Skip to content
Deedo home
Menu

Gautam Nagar Phase 1 Building Nos. 6 and 7

Deregistration on record

Nandgaon Peth, Amravati 444901 |Promoter: J K Investors (Bombay) Limited

Residential / Group HousingRERAP50300022691
12 Oct 2019Registered with MahaRERA
1 Jun 2023Promised completion
2Buildings
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
De-Registered
Buildings
2
Land area for this project
1,009 sq m (10,861 sq ft)
Permissible built-up area
3,459 sq m (37,235 sq ft)
Sanctioned built-up area
3,459 sq m (37,235 sq ft)
Address
R 16 and R 17, MIDC Road, M.I.D.C Additional Amravati Industrial Area Mouje Nadgaon Peth.PIN 444901
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Gautam Nagar Phase 1 Building Nos. 6 and 7 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
12 Oct 2019
Promised
1 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002269112 Oct 20191 Jun 2023—J K Investors (Bombay) LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building No 65—
Building No 75—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building No 6Closed/Covered00000
Building No 6Open Space00000
Building No 7Closed/Covered00000
Building No 7Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building No 6

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building No 7

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER PLAN0%
  • Water SupplyAS PER PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Storm Water DrainsAS PER PLAN0%
  • Landscaping & Tree PlantingAS PER PLAN0%
  • Street LightingAS PER REQUIRMENT0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER PLAN0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER FIRE NOC0%
  • Electrical meter room, sub-station, receiving stationAS PER PLAN0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 35 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificate

Form b

Form 1s

Form 2

Allotment letters

Registration certificate

Others

Form 5s

Layout plan

Building plans

Document library

  • Copy of the legal title reportTitle report R-16_compressed.pdf · uploaded 26 Sep 2019View
  • Copy of the legal title reportTitle report R-17_compressed.pdf · uploaded 26 Sep 2019View
  • Details of encumbrancesEncumbrance certificate.pdf · uploaded 26 Sep 2019View
  • Commencement Certificates / NA Order for plotted developmentCC LETTER.pdf · uploaded 26 Sep 2019View
  • Declaration in FORM Bform B Notarized.pdf · uploaded 26 Sep 2019View
  • Proforma of Allotment letterUndertaking.pdf · uploaded 26 Sep 2019View
  • OtherBoard resolution.pdf · uploaded 26 Sep 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 27 Sep 2019View
  • Building Plan Approval / NA Order for plotted developmentBUILDING 6.pdf · uploaded 27 Sep 2019View
  • Building Plan Approval / NA Order for plotted developmentBUILDING 7.pdf · uploaded 27 Sep 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architectural certificate.pdf · uploaded 27 Sep 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 1-Engineer Certificate_compressed.pdf · uploaded 27 Sep 2019View
  • Building Plan Approval / NA Order for plotted developmentPAGE TWO .pdf · uploaded 28 Sep 2019View
  • OtherR16,R17,HOUSING--AMALGAMATION LETTER.pdf · uploaded 28 Sep 2019View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 8 Oct 2019View
  • Proforma of Allotment letterUndertaking.pdf · uploaded 8 Oct 2019View
  • Disclosure of sold/ booked inventoryInventory disclosure_compressed.pdf · uploaded 29 Sep 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERT 3132020.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERT 31321.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERT31322.pdf · uploaded 18 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RERA CERT 3132020.pdf · uploaded 22 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA CERT 31321.pdf · uploaded 22 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA CERT31322.pdf · uploaded 22 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)JKIB_2019-20.pdf · uploaded 11 Nov 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)JKIB_2020-21.pdf · uploaded 11 Nov 2024View

Promoter documents

  • Legal Title reportTitle report R-16_compressed.pdf · uploaded 26 Sep 2019View
  • Legal Title reportTitle report R-17_compressed.pdf · uploaded 26 Sep 2019View
  • Declaration Form Bform B Notarized.pdf · uploaded 26 Sep 2019View

Technical documents

  • Building Plan ApprovalPAGE TWO .pdfView
  • Layout ApprovalLAYOUT.pdfView
  • Building Plan ApprovalBUILDING 6.pdfView
  • Building Plan ApprovalBUILDING 7.pdfView

Other legal documents

  • OtherR16,R17,HOUSING--AMALGAMATION LETTER.pdfView
  • OtherBoard resolution.pdfView

Proforma allotment letter

  • Proforma allotment letterUndertaking.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nandgaon peth, Amravati taluka

Survey, CTS, gat or plot numbers

R 16R 17

As published on MahaRERA's project page

R 16 and R 17

Boundaries

North
20 Mtr Road
South
Amenity P 11
East
Remaining Plot of R 16 and R 17
West
20 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDesigno Architects—
EngineerEr Ketan Kalmegh—
OtherRishabh Khandelwal—
OtherStructural Concept Designs Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology