Shrinath Park

Completed

Pisadevi, Aurangabad 431001 |Promoter: Shri Nath Vihar Constructions

Residential / Group HousingRERAP51500006059
14 Aug 2017Registered with MahaRERA
30 Dec 2021Promised completion
29 Jun 2022Revised completionPushed back 6 months
4Buildings
49Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
4
Unit types
Row house, 1 RK, FLAT 1 BHK49 units in all
Land area for this project
5,300 sq m (57,049 sq ft)
Permissible built-up area
3,881 sq m (41,776 sq ft)
Sanctioned built-up area
2,815 sq m (30,301 sq ft)
Recreational open space
527 sq m (5,674 sq ft)
Address
Gut No 99 P And 100 PPIN 431001
Designated bank account
Union Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13725, 79.05886
Shrinath Park is at latitude 21.13725, longitude 79.05886.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 months

The latest completion date on record passed 4 years and 4 months ago.

Registered
14 Aug 2017
Promised
30 Dec 2021
Revised
29 Jun 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000605914 Aug 201730 Dec 202129 Jun 2022Shri Nath Vihar ConstructionsProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A39
Wing B39
Wing C37
Wing D724

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

49 units registered

Row house · 25 units1 RK · 4 unitsFLAT 1 BHK · 20 units
BuildingTypeCarpet areaUnits
Wing ARow house44.96 sq m · 484 sq ft7
Wing ARow house58 sq m · 624 sq ft2
Wing BRow house44.96 sq m · 484 sq ft7
Wing BRow house58 sq m · 624 sq ft2
Wing CRow house80 sq m · 861 sq ft5
Wing CRow house80 sq m · 861 sq ft2
Wing D1 RK19.42 sq m · 209 sq ft4
Wing DFLAT 1 BHK30 sq m · 323 sq ft4
Wing DFLAT 1 BHK31.35 sq m · 337 sq ft4
Wing DFLAT 1 BHK31.5 sq m · 339 sq ft4
Wing DFLAT 1 BHK33.5 sq m · 361 sq ft4
Wing DFLAT 1 BHK34.5 sq m · 371 sq ft4

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00000
Wing AOpen Space000027
Wing BClosed/Covered00000
Wing BOpen Space000027
Wing CClosed/Covered00000
Wing COpen Space000019
Wing DClosed/Covered000060
Wing DOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAS PER PLAN100%
  • Water SupplyBORE WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER PLAN100%
  • Street LightingAS PER PLAN100%
  • Community BuildingsSOCIETY OFFICE AS PER PLAN100%
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAS PER PLAN100%
  • Open ParkingAS PER PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 26 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title report2 Copy of the Legal Report.pdf · uploaded 30 Jul 2017View
  • Details of encumbrances3 Detail of encumbrances.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)4 Copy of Layout Approval.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letter5A Proforma of the Agreement to sale-Shrinath Construction.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM B6 Declaration in Form B.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letter5B Proforma of the Agreement to sale-Om Sai Ram.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 Certificate of Architect-Form 1.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)10 Permission.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)8 Certificate of Engineer-Form 2.pdf · uploaded 30 Jul 2017View
  • Declaration about Commencement CertificateDeclaration Commenment certificate.PDF · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySold Unsold Details.PDF · uploaded 9 Feb 2022View
  • CERSAI detailsCERSAI Report.pdf · uploaded 9 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Cert.pdf · uploaded 25 Feb 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 25 Feb 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 25 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Audit Report 17-18.pdf · uploaded 26 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 18-19.pdf · uploaded 26 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Audit Report 19-20_compressed.pdf · uploaded 26 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Audit Report 20-21_compressed.pdf · uploaded 26 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_200231356619_For_Asset_Based_Search_01_03_2022_12_11_08_964.pdf · uploaded 1 Mar 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy certificate.pdf · uploaded 18 Jun 2024View

Promoter documents

  • Legal Title report2 Copy of the Legal Report.pdf · uploaded 30 Jul 2017View
  • Declaration Form B6 Declaration in Form B.pdf · uploaded 30 Jul 2017View

Technical documents

  • Layout Approval4 Copy of Layout Approval.pdfView
  • Building Plan Approval10 Permission.pdfView

Proforma allotment letter

  • Proforma allotment letter5B Proforma of the Agreement to sale-Om Sai Ram.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pisadevi, Aurangabad taluka

Survey, CTS, gat or plot numbers

100 PGUT NO 99 P

As published on MahaRERA's project page

GUT NO 99 P AND 100 P

Boundaries

North
15 Mtr Wide Dp Road
South
Gut No 98
East
Balance Land Of Gut No 98 And 100
West
Balance Land Of Gut No 99 And 100

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrashant Prabhakar Muley—
Chartered accountantAvinash D Mahulkar And Associaes—
Chartered accountantYashodeep Bafna—
EngineerPrasad Arun Aphale—
OtherMayur Purushottam Kathar—
OtherPradeep Rambhau Kale—
OtherPrasad Arun Aphale—
OtherSunil Bhagwat Mahajan—
OtherSunil Vasant Kudale—

Source: MahaRERA project page. Contact details are not shown.