36 Greens

Certificate Signed

Golwadi, Aurangabad 431005 |Promoter: A.m.patel Infra Pvt Ltd

Residential / Group HousingRERAP51500050638
21 Apr 2023Registered with MahaRERA
30 Nov 2027Promised completion
7Buildings
35Units registered0 booked (0%)
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
7
Unit types
Bungalow35 units in all
Address
Gut No 16, Golwadi, Aurangabad, Paithan Road, Near 30 GreensPIN 431005
Designated bank account
120
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.84793, 75.28752
36 Greens is at latitude 19.84793, longitude 75.28752.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Nov 2027

Registered
21 Apr 2023
Promised
30 Nov 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005063821 Apr 202330 Nov 202730 Nov 2027A.m.patel Infra Pvt LtdProject page

7 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 35 units booked (0%), as the promoter reported to MahaRERA

Bungalow · 35 units
BuildingTypeCarpet areaUnitsBooked
A Type Building Bung No 1,2,3,4,5,6Bungalow389.03 sq m · 4,187 sq ft10
A Type Building Bung No 1,2,3,4,5,6Bungalow391.43 sq m · 4,213 sq ft10
A Type Building Bung No 1,2,3,4,5,6Bungalow392.58 sq m · 4,226 sq ft10
A Type Building Bung No 1,2,3,4,5,6Bungalow392.58 sq m · 4,226 sq ft10
A Type Building Bung No 1,2,3,4,5,6Bungalow392.58 sq m · 4,226 sq ft10
A Type Building Bung No 1,2,3,4,5,6Bungalow392.58 sq m · 4,226 sq ft10
B Type Building 7,8,9,10,11,12Bungalow388.11 sq m · 4,178 sq ft10
B Type Building 7,8,9,10,11,12Bungalow391.43 sq m · 4,213 sq ft10
Show all 22 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B Type Building 7,8,9,10,11,12Bungalow392.58 sq m · 4,226 sq ft40
C Type Building Bung 13 14 15 16Bungalow387.86 sq m · 4,175 sq ft10
C Type Building Bung 13 14 15 16Bungalow391.41 sq m · 4,213 sq ft30
D Type Building Bung No 20Bungalow386.94 sq m · 4,165 sq ft10
E Type Building Bung No 17,18Bungalow386.94 sq m · 4,165 sq ft10
E Type Building Bung No 17,18Bungalow390.49 sq m · 4,203 sq ft10
F Type Building Bung No 21,22,23,24,25,26Bungalow377.23 sq m · 4,060 sq ft10
F Type Building Bung No 21,22,23,24,25,26Bungalow377.23 sq m · 4,060 sq ft10
F Type Building Bung No 21,22,23,24,25,26Bungalow391.41 sq m · 4,213 sq ft10
F Type Building Bung No 21,22,23,24,25,26Bungalow392.58 sq m · 4,226 sq ft30
G Type Building Bung No 27,28,29,30,31,32,33,34,35,36Bungalow375.27 sq m · 4,039 sq ft10
G Type Building Bung No 27,28,29,30,31,32,33,34,35,36Bungalow376.87 sq m · 4,057 sq ft10
G Type Building Bung No 27,28,29,30,31,32,33,34,35,36Bungalow390.78 sq m · 4,206 sq ft10
G Type Building Bung No 27,28,29,30,31,32,33,34,35,36Bungalow392.02 sq m · 4,220 sq ft70

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 134 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardAMP pan card.pdf · uploaded 18 Mar 2023Source

Legal

  • Legal Title report1 Copy of the legal title report.pdf · uploaded 23 Mar 2023Source
  • Declaration Form Bform B_compressed.pdf · uploaded 24 Mar 2023Source

Migrated

  • 1 PAN CardAMP pan card.pdf · uploaded 18 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)1 of 13.pdf · uploaded 18 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1 of 13.pdf · uploaded 18 Mar 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2 of 13_compressed.pdf · uploaded 18 Mar 2023Source
Show all 135 documentsShow fewer documents

Migrated

  • 3 Building Plan Approval / NA Order for plotted development3 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 4 Building Plan Approval / NA Order for plotted development4 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 5 Building Plan Approval / NA Order for plotted development5 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 6 Building Plan Approval / NA Order for plotted development6 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 7 Building Plan Approval / NA Order for plotted development7 of 13.pdf · uploaded 18 Mar 2023Source
  • 8 Building Plan Approval / NA Order for plotted development8 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 9 Building Plan Approval / NA Order for plotted development9 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 10 Building Plan Approval / NA Order for plotted development10 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 11 Building Plan Approval / NA Order for plotted development11 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 12 Building Plan Approval / NA Order for plotted development12 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCIDCO COMMENCEMENT CERTIFICATE_0001_compressed.pdf · uploaded 18 Mar 2023Source
  • 1 Copy of the legal title report1 Copy of the legal title report.pdf · uploaded 23 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 23 Mar 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_FInal.pdf · uploaded 23 Mar 2023Source
  • 1 Proforma of Agreement for salerera agreement as per model form-36 greens-21-03-2023-2.pdf · uploaded 23 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementNo Deviation for ATS.pdf · uploaded 23 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceDECLARATION ENCUMBRANCES_0001.pdf · uploaded 24 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalDECLARATION ENCUMBRANCES_0001.pdf · uploaded 24 Mar 2023Source
  • 1 Declaration about Commencement Certificatecoomence ment DECLARATION ABOUT COMMENCEMENT CERTIFICATE_0001.pdf · uploaded 24 Mar 2023Source
  • 1 Declaration in FORM Bform B_compressed.pdf · uploaded 24 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate.pdf · uploaded 24 Mar 2023Source
  • 1 Proforma of Allotment letterAllotment letter 36 Greens.pdf · uploaded 24 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterNo Deviation Allotment Letter.pdf · uploaded 24 Mar 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form -3 C A CERTIFICATE 36 GREEN_sIGNED_compressed.pdf · uploaded 27 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A JAGRUTI AMIN disclsoure_0001.pdf · uploaded 27 Mar 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A BHAVEN AMIN disclosure _0001.pdf · uploaded 27 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDocScanner Mar 27, 2023 6-38 PM.pdf · uploaded 28 Mar 2023Source
  • 2 a Details of encumbrances concerned to FinanceNon Legal Encumbrance.pdf · uploaded 7 Apr 2023Source
  • 2 b Details of encumbrances concerned to LegalNon Legal Encumbrance.pdf · uploaded 7 Apr 2023Source
  • Form 5 (FY 2023-2024)23 24.pdf · uploaded 27 Jun 2026Source
  • Form 5 (FY 2024-2025)24 25.pdf · uploaded 27 Jun 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q2 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q3 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q4 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q2 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q3 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q4 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 25 26.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q2 25 26.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q1 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q4 23 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q3 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q4 24 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q1 25 26.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 25 26.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE JUN 23.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE SEP 23.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE DEC 23.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE MARCH 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE JUN 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE SEP 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE DEC 24.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE MARCH 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE JUN 25.pdf · uploaded 2 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE SEP 25.pdf · uploaded 2 Jul 2026Source
  • Form 1FORM 1 Q1 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q1 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE JUN 23.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ1 23.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q1 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q1 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE JUN 23.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ1 23.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q2 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q2 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE SEP 23.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ2 23.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q3 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q3 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE DEC 23.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ3 23.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ4 23.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q4 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q4 23 24.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE MARCH 24.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q2 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q2 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE JUN 24.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ2 24.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ3 24.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q3 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q3 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE DEC 24.pdf · uploaded 3 Jul 2026Source
  • Form 1FORM 1 Q4 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 2FORM 2 Q4 24 25.pdf · uploaded 3 Jul 2026Source
  • Form 3FORM 3 RERA CERTIFICATE MARCH 25.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryQ4 24.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 1FORM 1Q3 25 26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q3 25 26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 RERA CERTIFICATE DEC 25.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 1FORM 1Q3 25 26.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q4 25 26.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 3March 2026.pdf · uploaded 4 Jul 2026Source
  • Form 2A (FY 2023-2024)2023.pdf · uploaded 4 Jul 2026Source
  • Form 2A (FY 2024-2025)2024.pdf · uploaded 4 Jul 2026Source
  • Form 2A (FY 2025-2026)2025.pdf · uploaded 4 Jul 2026Source
  • Form 2A (FY 2026-2027)2026.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 26 27.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q1 26 27.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 3June 2026.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 26 27.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1FORM 1 Q1 26 27.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q1 26 27.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q1 26 27.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3June 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3June 2026.pdf · uploaded 8 Jul 2026Source

Technical

  • Document1 of 13.pdf · uploaded 18 Mar 2023Source
  • Document1 of 13.pdf · uploaded 18 Mar 2023Source
  • Document2 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document3 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document4 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document5 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document6 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document7 of 13.pdf · uploaded 18 Mar 2023Source
  • Document8 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document9 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document10 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document11 of 13_compressed.pdf · uploaded 18 Mar 2023Source
  • Document12 of 13_compressed.pdf · uploaded 18 Mar 2023Source

Technical (Architect)

  • DocumentFORM 1 Q1 26 27.pdf · uploaded 7 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 Q1 26 27.pdf · uploaded 7 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Quarterly progress report not filedMatched by RERA number

    Quarterly progress report not filed: 36 Greens

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Golwadi, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 16

Boundaries

North
Part Land 16
South
Part Land 16
East
Agricultural College Land
West
18 Mtrs Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManoj Kala—
ArchitectMr Manoj Kala—
ArchitectMr Shourya Patel—
Chartered accountantAbhijeet Patil—
Chartered accountantMr Abhijeet Patil—
EngineerMr Sujit Patare—
EngineerSainath Sukhdev Mhaske—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology