255 EWS Ts at Shivni,Akola

Lapsed

Shivani (Ct), Akola 444104 |Promoter: Amravati Housing And Area Development Board

Residential / Group HousingRERAP50100018531
12 Nov 2018Registered with MahaRERA
30 Dec 2022Promised completion
9Buildings
255Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
9
Unit types
1 BHK255 units in all
Land area for this project
45,300 sq m (4,87,605 sq ft)
Permissible built-up area
7,688 sq m (82,756 sq ft)
Sanctioned built-up area
7,688 sq m (82,756 sq ft)
Recreational open space
4,281 sq m (46,085 sq ft)
Address
93/3, 93/3B, 94/1, 100/1, Akola Balapur Byepass, ShivaniPIN 444104
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.68020, 77.04890
255 EWS Ts at Shivni,Akola is at latitude 20.68020, longitude 77.04890.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
12 Nov 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010001853112 Nov 201830 Dec 2022—Amravati Housing And Area Development BoardProject page

9 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A1428
A2428
A3428
A4428
A5428
A6428
B1429
B2429
B3429

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

255 units registered

1 BHK · 255 units
BuildingTypeCarpet areaUnits
A11 BHK26.89 sq m · 289 sq ft28
A21 BHK26.89 sq m · 289 sq ft28
A31 BHK26.89 sq m · 289 sq ft28
A41 BHK26.89 sq m · 289 sq ft28
A51 BHK26.89 sq m · 289 sq ft28
A61 BHK26.89 sq m · 289 sq ft28
B11 BHK26.89 sq m · 289 sq ft29
B21 BHK26.89 sq m · 289 sq ft29
B31 BHK26.89 sq m · 289 sq ft29

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered00000
A1Open Space00001
A2Closed/Covered00000
A2Open Space00001
A3Closed/Covered00000
A3Open Space00001
A4Closed/Covered00000
A4Open Space00001
A5Closed/Covered00000
A5Open Space00001
A6Closed/Covered00000
A6Open Space00001
B1Closed/Covered00000
B1Open Space00001
B2Closed/Covered00000
B2Open Space00001
B3Closed/Covered00000
B3Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCOMPLETED100%
  • Internal Roads & FootpathsCOMPLETED100%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceCOMPLETED100%
  • Open ParkingCOMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 25 filings listed on MahaRERA's project page

Commencement certificate

Form b

Titles

Form 5s

Completion

Registration certificate

Other

Building plans

Allotment letter

Layout plan

Document library

  • Details of encumbrancesNon Encumbrance Certificate.pdf · uploaded 15 Oct 2018Source
  • Proforma of Allotment letterEM Gala vatap patra.pdf · uploaded 15 Oct 2018View
  • Declaration in FORM BAffidavit Shivani.pdf · uploaded 15 Oct 2018View
  • Commencement Certificates / NA Order for plotted developmentMHADA-Commenment_ Cert_for Building.pdf · uploaded 15 Oct 2018View
  • Copy of the legal title reportLegal title S No 93 3B part 1.pdf · uploaded 16 Oct 2018View
  • Copy of the legal title reportLegal title 93 3B part 2.pdf · uploaded 16 Oct 2018View
  • Copy of the legal title reportcompressed 93 3.pdf · uploaded 16 Oct 2018View
  • Copy of the legal title reportcompressed 94 1.pdf · uploaded 16 Oct 2018View
  • Copy of the legal title reportcompressed_100.pdf · uploaded 16 Oct 2018View
  • Building Plan Approval (IOD)MHADA_Sanction Sheet 02-1 .pdf · uploaded 17 Oct 2018View
  • Building Plan Approval (IOD)MHADA_Sanction Sheet 01.pdf · uploaded 17 Oct 2018View
  • Copy of Layout Approval (in case of layout)MHADA_Sanction layout-1.pdf · uploaded 17 Oct 2018View
  • Certificates of CA (Form 5)Shivani Form 5.pdf · uploaded 25 Jan 2019View
  • Certificates of CA (Form 5)Shivani.pdf · uploaded 20 Jun 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentDocument1.pdf · uploaded 7 Apr 2021View

Promoter documents

  • Declaration Form BAffidavit Shivani.pdf · uploaded 15 Oct 2018View
  • Legal Title reportLegal title S No 93 3B part 1.pdf · uploaded 16 Oct 2018View
  • Legal Title reportLegal title 93 3B part 2.pdf · uploaded 16 Oct 2018View
  • Legal Title reportcompressed 93 3.pdf · uploaded 16 Oct 2018View
  • Legal Title reportcompressed 94 1.pdf · uploaded 16 Oct 2018View
  • Legal Title reportcompressed_100.pdf · uploaded 16 Oct 2018View

Technical documents

  • Building Plan ApprovalMHADA_Sanction Sheet 02-1 .pdfView
  • Building Plan ApprovalMHADA_Sanction Sheet 01.pdfView
  • Layout ApprovalMHADA_Sanction layout-1.pdfView

Proforma allotment letter

  • Proforma allotment letterEM Gala vatap patra.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shivani (CT), Akola taluka

Survey, CTS, gat or plot numbers

100/193/393/3B94/1

As published on MahaRERA's project page

93/3,93/3B,94/1,100/1

Boundaries

North
Layout of other land owner
South
Part of Simplex mill
East
Layout Road
West
Layout of other land owner

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh Motiram Nanote—

Source: MahaRERA project page. Contact details are not shown.