Akshad Super City Phase- II

Completed

Gangapur Jahagir, Aurangabad 431154 |Promoter: Vansh Infrastructure

Residential / Group HousingRERAP51500027259
28 Nov 2020Registered with MahaRERA
13 Apr 2025Promised completion
9Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
9
Land area for this project
3,587 sq m (38,615 sq ft)
Permissible built-up area
10,514 sq m (1,13,168 sq ft)
Sanctioned built-up area
10,514 sq m (1,13,168 sq ft)
Recreational open space
359 sq m (3,861 sq ft)
Planning authority
ASSISTANT DIRECTOR URBAN PLANNING
Address
Gut No 129, , Near Shendra Midc, Near Shendra MidcPIN 431154
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87312, 75.47801
Akshad Super City Phase- II is at latitude 19.87312, longitude 75.47801.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 13 Apr 2025

The latest completion date on record passed 1 year and 6 months ago.

Registered
28 Nov 2020
Promised
13 Apr 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002725928 Nov 202013 Apr 2025—Vansh InfrastructureProject page

9 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
D Block0—
E Block0—
F Block0—
G Block0—
H Block0—
I Block0—
J Block0—
K Block0—
N Block0—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
D BlockClosed/Covered00000
D BlockOpen Space00000
E BlockClosed/Covered00000
E BlockOpen Space00000
F BlockClosed/Covered00000
F BlockOpen Space00000
G BlockClosed/Covered00000
G BlockOpen Space00000
Show all 18 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
H BlockClosed/Covered00000
H BlockOpen Space00000
I BlockClosed/Covered00000
I BlockOpen Space00000
J BlockClosed/Covered00000
J BlockOpen Space00000
K BlockClosed/Covered00000
K BlockOpen Space00000
N BlockClosed/Covered00000
N BlockOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

D Block

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

E Block

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

F Block

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 10 buildings and common areasShow fewer buildings and common areas

G Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

H Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

I Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

J Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

K Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

N Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & Footpaths100%
  • Water SupplyTHROUGH BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBERS100%
  • Storm Water DrainsDRAINAGE LINESNot applicable
  • Landscaping & Tree PlantingSEPTIC TANK. NO STP100%
  • Street Lighting100%
Show all 16 activitiesShow fewer activities
  • Community BuildingsAS PER DRAWINGS OF CONSULTANTNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER DRAWINGS OF CONSULTANTNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWINGS OF CONSULTANT100%
  • Aggregate area of recreational Open Space530 SQ MTRS100%
  • Open ParkingNot applicable
  • COMPOUND WALL ENTRANCE GATEAS PER DRAWINGS OF CONSULTANT100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

53 documents held by Deedo, 58 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1 (13)

Show all 111 documentsShow fewer documents

Form 1 (13)

Form 2 (14)

Registration certificate

Other (16)

Allotment letter

Layout plan

Building plan (3)

Document library

  • Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 30 Oct 2020View
  • Details of encumbrancesCertificate of encumbrances.pdf · uploaded 30 Oct 2020View
  • Copy of Layout Approval (in case of layout)Building Lay-Out Plan_compressed.pdf · uploaded 30 Oct 2020View
  • Building Plan Approval / NA Order for plotted developmentRow House Plan_Compressed 1.pdf · uploaded 30 Oct 2020View
  • Building Plan Approval / NA Order for plotted developmentRow House Plan_Compressed 2.pdf · uploaded 30 Oct 2020View
  • Building Plan Approval / NA Order for plotted developmentRow House Plan_Compressed 3.pdf · uploaded 30 Oct 2020View
  • Commencement Certificates / NA Order for plotted developmentContruction Order NA _compressed.pdf · uploaded 30 Oct 2020View
  • Declaration in FORM BAffIdavit cum Declaration Form-B.pdf · uploaded 30 Oct 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate_Compressed.pdf · uploaded 30 Oct 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineeirs Certificate form 2 _compressed.pdf · uploaded 30 Oct 2020View
  • Proforma of Allotment letterALLOTMENT LETTER _ SALE DEED DRAFT.pdf · uploaded 30 Oct 2020View
  • Form 1Form 1 2020-21 Q4.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINNER CERTIFICATE 31-03-2021.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-3-21.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2022-23 Q1.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINNER CERTIFICATE 30-06-2022.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 30-6-22.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2022-23 Q2.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE -30-09-2022.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 30-9-22.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2022-23 Q3.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 31-12-2022.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-12-22.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2022-23 Q4.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 31-03-2023.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-3-23.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2023-24 Q1.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 30-06-2023.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-6-23.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2023-24 Q2.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 30-09-2023.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 30-9-23.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2023-24 Q3.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEERIN CERTIFICATE 31-12-2023.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-12-23.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2023-24 Q4.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 31-03-2024.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-3-24.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2024-25 Q1.pdf · uploaded 10 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 30-06-2024.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 30-6-24.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1 2024-25 Q2.pdf · uploaded 11 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 30-09-2024.pdf · uploaded 11 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 30-9-24.pdf · uploaded 11 Oct 2025View
  • Form 1Form 1 2024-25 Q3.pdf · uploaded 11 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 31-12-2024.pdf · uploaded 11 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-12-24.pdf · uploaded 11 Oct 2025View
  • Form 1Form 1 2024-25 Q4.pdf · uploaded 11 Oct 2025View
  • Form 2ENGINEER CERTIFICATE 31-03-2025.pdf · uploaded 11 Oct 2025View
  • Disclosure of Sold and Booked Inventorysold unsold 31-3-25.pdf · uploaded 11 Oct 2025View
  • Occupational CertificateGUT NO 129 O Certificate.pdf · uploaded 6 Nov 2025View

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 30 Oct 2020View
  • Declaration Form BAffIdavit cum Declaration Form-B.pdf · uploaded 30 Oct 2020View

Technical documents

  • Layout ApprovalBuilding Lay-Out Plan_compressed.pdfView
  • Building Plan ApprovalRow House Plan_Compressed 1.pdfView
  • Building Plan ApprovalRow House Plan_Compressed 2.pdfView
  • Building Plan ApprovalRow House Plan_Compressed 3.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER _ SALE DEED DRAFT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Gangapur Jahagir, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 129GUT NO 129

As published on MahaRERA's project page

GUT NO 129,

Boundaries

North
Remaining Land Gut No 129
South
Gut No 130
East
Nala
West
Gairan

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPeeyush Bhavsar—
Chartered accountantCA Gopal S Malpani—
Chartered accountantEkta Saurabh Zanzari—
Chartered accountantPraveen Bangad—
EngineerMr. Izhar Ahmad—
OtherM/s. S. G. Devidan—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology