Skip to content

Maya Enclave

Completed

Kaulkhed (530030), Akola 444001 |Promoter: Bharat Shantilal Ruparel

Residential / Group HousingRERAP50100045686
6 Jun 2022Registered with MahaRERA
31 Dec 2022Promised completion
1Building
19Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK, Shop19 units in all
Land area for this project
1,352 sq m (14,553 sq ft)
Permissible built-up area
1,320 sq m (14,205 sq ft)
Sanctioned built-up area
1,320 sq m (14,205 sq ft)
Address
12/1, Kaulkhed, Mangrulpir RoadPIN 444001
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
6 Jun 2022
Promised
31 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P501000456866 Jun 202231 Dec 2022—Bharat Shantilal RuparelProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Maya Enclave519

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

19 units registered

2BHK · 8 units3BHK · 8 unitsShop · 3 units
TypeCarpet areaUnits
2BHK56.17 sq m · 605 sq ft8
3BHK74.43 sq m · 801 sq ft8
Shop15.04 sq m · 162 sq ft2
Shop15.98 sq m · 172 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Maya Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAMC Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting100100%
  • Street Lighting100100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingDone100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Safety100%
  • Electrical meter room, sub-station, receiving stationAs per plan100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingGROUND FLOOR100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 27 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate (3)

Allotment letter (2)

Form B

Show all 46 documentsShow fewer documents

Other (5)

Registration certificate

Form 1

Layout plan (2)

Building plan (2)

Document library

  • Copy of the legal title reportRERA RUPAREL (2).pdf · uploaded 12 May 2022View
  • Details of encumbrancesRERA RUPAREL (3).pdf · uploaded 12 May 2022View
  • Copy of Layout Approval (in case of layout)RERA RUPAREL (4).pdf · uploaded 12 May 2022View
  • Building Plan Approval / NA Order for plotted developmentRERA RUPAREL (4).pdf · uploaded 12 May 2022View
  • Commencement Certificates / NA Order for plotted developmentRERA RUPAREL (5).pdf · uploaded 12 May 2022View
  • Proforma of Allotment letterRERA RUPAREL (9).pdf · uploaded 12 May 2022View
  • Declaration about Commencement CertificateRERA RUPAREL (10).pdf · uploaded 12 May 2022View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN.pdf · uploaded 20 May 2022View
  • Copy of Layout Approval (in case of layout)APPROVED LAYOUT.pdf · uploaded 20 May 2022View
  • Proforma of Allotment letterMODEL FORM OF AGREEMENT TO SALE IN RERA.pdf · uploaded 20 May 2022View
  • Declaration in FORM BFORM B DECLARATION.pdf · uploaded 26 May 2022View
  • CERSAI detailsRERA RUPAREL (13).pdf · uploaded 27 May 2022View
  • Disclosure of sold/ booked inventorysold.pdf · uploaded 30 Dec 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentompletion.pdf · uploaded 30 Dec 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)from 1-compressed.pdf · uploaded 30 Dec 2022View
  • Other – Technicalphoto.pdf · uploaded 2 Jan 2023View
  • Commencement Certificates / NA Order for plotted developmentRevised commencement.pdf · uploaded 21 Jul 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart occupancy.pdf · uploaded 21 Jul 2023Source
  • Building Plan Approval / NA Order for plotted developmentrevised sanctio drwg.pdf · uploaded 21 Jul 2023View

Promoter documents

  • Legal Title reportRERA RUPAREL (2).pdf · uploaded 12 May 2022View
  • Declaration Form BFORM B DECLARATION.pdf · uploaded 26 May 2022View

Technical documents

  • Layout ApprovalRERA RUPAREL (4).pdfView
  • Building Plan ApprovalRERA RUPAREL (4).pdfView
  • Building Plan ApprovalBUILDING PLAN.pdfView
  • Layout ApprovalAPPROVED LAYOUT.pdfView
  • Building Plan Approvalrevised sanctio drwg.pdfView

Proforma allotment letter

  • Proforma allotment letterRERA RUPAREL (9).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kaulkhed (530030), Akola taluka

Survey, CTS, gat or plot numbers

12/1

As published on MahaRERA's project page

12/1

Boundaries

North
Service Lane Than Land Of Owner
South
15 Mtr Road
East
Open Land Of Shri Sunil Innani
West
Land Of Mhada Field

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShyam Kanhaiyasing Thakur—
Chartered accountantVInay Balmukund Thavrani—
Engineershoeb Khan Ismail Khan—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology