Raj Township
ActiveBadnera, Amravati 444701 |Promoter: Raj Associates
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 1
- Land area for this project
- 5,241 sq m (56,412 sq ft)
- Permissible built-up area
- 5,241 sq m (56,412 sq ft)
- Sanctioned built-up area
- 5,241 sq m (56,412 sq ft)
- Recreational open space
- 1,854 sq m (19,955 sq ft)
- Planning authority
- Amravati Municipal Corporation
- Address
- 159/1, 159/2, 160, 162, 164/2, Main Railway Station Road, Old Town, BadneraPIN 444701
- Designated bank account
- Hdfc Bank
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 6 years and 1 month
- Registered
- 5 Sep 2019
- Promised
- 21 Nov 2022
- Revised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50300022183 | 5 Sep 2019 | 21 Nov 2022 | 31 Dec 2028 | Raj Associates | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Pearl | 9 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 1 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Pearl
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
65 documents held by Deedo, 159 filings listed on MahaRERA's project page
Others
- Other14 Aug 2021ViewSource
- Other4 Sep 2026ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Form 1s
- Form 120 Oct 2023ViewSource
- Form 13 Feb 2024ViewSource
- Form 115 May 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 114 Oct 2024ViewSource
- Form 14 Sep 2026ViewSource
Form 2as
- Form 2a20 Oct 2023ViewSource
- Form 2a14 Oct 2024ViewSource
- Form 2a14 Oct 2024ViewSource
- Form 2a14 Oct 2024ViewSource
- Form 2a14 Oct 2024ViewSource
- Form 2a14 Oct 2024ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
- Form 2a4 Sep 2026ViewSource
Form 2s
Form 5s
Document library
- Copy of Layout Approval (in case of layout)Lay Out Plan_opt_opt.pdf · uploaded 10 Jul 2019View
- Declaration in FORM BFORMB.pdf · uploaded 10 Jul 2019View
- Building Plan Approval (IOD)Pear-Structure Plan_001.pdf · uploaded 10 Jul 2019View
- Commencement Certificates / NA Order for plotted developmentCommencement Certificate NEW_opt.pdf · uploaded 10 Jul 2019View
- Details of encumbrancesNON ECU.pdf · uploaded 10 Jul 2019View
- Copy of the legal title reportTITLE REPORT PDF.pdf · uploaded 10 Jul 2019View
- Proforma of Allotment letterSALE AGREEMENT FORMAT.pdf · uploaded 23 Aug 2019View
- OtherForm B (1)_compressed.pdf · uploaded 23 Aug 2019View
- Disclosure of sold/ booked inventorySold -Booked Inventory.pdf · uploaded 14 Aug 2021View
- OtherFINAL SOLD AND UNSOLD.pdf · uploaded 24 Jan 2023View
- Otherform 1.pdf · uploaded 24 Jan 2023View
- Otherform2.pdf · uploaded 24 Jan 2023View
- OtherForm2A.pdf · uploaded 24 Jan 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGG.pdf · uploaded 20 Oct 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 ARCH.pdf · uploaded 20 Oct 2023View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPearl Part OC.pdf · uploaded 20 Oct 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH FORM-1.pdf · uploaded 3 Feb 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG FORM-2.pdf · uploaded 3 Feb 2024View
- Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 3 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)RAJ ARCH FORM-1.pdf · uploaded 15 May 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Raj ENGG FORM-2.pdf · uploaded 15 May 2024View
- Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 15 May 2024View
- Declaration in FORM BAdobe Scan Aug 13, 2024 (2) (2).pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q123.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q223.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q323.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q423.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q124.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q224.pdf · uploaded 14 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Raj Associates Q324.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q223.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q323.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q123.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q224.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q124.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q423.pdf · uploaded 14 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Raj Township Q324.pdf · uploaded 14 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - Engineer Raj Township 1920.pdf · uploaded 14 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - Engineer Raj Township 2021.pdf · uploaded 14 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - Engineer Raj Township 2122.pdf · uploaded 14 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Engineer Raj Township 2223.pdf · uploaded 14 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Engineer Raj Township 2324.pdf · uploaded 14 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-20.pdf · uploaded 17 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-21.pdf · uploaded 17 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22.pdf · uploaded 17 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 17 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-24.pdf · uploaded 17 Oct 2024View
- Form 2A (FY 2019-2020)Form 2A 1920.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2019-2020)Form 5 1920.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2020-2021)Form 2A 2021.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2020-2021)Form 5 2021.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2021-2022)Form 2A 2122.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2022-2023)Form 2A 2223.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2021-2022)Form 5 2122.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2023-2024)Form 2A 2324.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2024-2025)Form 2A 2425.pdf · uploaded 4 Sep 2026View
- Form 2A (FY 2025-2026)Form 2A 2526.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2022-2023)Form 5 2223.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2023-2024)Form 5 2324.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 1Form 1 (1).pdf · uploaded 4 Sep 2026View
- Form 2Form 2.pdf · uploaded 4 Sep 2026View
- Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2024-2025)Form 5 2425.pdf · uploaded 4 Sep 2026View
- Form 5 (FY 2025-2026)Form 5 2526.pdf · uploaded 4 Sep 2026View
Promoter documents
Technical documents
Other legal documents
Proforma allotment letter
- Proforma allotment letterSALE AGREEMENT FORMAT.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Badnera, Amravati taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
159/1, 159/2, 160, 162, 164/2
Boundaries
- North
- Sanctioned Layout Of Shri Mavade
- South
- Farm Of Shri Gn Rana
- East
- 30m Wide Road
- West
- Farm Of Shri Walke
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Khurshid Hussain Munshi | — |
| Architect | Sanjay Nagpure & Associates | — |
| Chartered accountant | M Hussain & Co | — |
| Chartered accountant | Sanawadwala & Associates | — |
| Engineer | Pankaj Subhashrao Deshmukh | — |
| Engineer | Sanjay Nagpure & Associates | — |
| Other | Axis Consultant | — |
| Other | Sanawadwala & Associates | — |
| Other | Yunus Ibrahim Ali | — |
Source: MahaRERA project page. Contact details are not shown.