Skip to content
Deedo home
Menu

Vishwamukh Residency

Completed

Hingna Mhaispur, Akola 444004 |Promoter: Deepak Rajesh Agrawal

31 Oct 2023Registered with MahaRERA
31 Jul 2025Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Land area for this project
1,260 sq m (13,563 sq ft)
Permissible built-up area
1,877 sq m (20,204 sq ft)
Sanctioned built-up area
1,877 sq m (20,204 sq ft)
Address
Plot No 4, 5 And 6 Cts No./Survey No. 5, Mauje Hingna Mhaispur, Tq. Distt. Akola, Jin Mata Nagar, AkoliPIN 444004
Designated bank account
Akola Janata Commercial Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.68102, 76.99911
Vishwamukh Residency is at latitude 20.68102, longitude 76.99911.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jul 2025

The latest completion date on record passed 1 year and 3 months ago.

Registered
31 Oct 2023
Promised
31 Jul 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010005339231 Oct 202331 Jul 2025—Deepak Rajesh AgrawalProject page

2 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Vishwamukh Residency - Flats And ShopsClosed/Covered00000
Vishwamukh Residency - Flats And ShopsOpen Space000042
Vishwamukh Residency - Row HousesClosed/Covered00000
Vishwamukh Residency - Row HousesOpen Space000042

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vishwamukh Residency - Flats And Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Vishwamukh Residency - Row Houses

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAS PER PLAN100%
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANKS AS PER PLAN100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingSTREET LIGHTING OVER INTERNAL ROAD100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONE SINGLE METER FOR COMMON AREAS100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking34 SCOOTERS 8 CAR MINI BUS100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 28 filings listed on MahaRERA's project page

Commencement certificates

Title

Encumbrances

Form b

Others

Allotment letters

Registration certificate

Form 1

Form 2

Form 4

Completion

Layout plan

Building plan

Document library

  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN APPROVAL.pdf · uploaded 24 Aug 2023View
  • Commencement Certificates / NA Order for plotted developmentAMC BUILDING PERMISSION.pdf · uploaded 24 Aug 2023View
  • Proforma of Allotment letterPROFORMA ALLOTMENT LETTER_compressed.pdf · uploaded 24 Aug 2023View
  • Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 13 Sep 2023View
  • a Details of encumbrances concerned to FinanceIMG_20230913_0003.pdf · uploaded 13 Sep 2023View
  • b Details of encumbrances concerned to LegalIMG_20230913_0003.pdf · uploaded 13 Sep 2023View
  • Declaration in FORM BFORM B.pdf · uploaded 13 Sep 2023View
  • CERSAI detailsCERSAI DECLARATION.pdf · uploaded 13 Sep 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS.pdf · uploaded 13 Sep 2023View
  • Deviation Report with respect to Allotment letterDEVIATION ALLOTMENT LETTER.pdf · uploaded 13 Sep 2023View
  • Deviation Report with respect to model copy of AgreementDEVIATION AGREEENT TO SALE.pdf · uploaded 13 Sep 2023View
  • Copy of Layout Approval (in case of layout)combinepdf.pdf · uploaded 14 Sep 2023View
  • Proforma of Agreement for saleATS.pdf · uploaded 14 Sep 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samecombinepdf_compressed.pdf · uploaded 14 Sep 2023View
  • Declaration about Commencement CertificateVishwamukh Residency_Form D.pdf · uploaded 14 Sep 2023View
  • Other – TechnicalDeclaration for Sanctioned Plan and Others.pdf · uploaded 14 Sep 2023View
  • Other – LegalKARIDI.pdf · uploaded 6 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 10 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 10 May 2024View
  • Disclosure of sold/ booked inventorySOLD UNSLOD LIST.pdf · uploaded 13 May 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 20 Oct 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 20 Oct 2024View

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 13 Sep 2023View
  • Declaration Form BFORM B.pdf · uploaded 13 Sep 2023View

Technical documents

  • Building Plan ApprovalBUILDING PLAN APPROVAL.pdfView
  • Layout Approvalcombinepdf.pdfView

Other legal documents

  • Other – LegalKARIDI.pdfView

Proforma allotment letter

  • Proforma allotment letterPROFORMA ALLOTMENT LETTER_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Hingna Mhaispur, Akola taluka

Survey, CTS, gat or plot numbers

455566 CTS NO./SURVEY NO. 5PLOT NO 4

As published on MahaRERA's project page

PLOT NO 4, 5 AND 6 CTS NO./SURVEY NO. 5, MAUJE HINGNA MHAISPUR, TQ. DISTT. AKOLA

Boundaries

North
Layout Plot No 3
South
Layout Plot No 7
East
Layout Plot Nos 17b 18ab
West
15 Mtrs Wide Existing Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShyam Thakur—
Chartered accountantVishalkumar Rajkumar Rajpal—
EngineerShyam Thakur—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology