Manomay Residency

Completed

Satara (Ct), Aurangabad 431005 |Promoter: Gayatri Developers

Residential / Group HousingRERAP51500008163
18 Aug 2017Registered with MahaRERA
30 Dec 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
2,199 sq m (23,672 sq ft)
Permissible built-up area
4,920 sq m (52,958 sq ft)
Sanctioned built-up area
4,920 sq m (52,958 sq ft)
Address
PLOT NO 31 TO 43, Beed By Pass, Gut No 58PIN 431005
Designated bank account
Saraswat Cooperative Bank Limited
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.98942, 79.26061
Manomay Residency is at latitude 19.98942, longitude 79.26061.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
18 Aug 2017
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000816318 Aug 201730 Dec 2021—Gayatri DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Manomay Residency5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Manomay Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)100%
  • Storm Water Drains100%
  • Landscaping & Tree Planting100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 27 filings listed on MahaRERA's project page

Form B

Commencement certificate (2)

Form 1

Form 2

Title report (2)

Form 5

Show all 60 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate30 Dec 2020ViewSource

Form 4

Registration certificate

Other (17)

Layout plan (2)

Building plan (2)

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)GAYATRI DEVELOPERS.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)building sanction plan.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesForm B promoter 300717.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM BForm B promoter 300717.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentGAYATRI DEVELOPERS1.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate 300717.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)structural engineer certificate 300717.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout plan.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterRera Draft-MANOMAY RESIDENCY.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportSearch-title-report-1-6.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportSearch-title-report-7-12.pdf · uploaded 31 Jul 2017View
  • Certificates of CA (Form 5)Form 5 Scanned.pdf · uploaded 30 Sep 2018View
  • Building Plan Approval (IOD)amended layout.pdf · uploaded 27 Dec 2019View
  • Commencement Certificates / NA Order for plotted developmentIMG_0772.pdf · uploaded 27 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 30 Dec 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy-converted-compressed.pdf · uploaded 30 Dec 2020View
  • Architect’s Certificate on Completion of Project (Form 4)form 4.pdf · uploaded 12 Jun 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Manomay Bank Acc application compressed.pdf · uploaded 27 Oct 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)society registration certificate.pdf · uploaded 23 Dec 2021View

Promoter documents

  • Declaration Form BForm B promoter 300717.pdf · uploaded 30 Jul 2017View
  • Legal Title reportSearch-title-report-1-6.pdf · uploaded 31 Jul 2017View
  • Legal Title reportSearch-title-report-7-12.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalLayout plan.pdfView
  • Layout ApprovalGAYATRI DEVELOPERS.pdfView
  • Building Plan Approvalbuilding sanction plan.pdfView
  • Building Plan Approvalamended layout.pdfView

Proforma allotment letter

  • Proforma allotment letterRera Draft-MANOMAY RESIDENCY.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Satara (CT), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO 31 TO 43

As published on MahaRERA's project page

PLOT NO 31 TO 43

Boundaries

North
7 Mtr Wide Road
South
Gut No 44
East
6 Mtr Wide Road
West
9 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrasad Shripad Kulkarni—
EngineerRavindra Babhulay—
Real Estate AgentNeelam Sanjay Mehra—
OtherSandu Asaram Dhawalanpure—
Registered real estate agentNeelamSanjay MehraA51500017123

Source: MahaRERA project page. Contact details are not shown.