Badnera, Amravati 444701 |Promoter: Raj Associates

Residential / Group HousingRERAP50300022183
5 Sep 2019Registered with MahaRERA
21 Nov 2022Promised completion
31 Dec 2028Revised completionPushed back 6 years and 1 month
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
5,241 sq m (56,412 sq ft)
Permissible built-up area
5,241 sq m (56,412 sq ft)
Sanctioned built-up area
5,241 sq m (56,412 sq ft)
Recreational open space
1,854 sq m (19,955 sq ft)
Planning authority
Amravati Municipal Corporation
Address
159/1, 159/2, 160, 162, 164/2, Main Railway Station Road, Old Town, BadneraPIN 444701
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.86283, 77.12979
Raj Township is at latitude 20.86283, longitude 77.12979.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 years and 1 month

Registered
5 Sep 2019
Promised
21 Nov 2022
Revised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000221835 Sep 201921 Nov 202231 Dec 2028Raj AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pearl9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered01001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pearl

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Common areas and amenities

  • Internal Roads & FootpathsWIP50%
  • Water SupplyWIP MUNICIPAL CORPORATION10%
  • Sewerage (Chamber, Lines, Septic Tank , STP)YET TO START0%
  • Storm Water DrainsYET TO START0%
  • Landscaping & Tree PlantingWIP30%
  • Street LightingWIP50%
  • Community BuildingsCOMPLETED100%
  • Treatment And Disposal Of Sewage And Sullage WaterYET TO START0%
  • Solid Waste Management And DisposalYET TO START0%
  • Water conservation /Rain water harvestingYET TO START0%
  • Energy managemcntYET TO START0%
  • Fire protection and fire safety requirementsYET TO START0%
  • Electrical meter room, sub-station, receiving stationWIP15%
  • Aggregate area of recreational Open SpaceCOMPLETED100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

65 documents held by Deedo, 159 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form bs

Others

Registration certificate

Form 1s

Form 2as

Completion

Form 2s

Form 5s

Extension certificate

Layout plan

Building plan

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)Lay Out Plan_opt_opt.pdf · uploaded 10 Jul 2019View
  • Declaration in FORM BFORMB.pdf · uploaded 10 Jul 2019View
  • Building Plan Approval (IOD)Pear-Structure Plan_001.pdf · uploaded 10 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate NEW_opt.pdf · uploaded 10 Jul 2019View
  • Details of encumbrancesNON ECU.pdf · uploaded 10 Jul 2019View
  • Copy of the legal title reportTITLE REPORT PDF.pdf · uploaded 10 Jul 2019View
  • Proforma of Allotment letterSALE AGREEMENT FORMAT.pdf · uploaded 23 Aug 2019View
  • OtherForm B (1)_compressed.pdf · uploaded 23 Aug 2019View
  • Disclosure of sold/ booked inventorySold -Booked Inventory.pdf · uploaded 14 Aug 2021View
  • OtherFINAL SOLD AND UNSOLD.pdf · uploaded 24 Jan 2023View
  • Otherform 1.pdf · uploaded 24 Jan 2023View
  • Otherform2.pdf · uploaded 24 Jan 2023View
  • OtherForm2A.pdf · uploaded 24 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGG.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 ARCH.pdf · uploaded 20 Oct 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPearl Part OC.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH FORM-1.pdf · uploaded 3 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG FORM-2.pdf · uploaded 3 Feb 2024View
  • Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 3 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RAJ ARCH FORM-1.pdf · uploaded 15 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Raj ENGG FORM-2.pdf · uploaded 15 May 2024View
  • Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 15 May 2024View
  • Declaration in FORM BAdobe Scan Aug 13, 2024 (2) (2).pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q123.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q223.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q323.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q423.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q124.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q224.pdf · uploaded 14 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q324.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q223.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q323.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q123.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q224.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q124.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q423.pdf · uploaded 14 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q324.pdf · uploaded 14 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - Engineer Raj Township 1920.pdf · uploaded 14 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - Engineer Raj Township 2021.pdf · uploaded 14 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - Engineer Raj Township 2122.pdf · uploaded 14 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Engineer Raj Township 2223.pdf · uploaded 14 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Engineer Raj Township 2324.pdf · uploaded 14 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-20.pdf · uploaded 17 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-21.pdf · uploaded 17 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22.pdf · uploaded 17 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 17 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-24.pdf · uploaded 17 Oct 2024View
  • Form 2A (FY 2019-2020)Form 2A 1920.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2019-2020)Form 5 1920.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2020-2021)Form 2A 2021.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2020-2021)Form 5 2021.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2021-2022)Form 2A 2122.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2022-2023)Form 2A 2223.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2021-2022)Form 5 2122.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2023-2024)Form 2A 2324.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2024-2025)Form 2A 2425.pdf · uploaded 4 Sep 2026View
  • Form 2A (FY 2025-2026)Form 2A 2526.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2022-2023)Form 5 2223.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2023-2024)Form 5 2324.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
  • Form 2Form 2.pdf · uploaded 4 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2024-2025)Form 5 2425.pdf · uploaded 4 Sep 2026View
  • Form 5 (FY 2025-2026)Form 5 2526.pdf · uploaded 4 Sep 2026View

Promoter documents

  • Declaration Form BFORMB.pdf · uploaded 10 Jul 2019View
  • Legal Title reportTITLE REPORT PDF.pdf · uploaded 10 Jul 2019View
  • Declaration Form BAdobe Scan Aug 13, 2024 (2) (2).pdf · uploaded 14 Oct 2024View

Technical documents

  • Layout ApprovalLay Out Plan_opt_opt.pdfView
  • Building Plan ApprovalPear-Structure Plan_001.pdfView

Other legal documents

  • OtherForm B (1)_compressed.pdfView
  • OtherFINAL SOLD AND UNSOLD.pdfView
  • Otherform 1.pdfView
  • Otherform2.pdfView
  • OtherForm2A.pdfView

Proforma allotment letter

  • Proforma allotment letterSALE AGREEMENT FORMAT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Badnera, Amravati taluka

Survey, CTS, gat or plot numbers

159/1159/2160162164/2

As published on MahaRERA's project page

159/1, 159/2, 160, 162, 164/2

Boundaries

North
Sanctioned Layout Of Shri Mavade
South
Farm Of Shri Gn Rana
East
30m Wide Road
West
Farm Of Shri Walke

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKhurshid Hussain Munshi—
ArchitectSanjay Nagpure & Associates—
Chartered accountantM Hussain & Co—
Chartered accountantSanawadwala & Associates—
EngineerPankaj Subhashrao Deshmukh—
EngineerSanjay Nagpure & Associates—
OtherAxis Consultant—
OtherSanawadwala & Associates—
OtherYunus Ibrahim Ali—

Source: MahaRERA project page. Contact details are not shown.