Renuka Nagari

Active

Narayanpur Kh., Aurangabad 431136 |Promoter: Shlok Realty

Residential / Group HousingRERAP51500050288
1 Apr 2023Registered with MahaRERA
31 Mar 2027Promised completion
8Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
8
Land area for this project
12,349 sq m (1,32,926 sq ft)
Permissible built-up area
4,731 sq m (50,929 sq ft)
Sanctioned built-up area
4,231 sq m (45,547 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
Aurangabad Metropolitan Regional Development Authority
Address
Gut No 61 and 62 Narayanpur KH. TQ. Gangapur, Narayanpur Kh., Narayanpur Kh.PIN 431136
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86763, 75.19243
Renuka Nagari is at latitude 19.86763, longitude 75.19243.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2027

Registered
1 Apr 2023
Promised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000502881 Apr 202331 Mar 2027—Shlok RealtyProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A1—
Building B1—
Building C1—
Building D1—
Building E1—
Building F1—
Building G1—
Building H1—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building AClosed/Covered00000
Building AOpen Space00000
Building BClosed/Covered00000
Building BOpen Space00000
Building CClosed/Covered00000
Building COpen Space00000
Building DClosed/Covered00000
Building DOpen Space00000
Building EClosed/Covered00000
Building EOpen Space00000
Building FClosed/Covered00000
Building FOpen Space00000
Building GClosed/Covered00000
Building GOpen Space00000
Building HClosed/Covered00000
Building HOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building A

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building B

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building D

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building E

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building F

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building G

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises25%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building H

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsIn process0%
  • Water SupplyIn Process60%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street Lighting100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

48 documents held by Deedo, 53 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • a Details of encumbrances concerned to Financeencum.pdf · uploaded 20 Mar 2023View
  • b Details of encumbrances concerned to Legalencum.pdf · uploaded 20 Mar 2023View
  • a Details of encumbrances concerned to Financelegal encum.pdf · uploaded 20 Mar 2023View
  • b Details of encumbrances concerned to Legallegal encum.pdf · uploaded 20 Mar 2023View
  • Commencement Certificates / NA Order for plotted developmentCRTIFICATE.pdf · uploaded 20 Mar 2023View
  • Deviation Report with respect to Allotment letterdeviation in allotment.pdf · uploaded 20 Mar 2023View
  • Deviation Report with respect to model copy of Agreementdevi in afs.pdf · uploaded 20 Mar 2023View
  • Copy of Layout Approval (in case of layout)BP PLAN_1.pdf · uploaded 20 Mar 2023View
  • Building Plan Approval / NA Order for plotted developmentBP PLAN_1.pdf · uploaded 20 Mar 2023View
  • Building Plan Approval / NA Order for plotted developmentBP PLAN_2.pdf · uploaded 20 Mar 2023View
  • Declaration about Commencement CertificateFomate D - Shlok Realty_0001.pdf · uploaded 20 Mar 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormate A - Shlok Realty_0001.pdf · uploaded 20 Mar 2023View
  • Proforma of Agreement for salemodel-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf · uploaded 20 Mar 2023View
  • Declaration in FORM BForm B - Shlok Realty_0001.pdf · uploaded 20 Mar 2023View
  • Proforma of Allotment letterallotmrnt letter new format.pdf · uploaded 20 Mar 2023View
  • Copy of the legal title reportSearch Report - --_0001.pdf · uploaded 20 Mar 2023View
  • CERSAI detailsCERSAI_Search_Report_200263707475_For_Asset_Based_Search_21_03_2023_11_06_50_202.pdf · uploaded 21 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizationsmangeshsir.pdf · uploaded 21 Mar 2023View
  • Declaration about Commencement CertificateAffidavit.pdf · uploaded 21 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizationspooja somani.pdf · uploaded 21 Mar 2023View
  • Disclosure of Interest in Other Real Estate Organizationsnarendra surkutwar.pdf · uploaded 21 Mar 2023View
  • Other – TechnicalSele Deed_0001_1.pdf · uploaded 21 Mar 2023View
  • Other – TechnicalSele Deed_0001_2_1.pdf · uploaded 21 Mar 2023View
  • Other – TechnicalSele Deed_0001_2_2.pdf · uploaded 21 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Jan 2024View
  • Disclosure of sold/ booked inventory1 Disclosure of sold booked inventory.pdf · uploaded 5 Jan 2024View
  • CERSAI details1 CERSAI details .pdf · uploaded 5 Jan 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 5 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect’s Certificate - Form 1.pdf · uploaded 16 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 16 May 2024View
  • Disclosure of sold/ booked inventoryDisclosure of sold-Booked Inventory.pdf · uploaded 16 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate-June-2024.pdf · uploaded 10 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate-June-2024.pdf · uploaded 10 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure of Sold - Booked Inventory.pdf · uploaded 10 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Sep2024.pdf · uploaded 17 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 Sep2024.pdf · uploaded 17 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec24.pdf · uploaded 17 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Shlok Realty (Form 5)_compressed.pdf · uploaded 8 Mar 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Shlok Realty FY 23-24.pdf · uploaded 8 Mar 2025View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameshlok Realty Rera 19 202519025.pdf · uploaded 8 Mar 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT B.pdf · uploaded 8 Mar 2025View
  • Withdrawal Update Form 1Architect Certificate June Q1_compressed.pdf · uploaded 12 Feb 2026View
  • Withdrawal Update Form 2Engineering Certificate June Q1.pdf · uploaded 12 Feb 2026View
  • Withdrawal Update Form 1Architect Certificate Sep Q2_compressed.pdf · uploaded 12 Feb 2026View
  • Withdrawal Update Form 2Engineering Certificate Sep Q2_compressed.pdf · uploaded 12 Feb 2026View

Promoter documents

  • Declaration Form BForm B - Shlok Realty_0001.pdf · uploaded 20 Mar 2023View
  • Legal Title reportSearch Report - --_0001.pdf · uploaded 20 Mar 2023View

Technical documents

  • Layout ApprovalBP PLAN_1.pdfView
  • Building Plan ApprovalBP PLAN_1.pdfView
  • Building Plan ApprovalBP PLAN_2.pdfView

Proforma allotment letter

  • Proforma allotment letterallotmrnt letter new format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Narayanpur Kh., Gangapur taluka

Survey, CTS, gat or plot numbers

62 Narayanpur KH. TQ. GangapurGut No 61

As published on MahaRERA's project page

Gut No 61 and 62 Narayanpur KH. TQ. Gangapur

Boundaries

North
Land of Sahebrao Sawai
South
Land of Kadubal Bajirao Bankar
East
Land of Sahebrao Sawai
West
Nala and land of Bharat Raut

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSaurabh Sanjay Mirkute—
Chartered accountantAbhishek Krishnaji Kulkarni—
Chartered accountantCA Manoj Gopikishanji Mundada—
EngineerSachin Shingrikar—

Source: MahaRERA project page. Contact details are not shown.