Gursahani Twin Tower

Completed

Aurangabad (M Corp.), Aurangabad 431003 |Promoter: Shree Hinglajmata Constructions

19 Dec 2022Registered with MahaRERA
6 Oct 2024Promised completion
5 Oct 2026Revised completionPushed back 2 years
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,257 sq m (13,532 sq ft)
Permissible built-up area
3,435 sq m (36,973 sq ft)
Sanctioned built-up area
3,435 sq m (36,973 sq ft)
Planning authority
CHHATRAPATI SAMBHAJINAGAR MUNICIPAL CORPORATION
Address
138, Plot No. 138, Survey No. 15, N4 CidcoPIN 431003
Designated bank account
Saraswat Cooperative Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87617, 75.34331
Gursahani Twin Tower is at latitude 19.87617, longitude 75.34331.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

Registered
19 Dec 2022
Promised
6 Oct 2024
Revised
5 Oct 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150004823919 Dec 20226 Oct 20245 Oct 2026Shree Hinglajmata ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Gursahani Twin Towers9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotalAllotted 2WAllotted 4W
Closed/Covered101340413910034
Open Space0000000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Gursahani Twin Towers

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyThrough Municipal Corporation Connection0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AMC Chamber Line100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per details Obtained from consultant100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per details from Consultant/Firm NOC100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

59 documents held by Deedo, 61 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title reportLegal Title Report_compressed (2).pdf · uploaded 4 Oct 2022View
  • a Details of encumbrances concerned to FinanceE Finance.pdf · uploaded 4 Oct 2022View
  • b Details of encumbrances concerned to LegalE Legal.pdf · uploaded 4 Oct 2022View
  • Copy of Layout Approval (in case of layout)Merged Building Plan compressed _compressed.pdf · uploaded 4 Oct 2022View
  • Building Plan Approval / NA Order for plotted developmentMerged Building Plan compressed _compressed.pdf · uploaded 4 Oct 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 4 Oct 2022View
  • Declaration about Commencement CertificateDecleration About Commencement Format D.pdf · uploaded 4 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 4 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 4 Oct 2022View
  • CERSAI detailsCERSAI_Search_Report.pdf · uploaded 4 Oct 2022View
  • Declaration in FORM BForm B.pdf · uploaded 6 Oct 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Encumberance Revised Shree.pdf · uploaded 14 Oct 2022View
  • Deviation Report with respect to Allotment letterDeviation AL.pdf · uploaded 19 Nov 2022View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 19 Nov 2022View
  • Deviation Report with respect to model copy of AgreementHinglajmata No Deviation.pdf · uploaded 12 Dec 2022View
  • Proforma of Agreement for saleRERA Agreement copy .pdf · uploaded 12 Dec 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 17 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 17 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)11.pdf · uploaded 22 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)22.pdf · uploaded 22 Jul 2023View
  • Disclosure of sold/ booked inventory33.pdf · uploaded 22 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23 SIGN.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 .pdf · uploaded 22 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 5 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 5 Aug 2024View
  • Form 5 (FY 2022-2023)Form 5 22 -23 .pdf · uploaded 23 Sep 2024View
  • Form 5 (FY 2023-2024)Form 5 23-24 .pdf · uploaded 23 Sep 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 7 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 7 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 25 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 25 Apr 2025View
  • Form 1Form 1.pdf · uploaded 19 Jul 2025View
  • Form 2Form 2.pdf · uploaded 19 Jul 2025View
  • Disclosure of Sold and Booked InventoryDeclaration.pdf · uploaded 19 Jul 2025View
  • Form 1Form 1.pdf · uploaded 15 Oct 2025View
  • Form 2Form 2.pdf · uploaded 15 Oct 2025View
  • Disclosure of Sold and Booked InventoryForm 3.pdf · uploaded 15 Oct 2025View
  • Form 5 (FY 2024-2025)Hinglajmata Form 5 24-25.pdf · uploaded 28 Oct 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 23 Dec 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 23 Dec 2025View
  • Withdrawal Update Form 1Form 1_merged.pdf · uploaded 2 Feb 2026View
  • Withdrawal Update Form 2Form 2_merged.pdf · uploaded 2 Feb 2026View
  • Occupational CertificateOC.pdf · uploaded 13 Feb 2026View
  • Occupational CertificateOC Plan.pdf · uploaded 13 Feb 2026View
  • Occupational CertificateForm 4.pdf · uploaded 13 Feb 2026View
  • Occupational CertificateRejection Note.pdf · uploaded 13 Feb 2026View
  • Occupational CertificateGmail - 110 03 SANTION OC POROPSAL 29122025.pdf · uploaded 4 Mar 2026View

Promoter documents

  • Legal Title reportLegal Title Report_compressed (2).pdf · uploaded 4 Oct 2022View
  • Declaration Form BForm B.pdf · uploaded 6 Oct 2022View

Technical documents

  • Layout ApprovalMerged Building Plan compressed _compressed.pdfView
  • Building Plan ApprovalMerged Building Plan compressed _compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

138

As published on MahaRERA's project page

138

Boundaries

North
Plot No 137
South
24 m Wide Road
East
11 m Wide Road
West
Survey No 16

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJadhav RS—
ArchitectRajaram Sahebrao Jadhav—
Chartered accountantAshok Patil & Associates—
Chartered accountantShrikant Thorat—
Chartered accountantShrikant Thorat—
Chartered accountant——
EngineerDevendra A Deshpande—
EngineerNamdeo Govind Karkhane—
EngineerNamdeo Govind Karkhane—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology