Kalpana Siddhi

Lapsed

Akola (Rural), Akola 444001 |Promoter: Mukund Keshravrao Mali

Residential / Group HousingRERAP50100047400
27 Oct 2022Registered with MahaRERA
30 Sep 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
584 sq m (6,286 sq ft)
Permissible built-up area
1,493 sq m (16,072 sq ft)
Sanctioned built-up area
1,493 sq m (16,072 sq ft)
Planning authority
Akola Municipal Corporation
Address
Plot No. 10/11/12/B, Survey No. 8/1/172, Pimpdhe Nagar, Shastri NagarPIN 444001
Designated bank account
Akola Janata Commercial Cooperative Bank
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.70541, 77.01326
Kalpana Siddhi is at latitude 20.70541, longitude 77.01326.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2025

The latest completion date on record passed 1 year and 1 month ago.

Registered
27 Oct 2022
Promised
30 Sep 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010004740027 Oct 202230 Sep 2025—Mukund Keshravrao MaliProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Kalpana Siddhi5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered48120060
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Kalpana Siddhi

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTap Water0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tanks50%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation25%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting25%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

31 documents held by Deedo, 36 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificates

Form b

Others

Allotment letters

Registration certificate

Form 1s

Form 2s

Form 2as

Form 5s

Layout plan

Building plans

Document library

  • Copy of the legal title reportLegal Search Report.pdf · uploaded 1 Oct 2022View
  • a Details of encumbrances concerned to FinanceFinance Declaration.pdf · uploaded 1 Oct 2022View
  • b Details of encumbrances concerned to LegalLegal Declaration.pdf · uploaded 1 Oct 2022View
  • Copy of Layout Approval (in case of layout)NA Order_NA Map.pdf · uploaded 1 Oct 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 1 Oct 2022View
  • Declaration about Commencement CertificateDeclaration about commencement certificate.pdf · uploaded 1 Oct 2022View
  • Declaration in FORM BForm B Declaration.pdf · uploaded 1 Oct 2022View
  • CERSAI detailsDeclaration about security interest along with CERSAI_Search_Report.pdf · uploaded 1 Oct 2022View
  • Proforma of Allotment letterDraft Allotment Letter.pdf · uploaded 1 Oct 2022View
  • Proforma of Agreement for saleDraft Allotment Letter.pdf · uploaded 1 Oct 2022View
  • Proforma of Agreement for saleDraft Agreement to sale format.pdf · uploaded 1 Oct 2022View
  • Proforma of Allotment letterDraft Agreement to sale format.pdf · uploaded 1 Oct 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate Bank Declaration.pdf · uploaded 1 Oct 2022View
  • Deviation Report with respect to Allotment letterDeclaration about Devaition in allotment letter.pdf · uploaded 1 Oct 2022View
  • Deviation Report with respect to model copy of AgreementDeclaration about devaiation in agreenment to sale.pdf · uploaded 1 Oct 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Sanction Map.pdf · uploaded 12 Oct 2022View
  • Form 2A (FY 2022-2023)Form 2A 2023.pdf · uploaded 15 Aug 2025View
  • Form 2A (FY 2023-2024)Form 2A 2024.pdf · uploaded 15 Aug 2025View
  • Form 2A (FY 2024-2025)Form 2A 2025.pdf · uploaded 15 Aug 2025View
  • Form 5 (FY 2022-2023)Form 5 22-23.pdf · uploaded 15 Aug 2025View
  • Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 15 Aug 2025View
  • Form 1Form 1 310325.pdf · uploaded 15 Aug 2025View
  • Form 2Form 2 310325.pdf · uploaded 15 Aug 2025View
  • Disclosure of Sold and Booked InventorySold unsold 310325.pdf · uploaded 15 Aug 2025View
  • Withdrawal Update Form 1Form 1 300625.pdf · uploaded 19 Sep 2025View
  • Withdrawal Update Form 2Form 2 300625.pdf · uploaded 19 Sep 2025View

Promoter documents

  • Legal Title reportLegal Search Report.pdf · uploaded 1 Oct 2022View
  • Declaration Form BForm B Declaration.pdf · uploaded 1 Oct 2022View

Technical documents

  • Layout ApprovalNA Order_NA Map.pdfView
  • Building Plan ApprovalBuilding Sanction Map.pdfView
  • Building Plan ApprovalBuilding sanction plan.pdfView
  • Annexure-A as per order 50/2024Annexure A.pdfView

Other legal documents

  • OthersLegal Declaration.pdfView

Financial documents

  • OthersFinance Encumberance.pdf · uploaded 15 Aug 2025View

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterDraft Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akola (Rural), Akola taluka

Survey, CTS, gat or plot numbers

10/11/12/B8/1/172Plot No. 10/11/12/BSurvey No. 8/1/172

As published on MahaRERA's project page

Plot No. 10/11/12/B, Survey No. 8/1/172

Boundaries

North
Road
South
Service Lane
East
Plot No 10 11 12 A
West
Plot No 10 11 12 C

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShyam Thakur—
Chartered accountantAgrawal Bajoria Padiya & Associates—
Chartered accountantPC Bhandari and Co.—
EngineerManish P Gawande—

Source: MahaRERA project page. Contact details are not shown.