BLD_008069Promised date passed4 floors
Vitthal Rukmini Appartment No 9 · Vitthalrukmini Appartment No 9
Akola (M Corp.) · RERA P50100004831
4Sanctioned habitable floorsregistration certificate
30 Jun 2018Promised completion
Floors
4 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 4
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 101 | 49.9 m² (537 sq.ft) | 1 | not published |
| 102 | 54.8 m² (589 sq.ft) | 1 | not published |
| 103 | 36.7 m² (395 sq.ft) | 1 | not published |
| 104 | 34.8 m² (375 sq.ft) | 1 | not published |
| 201 | 49.9 m² (537 sq.ft) | 1 | not published |
| 202 | 54.8 m² (589 sq.ft) | 1 | not published |
| 203 | 36.7 m² (395 sq.ft) | 1 | not published |
| 204 | 34.8 m² (375 sq.ft) | 1 | not published |
| 301 | 49.9 m² (537 sq.ft) | 1 | not published |
| 302 | 54.8 m² (589 sq.ft) | 1 | not published |
| 303 | 36.7 m² (395 sq.ft) | 1 | not published |
| 304 | 34.8 m² (375 sq.ft) | 1 | not published |
| G1 | 52.8 m² (569 sq.ft) | 1 | not published |
| Total | 13 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor90%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
- Sanitary Fittings within the flats / premises70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology