IDBLD_0104302 floorsPromised date passed
2Sanctioned habitable floorsregistration certificate
30 Mar 2024Promised completion
Floors
2 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 2
Registered transactions
No registered transactions placed in this tower yetDeeds land here when they name this tower; the project page lists the rest.
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| SHOP 1 | 13.5 m² (145 sq.ft) | 18 | not published |
| SHOP 2 | 12.8 m² (138 sq.ft) | 2 | not published |
| SHOP 3 | 15.1 m² (163 sq.ft) | 4 | not published |
| SHOP 4 | 15.4 m² (166 sq.ft) | 2 | not published |
| SHOP 5 | 16.9 m² (182 sq.ft) | 2 | not published |
| SHOP 6 | 16.6 m² (179 sq.ft) | 2 | not published |
| SHOP 7 | 16.3 m² (175 sq.ft) | 2 | not published |
| SHOP 8 | 13.3 m² (143 sq.ft) | 14 | not published |
| Total | 46 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 14 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth0%
- Stilt Floor0%
- Slabs of Super Structure0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
- Sanitary Fittings within the flats / premises0%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through10 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology