Skip to content
Deedo home
Menu

Surya Garden No 3

Lapsed

Khadki Bk (Ct), Akola 444001 |Promoter: Ashfaque Majid Surya

Residential / Group HousingRERAP50100019025
28 Dec 2018Registered with MahaRERA
30 Apr 2019Promised completion
1Building
1Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Residential1 unit in all
Land area for this project
315 sq m (3,387 sq ft)
Permissible built-up area
342 sq m (3,686 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Address
Survey No 22/1 Plot No 5, Mangulpir Road, Khadki BkPIN 444001
Designated bank account
Csb Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Apr 2019

The latest completion date on record passed 7 years and 6 months ago.

Registered
28 Dec 2018
Promised
30 Apr 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010001902528 Dec 201830 Apr 2019—Ashfaque Majid SuryaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Surya Garden No 331

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1 unit registered

Residential · 1 unit
TypeCarpet areaUnits
Residential314.67 sq m · 3,387 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Surya Garden No 3

  • Excavation5%
  • Basement (if any)5%
  • Podiums (if any)0%
  • Plinth5%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & Footpaths1%
  • Water Supply11%
  • Sewerage (Chamber, Lines, Septic Tank , STP)11%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting55%
  • Street Lighting22%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting11%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking11%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 14 filings listed on MahaRERA's project page

Encumbrance details

Form B

Title report

Registration certificate

Other (3)

Layout plan

Show all 24 documentsShow fewer documents

Building plan

Allotment letter

Document library

  • Commencement Certificates / NA Order for plotted developmentIMG_0002.pdf · uploaded 22 Nov 2018View
  • Building Plan Approval (IOD)IMG-compressed.pdf · uploaded 22 Nov 2018View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 22 Nov 2018View
  • Proforma of Allotment letterIMG_0002.pdf · uploaded 22 Nov 2018View
  • Details of encumbrancesIMG_0003.pdf · uploaded 22 Nov 2018View
  • Declaration in FORM BFORM B.pdf · uploaded 23 Nov 2018View
  • OtherIMG.pdf · uploaded 5 Dec 2018View
  • Copy of the legal title reportLegal.pdf · uploaded 20 Dec 2018View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 23 Nov 2018View
  • Legal Title reportLegal.pdf · uploaded 20 Dec 2018View

Technical documents

  • Building Plan ApprovalIMG-compressed.pdfView
  • Layout ApprovalLAYOUT.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letterIMG_0002.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khadki Bk (CT), Akola taluka

Survey, CTS, gat or plot numbers

22/15SURVEY NO 22/1 PLOT NO 5

As published on MahaRERA's project page

SURVEY NO 22/1 PLOT NO 5

Boundaries

North
Another Layout
South
9 Mtr Layout Road
East
9 Mtr Layout Road
West
Layout Plot No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMahindra Khatal—
OtherMohammad Razik Mohammad Ayub—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology