30 Mar 2022Promised completion
8Buildings
8Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
8
Unit types
Row House8 units in all
Land area for this project
658 sq m (7,084 sq ft)
Permissible built-up area
695 sq m (7,486 sq ft)
Sanctioned built-up area
695 sq m (7,486 sq ft)
Address
Plot No. A3 to A10, Survey No. 12/1 and 12/3, Behind Geeta Nagar, Akoli khurd, Akola, Akoli KhurdPIN 444001
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Royal Galaxy Row Houses is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2022

The latest completion date on record passed 4 years and 7 months ago.

Registered
24 Sep 2020
Promised
30 Mar 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010002646124 Sep 202030 Mar 2022—Royal GalaxyProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A1021
A321
A421
A521
A621
A721
A821
A921

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

8 units registered

Row House · 8 units
BuildingTypeCarpet areaUnits
A10Row House78.13 sq m · 841 sq ft1
A3Row House78.13 sq m · 841 sq ft1
A4Row House78.13 sq m · 841 sq ft1
A5Row House78.13 sq m · 841 sq ft1
A6Row House78.13 sq m · 841 sq ft1
A7Row House78.13 sq m · 841 sq ft1
A8Row House78.13 sq m · 841 sq ft1
A9Row House78.13 sq m · 841 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A10Closed/Covered00000
A10Open Space00001
A3Closed/Covered00000
A3Open Space00001
A4Closed/Covered00000
A4Open Space00001
A5Closed/Covered00000
A5Open Space00001
A6Closed/Covered00000
A6Open Space00001
A7Closed/Covered00000
A7Open Space00001
A8Closed/Covered00000
A8Open Space00001
A9Closed/Covered00000
A9Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septik Tank100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingOpen Parking100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

20 documents held by Deedo, 30 filings listed on MahaRERA's project page

Form b

Title

Registration certificate

Form 5s

Completions

Others

Building plans

Layout plan

Allotment letter

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 17 Sep 2020View
  • Details of encumbrancesEncumberance Certificate.PDF · uploaded 17 Sep 2020Source
  • Copy of Layout Approval (in case of layout)Commencement Certificate.pdf · uploaded 17 Sep 2020View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 17 Sep 2020View
  • Declaration in FORM BDeclaration Form B.pdf · uploaded 17 Sep 2020View
  • OtherCredia.PDF · uploaded 17 Sep 2020View
  • Building Plan Approval / NA Order for plotted developmentA3 A4.pdf · uploaded 17 Sep 2020View
  • Proforma of Allotment letteragreenment to sale.pdf · uploaded 17 Sep 2020View
  • Building Plan Approval / NA Order for plotted developmentA5 A6.pdf · uploaded 17 Sep 2020View
  • Building Plan Approval / NA Order for plotted developmentA7 A9 A10.pdf · uploaded 17 Sep 2020View
  • Building Plan Approval / NA Order for plotted developmentA8.pdf · uploaded 17 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 20-21.pdf · uploaded 15 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 15 Feb 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA3.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA4.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA5.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA6.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA7.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA9.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA10.pdf · uploaded 6 Dec 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA8.pdf · uploaded 13 Dec 2023View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 17 Sep 2020View
  • Declaration Form BDeclaration Form B.pdf · uploaded 17 Sep 2020View

Technical documents

  • Layout ApprovalCommencement Certificate.pdfView
  • Building Plan ApprovalA3 A4.pdfView
  • Building Plan ApprovalA5 A6.pdfView
  • Building Plan ApprovalA7 A9 A10.pdfView
  • Building Plan ApprovalA8.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letteragreenment to sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akoli Kh., Akola taluka

Survey, CTS, gat or plot numbers

12/112/312/3Plot No. A3 to A10Survey No. 12/1

As published on MahaRERA's project page

Plot No. A3 to A10, Survey No. 12/1 and 12/3

Boundaries

North
Road
South
Survey No 16
East
Plot No A2
West
Plot no 25

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnurag Shriram Agrawal—
Chartered accountantHemant Agrawal—
EngineerSandesh Surendra Gawli—
OtherShaikh Rahatullah Shaikh Barkatullah—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology