Yashraj Angan

Completed

Aurangabad (M Corp.), Aurangabad 431007 |Promoter: Rutuja Developers

Residential / Group HousingRERAP51500014780
2 Jan 2018Registered with MahaRERA
25 Dec 2021Promised completion
5Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
5
Land area for this project
5,100 sq m (54,896 sq ft)
Permissible built-up area
3,658 sq m (39,370 sq ft)
Sanctioned built-up area
3,658 sq m (39,370 sq ft)
Recreational open space
510 sq m (5,490 sq ft)
Address
GUT NO. 175 at Village Savangi, GUT NO 175, SAVANGIPIN 431007
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.11170, 79.07298
Yashraj Angan is at latitude 21.11170, longitude 79.07298.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 25 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
2 Jan 2018
Promised
25 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000147802 Jan 201825 Dec 2021—Rutuja DevelopersProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building-A2—
Building-B2—
Building-C2—
Building-D2—
Building-E6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building-AClosed/Covered00000
Building-AOpen Space00000
Building-BClosed/Covered00000
Building-BOpen Space00000
Building-CClosed/Covered00000
Building-COpen Space00000
Building-DClosed/Covered00000
Building-DOpen Space00000
Building-EClosed/Covered00001
Building-EOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building-A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building-B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building-C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 6 buildings and common areasShow fewer buildings and common areas

Building-D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building-E

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsCONCRETE10%
  • Water SupplyWELL50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingOPEN SPACE10%
  • Street LightingYET TO COMPLETE0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingUPTO WELL10%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationDP PROVIDED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title report

Form B

Commencement certificate

Form 5 (2)

Form 4 (2)

Occupancy / completion certificate (2)

  • Occupancy / completion certificate23 Jan 2020ViewSource
Show all 37 documentsShow fewer documents

Occupancy / completion certificate (2)

  • Occupancy / completion certificate29 Apr 2023ViewSource

Registration certificate

Other (4)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)Layout_Approval_Yashrajangan.pdf · uploaded 26 Dec 2017View
  • Copy of the legal title reportTitle Search Report_Resize.pdf · uploaded 26 Dec 2017View
  • Details of encumbrancesTitle Search Report_Resize.pdf · uploaded 26 Dec 2017View
  • Declaration in FORM BForm B_Promoter.pdf · uploaded 26 Dec 2017View
  • Building Plan Approval (IOD)Building Paln Approval.pdf · uploaded 26 Dec 2017View
  • Proforma of Allotment letterAllotLette_AtoS.pdf · uploaded 26 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencementCertificate_YashrajAngan_RutujaDe.pdf · uploaded 11 Apr 2018View
  • OtherNAOrder_YashrajAngan_RutujaDev.pdf · uploaded 11 Apr 2018View
  • Certificates of CA (Form 5)RERA_AR_YashrajAngan_1718_RutujaDev.pdf · uploaded 13 Oct 2018View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4.pdf · uploaded 30 Sep 2019View
  • Certificates of CA (Form 5)FORM5.pdf · uploaded 30 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate_YashrajAngan.pdf · uploaded 23 Jan 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Form4_YashrajAngan_Rutuja'Dev.pdf · uploaded 23 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancyC_YashrajAngan_Rutuja'Dev.pdf · uploaded 29 Apr 2023View

Promoter documents

  • Legal Title reportTitle Search Report_Resize.pdf · uploaded 26 Dec 2017View
  • Declaration Form BForm B_Promoter.pdf · uploaded 26 Dec 2017View

Technical documents

  • Layout ApprovalLayout_Approval_Yashrajangan.pdfView
  • Building Plan ApprovalBuilding Paln Approval.pdfView

Other legal documents

  • OtherNAOrder_YashrajAngan_RutujaDev.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotLette_AtoS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO. 175 at

As published on MahaRERA's project page

GUT NO. 175 at Village Savangi

Boundaries

North
Land Of Ramrao Sarjerao Jagdale
South
Land Of Ramnath Laxman Jagdale
East
GOVERMENT LAND Of GUT NO 175
West
Road Of Savangi Form Savangi Bypass

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay Babasaheb Doifode—
EngineerA S Patil—
OtherDwarkadas Appa Vyawhare—
OtherKailash Dagduba Mete—
OtherKondiram Bhagwan Khandare—
OtherNamdev Eknath Rathod—
OtherNaryan Ambadas Kharat—
OtherSantosh Anantrao Raut—
OtherSheru Nizam Shaha—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology