Silver Oaks Villas

Completed

Satara (Ct), Aurangabad 431005 |Promoter: Navkar Construction

Residential / Group HousingRERAP51500020485
15 Apr 2019Registered with MahaRERA
20 Apr 2022Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
ROW HOUSE 4 BHK10 units in all
Land area for this project
800 sq m (8,611 sq ft)
Permissible built-up area
969 sq m (10,430 sq ft)
Sanctioned built-up area
969 sq m (10,430 sq ft)
Address
Plot No 23 To 38 Gut No 71 Satara, Beed By Pass, Near Mit CollegePIN 431005
Designated bank account
Shri Chhatrapati Rajashri Shahu Urban Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.21833, 72.97809
Silver Oaks Villas is at latitude 19.21833, longitude 72.97809.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 20 Apr 2022

The latest completion date on record passed 4 years and 6 months ago.

Registered
15 Apr 2019
Promised
20 Apr 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002048515 Apr 201920 Apr 2022—Navkar ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Row House 4 Bhk510

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

ROW HOUSE 4 BHK · 10 units
TypeCarpet areaUnits
ROW HOUSE 4 BHK85.01 sq m · 915 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House 4 Bhk

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsALREADY COMPLETED BY CORPORATION100%
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)ALREADY DONE BY CORPORATION100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION DONE100%
  • Street LightingALREADY DONE BY CORPORATION100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationMETER SUB ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 15 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportLegal Title Report.pdf · uploaded 10 Apr 2019View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCMENT CERTIFICATE.pdf · uploaded 10 Apr 2019View
  • Proforma of Allotment letterModel Agreement to sale.pdf · uploaded 10 Apr 2019View
  • Building Plan Approval (IOD)BUILDING PLAN APPROVAL.pdf · uploaded 10 Apr 2019View
  • Declaration in FORM BFORM B NAVKAR.pdf · uploaded 11 Apr 2019View
  • Details of encumbrancesDetails of encumbrances.pdf · uploaded 11 Apr 2019View
  • Copy of Layout Approval (in case of layout)LAY OUT PLAN.pdf · uploaded 11 Apr 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentArchitect Certificate.pdf · uploaded 15 Jul 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Archtec certificate.pdf · uploaded 17 Mar 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentsilver oks Occupancy.pdf · uploaded 17 Mar 2023View

Promoter documents

  • Legal Title reportLegal Title Report.pdf · uploaded 10 Apr 2019View
  • Declaration Form BFORM B NAVKAR.pdf · uploaded 11 Apr 2019View

Technical documents

  • Building Plan ApprovalBUILDING PLAN APPROVAL.pdfView
  • Layout ApprovalLAY OUT PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterModel Agreement to sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Satara (CT), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO 23 TO 38 GUT NO 71 SATARA

As published on MahaRERA's project page

PLOT NO 23 TO 38 GUT NO 71 SATARA

Boundaries

North
Six Meter Wide Road
South
Nine Meter Wide Road
East
Seven And Half Meter Wide Road
West
Seven And Half Meter Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogesh Jadhav—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology