pdf · uploaded 11 Mar 2023View
  • Proforma of Allotment letterALLOTMENT LETTER SAWANGI CITY N.pdf · uploaded 11 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizationsdiscloser interest.pdf · uploaded 11 Mar 2023View
  • CERSAI detailscresai.pdf · uploaded 11 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations1.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations2.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations3.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations4.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations5.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations6.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations7.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations8.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations9.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations10.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations11.pdf · uploaded 16 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations12.pdf · uploaded 16 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizations13.pdf · uploaded 16 Mar 2023View
  • Proforma of Agreement for saleAFS.pdf · uploaded 17 Mar 2023View
  • Other – Technicalform d.pdf · uploaded 20 Mar 2023View
  • Disclosure of sold/ booked inventoryDocScanner Nov 24, 2023 12-53 PM.pdf · uploaded 24 Nov 2023View
  • Disclosure of sold/ booked inventoryinventory.pdf · uploaded 24 Nov 2023View
  • Disclosure of sold/ booked inventorybooking inventory 31122023.pdf · uploaded 19 Mar 2024View
  • Building Plan Approval / NA Order for plotted developmentPLAN 01.pdf · uploaded 19 Mar 2024View
  • Building Plan Approval / NA Order for plotted developmentPLAN 02.pdf · uploaded 19 Mar 2024View
  • Building Plan Approval / NA Order for plotted developmentPLAN 03.pdf · uploaded 19 Mar 2024View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMISSION.pdf · uploaded 19 Mar 2024View
  • Building Plan Approval / NA Order for plotted developmentPLAN 04.pdf · uploaded 19 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artiteceh certificate 3062023.pdf · uploaded 20 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artieceh certificate 3092023.pdf · uploaded 20 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artiteceh certificate 31122023.pdf · uploaded 20 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certifitcae 3062023.pdf · uploaded 20 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 3092023.pdf · uploaded 20 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 31122023.pdf · uploaded 20 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate 31032024.pdf · uploaded 18 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineering certificate 300062024.pdf · uploaded 18 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate 30092024.pdf · uploaded 18 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artitece certifcate 31032024.pdf · uploaded 18 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artitech certificate 30062024.pdf · uploaded 18 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)artiteiceh certificate 30092024.pdf · uploaded 18 Dec 2024View
  • Disclosure of sold/ booked inventoryBOOKING INVENTORY 310332024.pdf · uploaded 18 Dec 2024View
  • Disclosure of sold/ booked inventoryBOOKING INVENTORY 30062024.pdf · uploaded 18 Dec 2024View
  • Disclosure of sold/ booked inventoryBOOKING INVENTORY 30092024.pdf · uploaded 18 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARTITECEH CERTFICATE 3112024.pdf · uploaded 7 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTFICATE 31122024.pdf · uploaded 7 May 2025View
  • Disclosure of sold/ booked inventoryBOOKING INVENTORY 31202024.pdf · uploaded 7 May 2025View

Promoter documents

  • Legal Title reportSEARCH REPORT PDF.pdf · uploaded 6 Mar 2023View
  • Declaration Form BForm B.pdf · uploaded 6 Mar 2023View

Technical documents

  • Layout ApprovalLAY OUT.pdfView
  • Building Plan Approval01-04.pdfView
  • Building Plan Approval02-04.pdfView
  • Building Plan Approval03-04.pdfView
  • Building Plan Approval04-04.pdfView
  • Building Plan ApprovalPLAN 01.pdfView
  • Building Plan ApprovalPLAN 02.pdfView
  • Building Plan ApprovalPLAN 03.pdfView
  • Building Plan ApprovalPLAN 04.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER SAWANGI CITY N.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sawangi, Aurangabad taluka

Survey, CTS, gat or plot numbers

259 GUT NO 31 SAWANGI AURANGABAD

As published on MahaRERA's project page

259 GUT NO 31 SAWANGI AURANGABAD

Boundaries

North
Land Gut No 30
South
Layout Gut No 31
East
Land Gut No 30
West
Land Gut No 26 27 And 28

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay Doifode—
Chartered accountantV R Jaju And Con—
EngineerAbhay S Patil—
OtherGulab Mohammad Shaikh—
OtherHari Laxman Wani—
OtherIdris Ebrahim Shaha—
OtherShaker Shakur Khan—
OtherSheru Nijam Shaha—

Source: MahaRERA project page. Contact details are not shown.