The Blessing Tower

Lapsed

Akola (M Corp.), Akola 444004 |Promoter: Shree Swami Developers

22 May 2023Registered with MahaRERA
31 Dec 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
1,025 sq m (11,029 sq ft)
Permissible built-up area
3,400 sq m (36,601 sq ft)
Sanctioned built-up area
3,400 sq m (36,601 sq ft)
Planning authority
AKOLA MUNICIPAL CORPORATION
Address
Plot No. 13 And 14, Survey No. 27/3, Sahakar Nagar, Near Petrol Pump, Malkapur Akola Road, Akola, Gaurakshan RoadPIN 444004
Designated bank account
Akola Janata Commercial Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.69227, 77.01609
The Blessing Tower is at latitude 20.69227, longitude 77.01609.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
22 May 2023
Promised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010005106122 May 202331 Dec 2024—Shree Swami DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
The Blessing Tower7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

The Blessing Tower

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank Constructed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

28 documents held by Deedo, 32 filings listed on MahaRERA's project page

Commencement certificate (2)

Form B

Form 1 (2)

Other (10)

Show all 60 documentsShow fewer documents

Other (10)

Encumbrance details (2)

Form 2 (2)

Allotment letter (2)

Title report

Registration certificate

Form 5 (2)

Occupancy / completion certificate

  • Occupancy / completion certificate14 Mar 2024ViewSource

Layout plan

Building plan

Document library

  • Copy of Layout Approval (in case of layout)LAYOUT NA ORDER .pdf · uploaded 14 Dec 2022View
  • Building Plan Approval / NA Order for plotted developmentDRG - SIGNED_compressed.pdf · uploaded 14 Dec 2022View
  • Commencement Certificates / NA Order for plotted developmentCOMMENSEMENT LETTER - REVISED.pdf · uploaded 14 Dec 2022View
  • Proforma of Allotment letterSwami Developers 01 - Allotment Letter.pdf · uploaded 14 Dec 2022View
  • Proforma of Agreement for saleSwami Developers 02 - Agreement to Sale.pdf · uploaded 14 Dec 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 14 Dec 2022View
  • Declaration about Commencement CertificateFORMAT D.pdf · uploaded 14 Dec 2022View
  • Declaration in FORM BAFFIDAVIT.pdf · uploaded 14 Dec 2022View
  • a Details of encumbrances concerned to FinanceDECLARATION - ENCUMBARANCE.pdf · uploaded 27 Feb 2023View
  • b Details of encumbrances concerned to LegalDECLARATION - ENCUMBARANCE.pdf · uploaded 27 Feb 2023View
  • Declaration about Commencement CertificateCOMMENSEMENT LETTER - REVISED.pdf · uploaded 27 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 27 Feb 2023View
  • Deviation Report with respect to Allotment letterDECLARATION - DEVIATION IN ALLOTMENT LETTER.pdf · uploaded 28 Feb 2023View
  • Deviation Report with respect to model copy of AgreementDECLARATION - DEVIATION IN AGREEMENT FOR SALE.pdf · uploaded 28 Feb 2023View
  • CERSAI detailsCERSAI - PERVIOUS OWNERS.pdf · uploaded 28 Feb 2023View
  • CERSAI detailsCERSAI CERTIFICATE.pdf · uploaded 28 Feb 2023View
  • Other – TechnicalCREDIA.pdf · uploaded 28 Feb 2023View
  • Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 8 Mar 2023View
  • CERSAI detailsUNDERTAKING FOR CERSAI.pdf · uploaded 8 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - KISHOR KAPADE - DISCOLUSER FOR INTEREST IN OTHER REALS PROJECTS.pdf · uploaded 8 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A - MANOJ AGRAWAL - DISCOLUSER FOR INTEREST IN OTHER REALS PROJECTS.pdf · uploaded 8 Mar 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A - BANK DETAILS.pdf · uploaded 8 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)SWAMI DEVELOPERS FORM NO 1.pdf · uploaded 14 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SWAMI DEVELOPERS FORM NO 2.pdf · uploaded 14 Mar 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Occupancy CERTIFICATE 2.pdf · uploaded 14 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA FORM 5 2021-22.pdf · uploaded 14 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA FORM 5 2022-23.pdf · uploaded 14 Mar 2024View

Promoter documents

  • Declaration Form BAFFIDAVIT.pdf · uploaded 14 Dec 2022View
  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 8 Mar 2023View

Technical documents

  • Layout ApprovalLAYOUT NA ORDER .pdfView
  • Building Plan ApprovalDRG - SIGNED_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterSwami Developers 01 - Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akola (M Corp.), Akola taluka

Survey, CTS, gat or plot numbers

13141427/3PLOT NO. 13SURVEY NO. 27/3

As published on MahaRERA's project page

PLOT NO. 13 AND 14, SURVEY NO. 27/3

Boundaries

North
Service Line
South
Malkapur Akola Road
East
40ft Wide Layout Road
West
Layout Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManoj Manoharlal Virwani—
Chartered accountantAshish Anand Agrawal—
EngineerNikhil Vijaykumar Taori—
OtherSajid Husain Akbar Husain—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology