Govind Tower

Completed

Nandgaon Peth, Amravati 444901 |Promoter: Suresh Govindramji Malviya

29 Mar 2019Registered with MahaRERA
30 Mar 2023Promised completion
1Building
52Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Flat, Shop52 units in all
Land area for this project
1,790 sq m (19,263 sq ft)
Permissible built-up area
2,627 sq m (28,276 sq ft)
Sanctioned built-up area
2,577 sq m (27,738 sq ft)
Address
74/5, Nagpur Road, Mouje KathoraPIN 444901
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Govind Tower is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
29 Mar 2019
Promised
30 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002019529 Mar 201930 Mar 2023—Suresh Govindramji MalviyaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Govind Tower552

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

52 units registered

Flat · 28 unitsShop · 24 units
TypeCarpet areaUnits
Flat56.3 sq m · 606 sq ft20
Flat57.2 sq m · 616 sq ft8
Shop12.61 sq m · 136 sq ft4
Shop12.71 sq m · 137 sq ft4
Shop12.82 sq m · 138 sq ft4
Shop17.41 sq m · 187 sq ft4
Shop17.57 sq m · 189 sq ft4
Shop17.72 sq m · 191 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered0000111
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Govind Tower

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAs Per Map0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As Per Map100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs Per Map0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title

Commencement certificate

Encumbrance

Form b

Form 2

Form 2a

Form 5s

Completion

Registration certificate

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 23 Mar 2019View
  • Copy of Layout Approval (in case of layout)layout Approval.pdf · uploaded 23 Mar 2019View
  • Building Plan Approval (IOD)Building Map.pdf · uploaded 23 Mar 2019View
  • Commencement Certificates / NA Order for plotted developmentSanction Letter.pdf · uploaded 23 Mar 2019View
  • Details of encumbrancesNon Encumbrance.pdf · uploaded 27 Mar 2019View
  • Declaration in FORM Bform B_compressed.pdf · uploaded 27 Mar 2019View
  • Proforma of Allotment letterundertaking.pdf · uploaded 27 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer.pdf · uploaded 27 Mar 2019View
  • Engineers Certificate on Quality Assurance (Form 2A)Malviya form 2A_compressed.pdf · uploaded 16 Aug 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Rera Audit 2018-19.pdf · uploaded 19 May 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Rera Audit 2019-20.pdf · uploaded 19 May 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Rera Audit 2020-21.pdf · uploaded 19 May 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOc malviya.pdf · uploaded 2 Aug 2021View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 23 Mar 2019View
  • Declaration Form Bform B_compressed.pdf · uploaded 27 Mar 2019View

Technical documents

  • Layout Approvallayout Approval.pdfView
  • Building Plan ApprovalBuilding Map.pdfView

Proforma allotment letter

  • Proforma allotment letterundertaking.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nandgaon peth, Amravati taluka

Survey, CTS, gat or plot numbers

74/5

As published on MahaRERA's project page

74/5

Boundaries

North
Feild Survey No 74
South
Plot No 2
East
30 PLUS 12 meter wide road
West
Other Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Farkade—
Chartered accountantCA Nidhi Agrawal—
Chartered accountantCA Sanchita Rathi—
EngineerSagar Wankhade—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology