Samruddhi Residency 2

Certificate Signed

Pisadevi, Aurangabad 431008 |Promoter: Tejal Realty

Residential / Group HousingRERAP51500028391
23 Feb 2021Registered with MahaRERA
30 Jun 2027Promised completion
30 Oct 2027Revised completionPushed back 4 months
5Buildings
132Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
2BHK, 1BHK, 3BHK132 units in all
Address
Gut 138, Main Road, PisadeviPIN 431008
Designated bank account
229
Developed in phases
Yes

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
23 Feb 2021
Promised
30 Jun 2027
Revised
30 Oct 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002839123 Feb 202130 Jun 202730 Oct 2027Tejal RealtyProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Apartment Building-B760
Apartment Building-C748
Type-A148
Type-A248
Type-A348

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 132 units booked (0%), as the promoter reported to MahaRERA

2BHK · 96 units1BHK · 12 units3BHK · 24 units
BuildingTypeCarpet areaUnitsBooked
Apartment Building-B2BHK45.84 sq m · 493 sq ft10
Apartment Building-B2BHK45.84 sq m · 493 sq ft10
Apartment Building-B2BHK45.84 sq m · 493 sq ft10
Apartment Building-B2BHK45.89 sq m · 494 sq ft10
Apartment Building-B2BHK45.89 sq m · 494 sq ft10
Apartment Building-B2BHK49.38 sq m · 532 sq ft10
Apartment Building-B2BHK49.38 sq m · 532 sq ft10
Apartment Building-B2BHK49.8 sq m · 536 sq ft10
Show all 132 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Apartment Building-B2BHK50.35 sq m · 542 sq ft10
Apartment Building-B2BHK50.35 sq m · 542 sq ft10
Apartment Building-B2BHK50.49 sq m · 543 sq ft10
Apartment Building-B2BHK50.49 sq m · 543 sq ft10
Apartment Building-B2BHK50.73 sq m · 546 sq ft10
Apartment Building-B2BHK50.73 sq m · 546 sq ft10
Apartment Building-B2BHK50.74 sq m · 546 sq ft10
Apartment Building-B2BHK50.74 sq m · 546 sq ft10
Apartment Building-B2BHK51.25 sq m · 552 sq ft10
Apartment Building-B2BHK51.25 sq m · 552 sq ft10
Apartment Building-B2BHK51.25 sq m · 552 sq ft10
Apartment Building-B2BHK51.25 sq m · 552 sq ft10
Apartment Building-B2BHK51.25 sq m · 552 sq ft10
Apartment Building-B2BHK51.73 sq m · 557 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.35 sq m · 563 sq ft10
Apartment Building-B2BHK52.38 sq m · 564 sq ft10
Apartment Building-B2BHK52.38 sq m · 564 sq ft10
Apartment Building-B2BHK52.38 sq m · 564 sq ft10
Apartment Building-B2BHK52.38 sq m · 564 sq ft10
Apartment Building-B2BHK52.38 sq m · 564 sq ft10
Apartment Building-B2BHK53.28 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK53.34 sq m · 574 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK54.02 sq m · 581 sq ft10
Apartment Building-B2BHK55.59 sq m · 598 sq ft10
Apartment Building-B2BHK55.62 sq m · 599 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK56.73 sq m · 611 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-B2BHK57.05 sq m · 614 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK29.7 sq m · 320 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C1BHK42.83 sq m · 461 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK46.27 sq m · 498 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK49.62 sq m · 534 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK52.14 sq m · 561 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK53.84 sq m · 580 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK55.26 sq m · 595 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Apartment Building-C2BHK56.08 sq m · 604 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A13BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A23BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10
Type-A33BHK64.22 sq m · 691 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 136 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardrealty pan.pdf · uploaded 11 Feb 2021Source

Legal

  • Legal Title reportsearch report.pdf · uploaded 11 Feb 2021Source
  • Declaration Form Bform b.pdf · uploaded 11 Feb 2021Source

Migrated

  • 1 PAN Cardrealty pan.pdf · uploaded 11 Feb 2021Source
  • 1 Copy of the legal title reportsearch report.pdf · uploaded 11 Feb 2021Source
  • 1 Details of encumbrancesno encu.pdf · uploaded 11 Feb 2021Source
  • 1 Copy of Layout Approval (in case of layout)SUNIL PATIL 1_compressed_compressed.pdf · uploaded 11 Feb 2021Source
Show all 137 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 5_compressed.pdf · uploaded 11 Feb 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 6_compressed.pdf · uploaded 11 Feb 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 7_compressed.pdf · uploaded 11 Feb 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 2_compressed.pdf · uploaded 11 Feb 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 3_compressed.pdf · uploaded 11 Feb 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentSUNIL PATIL 4_compressed.pdf · uploaded 11 Feb 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentSUNIL PATIL 0000_compressed.pdf · uploaded 11 Feb 2021Source
  • 1 Declaration in FORM Bform b.pdf · uploaded 11 Feb 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch_compressed.pdf · uploaded 11 Feb 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engi_compressed.pdf · uploaded 11 Feb 2021Source
  • 1 Proforma of Allotment letterATs.pdf · uploaded 11 Feb 2021Source
  • 2 Proforma of Allotment letteral.pdf · uploaded 11 Feb 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A.pdf · uploaded 12 Feb 2021Source
  • 7 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 1 Dec 2022Source
  • 8 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 1 Dec 2022Source
  • 9 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 1 Dec 2022Source
  • 10 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 1 Dec 2022Source
  • 11 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 1 Dec 2022Source
  • 12 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 1 Dec 2022Source
  • 13 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 1 Dec 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentrevised building permission.pdf · uploaded 1 Dec 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)artitech certificate.pdf · uploaded 1 Dec 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form no 02 engineers certificate.pdf · uploaded 1 Dec 2022Source
  • Form 1FORM 1 31032021.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 31032021.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 31032021.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31032021.pdf · uploaded 4 Oct 2025Source
  • Others2A 31032021.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 30062021.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 30062021.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 30062021.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30062021.pdf · uploaded 4 Oct 2025Source
  • Others2A 30062021.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 30092021.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 1 30092021.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 30092021.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30092021.pdf · uploaded 4 Oct 2025Source
  • Others2A 30092021.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 31122021.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 31122021.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 31122021.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31122021.pdf · uploaded 4 Oct 2025Source
  • Others2 A 31122021.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 31032022.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 31032022.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 31032022.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31032022.pdf · uploaded 4 Oct 2025Source
  • Others2 A 31032022.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 30062022.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 30062022.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 30062022.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30062022.pdf · uploaded 4 Oct 2025Source
  • Others2A 30062022.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 30092022.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 30092022.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 30092022.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30092022.pdf · uploaded 4 Oct 2025Source
  • Others2A 30092022.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 31122022.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 31122022.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 31122022.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31122022.pdf · uploaded 4 Oct 2025Source
  • Others2A 31122023.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 31032023.pdf · uploaded 4 Oct 2025Source
  • Form 2FORM 2 31032023.pdf · uploaded 4 Oct 2025Source
  • Form 3FORM 3 31032023.pdf · uploaded 4 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31032023.pdf · uploaded 4 Oct 2025Source
  • Others2A 31032023.pdf · uploaded 4 Oct 2025Source
  • Form 1FORM 1 30062023.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 30062023.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 30062023.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30062023.pdf · uploaded 5 Oct 2025Source
  • Others2A 30062023.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 30092023.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 30092023.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 30092023.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30092023.pdf · uploaded 5 Oct 2025Source
  • Others2A 30092023.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 31122023.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 31122023.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 31122023.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31122023.pdf · uploaded 5 Oct 2025Source
  • Others2A 31122023.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 31032024.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 31032024.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 31032024.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31032024.pdf · uploaded 5 Oct 2025Source
  • Others2A 31032024.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 30062024.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 30062024.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 30062024.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30062024.pdf · uploaded 5 Oct 2025Source
  • Others2A 30062024.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 30092024.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 1 30092024.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 30092024.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30092024.pdf · uploaded 5 Oct 2025Source
  • Others2A 30092024.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 31122024.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 31122024.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 31122024.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31122024.pdf · uploaded 5 Oct 2025Source
  • Others2 A 31122024.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 31032025.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 31032025.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 31032025.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory31032025.pdf · uploaded 5 Oct 2025Source
  • Others2 A 31032025.pdf · uploaded 5 Oct 2025Source
  • Form 1FORM 1 30062025.pdf · uploaded 5 Oct 2025Source
  • Form 2FORM 2 30062025.pdf · uploaded 5 Oct 2025Source
  • Form 3FORM 3 30062025.pdf · uploaded 5 Oct 2025Source
  • Disclosure of Sold and Booked Inventory30062025.pdf · uploaded 5 Oct 2025Source
  • Others2A 30062025.pdf · uploaded 5 Oct 2025Source

Technical

  • DocumentSUNIL PATIL 1_compressed_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 5_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 6_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 7_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 2_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 3_compressed.pdf · uploaded 11 Feb 2021Source
  • DocumentSUNIL PATIL 4_compressed.pdf · uploaded 11 Feb 2021Source
  • Document1.pdf · uploaded 1 Dec 2022Source
  • Document2.pdf · uploaded 1 Dec 2022Source
  • Document3.pdf · uploaded 1 Dec 2022Source
  • Document4.pdf · uploaded 1 Dec 2022Source
  • Document5.pdf · uploaded 1 Dec 2022Source
  • Document6.pdf · uploaded 1 Dec 2022Source
  • Document7.pdf · uploaded 1 Dec 2022Source

Technical (Architect)

  • Documentartitech certificate.pdf · uploaded 1 Dec 2022Source

Technical (Engineer)

  • Documentform no 02 engineers certificate.pdf · uploaded 1 Dec 2022Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pisadevi, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT 138

Boundaries

North
Land Of Raju Ratan Pakhe In Gut No 138
South
Land Of Ganesh Rambhau Pakhe In Gut 138
East
Land Of Vitthal Gena Mete In 138
West
Land Of Gut 138 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSunil Patil—
Chartered accountantVijaykumar Jaju—
EngineerAbhay Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology