Sara Parivartan - Sector B - Phase 1

Completed

Sawangi, Aurangabad 431008 |Promoter: Sara Properties

Residential / Group HousingRERAP51500001468
28 Jul 2017Registered with MahaRERA
15 Aug 2019Promised completion
6Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
6
Land area for this project
6,877 sq m (74,025 sq ft)
Permissible built-up area
9,768 sq m (1,05,142 sq ft)
Sanctioned built-up area
9,768 sq m (1,05,142 sq ft)
Recreational open space
1,438 sq m (15,475 sq ft)
Address
Survey No. 234/2PIN 431008
Designated bank account
Dombivli Nagari Sahakari Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.95600, 75.35681
Sara Parivartan - Sector B - Phase 1 is at latitude 19.95600, longitude 75.35681.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Aug 2019

The latest completion date on record passed 7 years and 2 months ago.

Registered
28 Jul 2017
Promised
15 Aug 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000146828 Jul 201715 Aug 2019—Sara PropertiesProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
E10-E114—
E15-E164—
E1-E24—
E3-E44—
F5-F64—
G7-G8-G94—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
E10-E11Closed/Covered00000
E10-E11Open Space00000
E15-E16Closed/Covered00000
E15-E16Open Space00000
E1-E2Closed/Covered00000
E1-E2Open Space00000
E3-E4Closed/Covered00000
E3-E4Open Space00000
F5-F6Closed/Covered00000
F5-F6Open Space00000
G7-G8-G9Closed/Covered00000
G7-G8-G9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

E10-E11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

E15-E16

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

E1-E2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

E3-E4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

F5-F6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

G7-G8-G9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTRIMIX ROAD100%
  • Water SupplyWELL/ BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)STP/ SEPTIC TANK100%
  • Storm Water DrainsAS PER CONSULTANT100%
  • Landscaping & Tree PlantingAS PER CONSULTANT100%
  • Street LightingAS PER CONSULTANT100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER CONSULTANT100%
  • Solid Waste Management And DisposalAS PER CONSULTANT100%
  • Water conservation /Rain water harvestingAS PER CONSULTANT100%
  • Energy managemcntAS PER CONSULTANT100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT100%
  • Aggregate area of recreational Open SpaceAS PER CONSULTANT100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 27 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)LAY-OUT.pdf · uploaded 18 Jul 2017View
  • Building Plan Approval (IOD)E TYPE BUILDING WING - 1-2, 3-4, 10-11.pdf · uploaded 18 Jul 2017View
  • Building Plan Approval (IOD)E TYPE BUILDING WING -15-16.pdf · uploaded 18 Jul 2017View
  • Building Plan Approval (IOD)F TYPE BUILDING - 5-6.pdf · uploaded 18 Jul 2017View
  • Building Plan Approval (IOD)G TYPE BUILDING - 7-8-9.pdf · uploaded 18 Jul 2017View
  • Details of encumbrancesSARA PARIVARTAN SEC B - INDEX.pdf · uploaded 19 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER-3-SARA PARIVARTAN SEC B.pdf · uploaded 19 Jul 2017View
  • Copy of the legal title reportTITLE SEARCH REPORT - SARA PARIVARTAN-B.pdf · uploaded 22 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT - SECTOR B AND E.pdf · uploaded 24 Jul 2017View
  • Proforma of Allotment letterATS Draft - Sara Parivartan - B.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BForm B - Pariartan Sector B.pdf · uploaded 26 Jul 2017View
  • OtherAdditional Affidavit - Pariartan Sector B.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - ENGINEER CERTIFICATE SARA PARIVARTAN SEC B PH-1.pdf · uploaded 16 Nov 2018View
  • Certificates of CA (Form 5)FORM 5 - SARA PARIVARTAN SEC B PH I.pdf · uploaded 16 Nov 2018View
  • Certificates of Architect (Form 4)FORM 4 - ARCHITECTS CERTIFICATE SARA PARIVARTAN SECTOR B PH-1.pdf · uploaded 16 Nov 2018View
  • Declaration about Commencement CertificateDeclaration of CC - Parivartan B1.pdf · uploaded 30 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - Pariv B1_compressed.pdf · uploaded 30 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSARA PARIVARTAN SECTOR B PHASE 1.pdf · uploaded 11 Sep 2023View

Promoter documents

  • Legal Title reportTITLE SEARCH REPORT - SARA PARIVARTAN-B.pdf · uploaded 22 Jul 2017View
  • Declaration Form BForm B - Pariartan Sector B.pdf · uploaded 26 Jul 2017View

Technical documents

  • Layout ApprovalLAY-OUT.pdfView
  • Building Plan ApprovalE TYPE BUILDING WING - 1-2, 3-4, 10-11.pdfView
  • Building Plan ApprovalE TYPE BUILDING WING -15-16.pdfView
  • Building Plan ApprovalF TYPE BUILDING - 5-6.pdfView
  • Building Plan ApprovalG TYPE BUILDING - 7-8-9.pdfView

Other legal documents

  • OtherAdditional Affidavit - Pariartan Sector B.pdfView

Proforma allotment letter

  • Proforma allotment letterATS Draft - Sara Parivartan - B.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sawangi, Aurangabad taluka

Survey, CTS, gat or plot numbers

234/2SURVEY NO. 234/2

As published on MahaRERA's project page

SURVEY NO. 234/2

Boundaries

North
Sector C - Of Same Group Housing Scheme
South
Internal Road
East
Land From Gut No 261
West
Internal Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Deshpande—
EngineerNamdev Govindrao Karkhane—
OtherAmol Kshirsagar—
OtherKohinoor Construction—

Source: MahaRERA project page. Contact details are not shown.